Buscar

PLANILHA ORÇAMENTÁRIA

Esta é uma pré-visualização de arquivo. Entre para ver o arquivo original

Orç
	
	
	OBRA:			REF. UTILIZADA:
	LOCAL:			MES DE REF.:
	DATA:			BDI:
	
	ORCAMENTO DESCRITIVO - PLANILHA ANALÍTICA								VALOR %
	ITEM	CODIGO SINAPI	DISCRIMINACAO	UNID.	QUANT.	VALOR			1.0000	0.0	0.00	0.00
						UNIT	UNIT. COM BDI	TOTAL
	1.0		SERVIÇOS PRELIMINARES					0.0
	1.1			M2	0.0	0.0	0.0	0.0
							0.0
	2.0		CANTEIRO DE OBRAS					0.0		BDI - Benefícios e Despesas Indiretas
	2.1			M2	0.0	0.0	0.0	0.0
							0.0
	3.0		SERVICOS TECNICOS					0.0
	3.1			M2	0.0	0.0	0.0	0.0
							0.0
	4.0		MOVIMENTO DE TERRA					0.0
	4.1			M3	0.0	0.0	0.0	0.0
							0.0
	5.0		INFRA-ESTRUTURA					0.0
	5.1			M3	0.0	0.0	0.0	0.0	0.0
							0.0
	6.0		IMPERMEABILIZACOES E PROTECOES DIVERSAS					0.0
	6.1			M2	0.0	0.0	0.0	0.0
							0.0
	7.0		PAREDES E PAINEIS					0.0
	7.1			M2	0.0	0.0	0.0	0.0
							0.0
	8.0		ESQUADRIAS / FERRAGENS / VIDRO					0.0
	8.1			M2	0.0	0.0	0.0	0.0
							0.0
	9.0		REVESTIMENTO E TRATAMENTO DE SUPERFÍCIES					0.0
	9.1			M2	0.0	0.0	0.0	0.0
							0.0
	10.0		PISOS					0.0
	10.1			M³	0.0	0.0	0.0	0.0
	
	11.0		COBERTURA					0.0
	11.1			M2	0.0	0.0	0.0	0.0
							0.0
	12.0		PINTURAS					0.0
	12.1			M2	0.0	0.0	0.0	0.0
							0.0
	13.0		INSTALACOES ELETRICAS					0.0
	13.1			M	0.0	0.0	0.0	0.0
	15.0		DIVERSOS					0.0
	15.1			M2	0.0	0.0	0.0	0.0
	
	TOTAL GERAL
	O VALOR DO PRESENTE ORÇAMENTO É:			VISTO:				ELABORADO POR:
	R$ 0.00
	
				_________________________
				RESPONSÁVEL TÉCNICO
Crono
	
	
	OBRA:
	LOCAL:
	
	CRONOGRAMA FÍSICO-FINANCEIRO
	ITEM	DESCRIÇÃO	VALOR	DIAS
				30 DIAS	60 DIAS	90 DIAS	120 DIAS
	1.0	SERVIÇOS PRELIMINARES	0.0	0.0
			100.00%	100.00%
	2.0	CANTEIRO DE OBRAS	0.0	0.0
			100.00%	100.00%
	3.0	SERVICOS TECNICOS	0.0	0.0
			100.00%	100.00%
	4.0	MOVIMENTO DE TERRA	0.0	0.0
			100.00%	100.00%
	5.0	INFRA-ESTRUTURA/SUPERESTRUTURA	0.0	0.0	0.0
			100.00%	50.00%	50.00%
	6.0	IMPERMEABILIZACOES E PROTECOES DIVERSAS	0.0		0.0
			100.00%		100.00%
	7.0	PAREDES E PAINEIS	0.0		0.0
			100.00%		100.00%
	8.0	ESQUADRIAS / FERRAGENS / VIDRO	0.0			0.0
			100.00%			100.00%
	9.0	REVESTIMENTO E TRATAMENTO DE SUPERFÍCIES	0.0			0.0
			100.00%			100.00%
	10.0	PISOS	0.0			0.0
			100.00%			100.00%
	11.0	COBERTURA	0.0			0.0
			100.00%			100.00%
	12.0	PINTURAS	0.0				0.0
			100.00%				100.00%
	13.0	INSTALACOES ELETRICAS	0.0		0.0	0.0
			100.00%		50.00%	50.00%
	14.0	LIMPEZA FINAL DA OBRA	0.0				0.0
			100.00%				100.00%
	DESEMBOLSO MENSAL (SEM BDI)		0.0	0.0	0.0	0.0	0.0