1.A customer has approved a proposal for two HPE ProLiant servers. The presales engineer has
selected the processors, memory capacity, and storage options. Before submitting the order, the
engineer needs to build a valid configuration and produce the bill of materials.
Which HPE tool should the engineer use?
A. HPE Power Advisor
B. HPE Smart Storage Administrator
C. HPE One Config Advanced
D. HPE Smart Update Manager
Answer: C
Explanation:
HPE One Config Advanced (OCA) is used to assemble HPE configurations using product configuration
rules and generate a bill of materials. The requirements and main components have already been
selected; the engineer now needs to turn those selections into a valid configuration for ordering.
Power Advisor estimates power requirements. Smart Storage Administrator configures supported
storage controllers, arrays, and logical drives. Smart Update Manager inventories systems and deploys
applicable firmware, driver, and system software updates. None of those tools performs the ordering
configuration task described here.
Blueprint objective: 6 — Use HPE Pre-Sales Tools.
References:
● HPE ProLiant for Azure Local QuickSpecs — OCA configuration and bill of materials
● HPE Compute Fundamentals — official course outline and presales tools
2.During a maintenance window, an administrator uses HPE SUM to update a ProLiant server. SUM
reports that a system ROM update has been installed and requires a server reboot. The administrator
restarts iLO, but the server still reports the previous active ROM version.
What should the administrator do next?
A. Run the ROM update again using the same update baseline.
B. Reboot the host server and check the active ROM version.
C. Refresh the firmware inventory without restarting the host.
D. Select the redundant ROM as the next boot image.
Answer: B
Explanation:
Resetting iLO restarts the management controller, not the host server. The update in this scenario
requires a host reboot before the new system ROM becomes active. The administrator should complete
that reboot during the maintenance window and then verify the active version.
Repeating a successfully installed update does not address the pending activation requirement.
Refreshing the inventory cannot activate the ROM. Selecting the redundant ROM changes which ROM
image the server will use; it is not the required next step for this successful update.
Blueprint objective: 8 — Describe how to update Firmware for HPE Compute.
References:
● HPE ProLiant documentation — requirements for firmware updates to take effect
● HPE iLO 6 User Guide — replacing the active system ROM with the redundant system ROM
3.A ProLiant server at a remote branch stops during POST. Its iLO interface remains accessible. The
3 / 8
support engineer needs to read the message currently displayed on the server console and review
previously recorded hardware faults. The required iLO license and user privileges are available.
Which TWO iLO features should the engineer use?
A. Integrated Remote Console
B. Virtual Media
C. iLO Event Log
D. Integrated Management Log
E. Power Meter
Answer: AD
Explanation:
Integrated Remote Console lets the engineer view the server's current console display, including POST
messages, without a running host operating system. Integrated Management Log (IML) provides
recorded server hardware events, such as memory and power supply faults.
The iLO Event Log records events observed by iLO, including logins, some configuration changes,
server resets, and power outages. For the component fault history requested here, IML is the appropriate
choice. Virtual Media presents remote media to the server, while Power Meter provides power
consumption information. Neither supplies the console view or component fault history requested here.
Blueprint objective: 9 — Describe how to manage HPE Compute with HPE iLO.
References:
● HPE Integrated Lights-Out QuickSpecs — remote console and management features
● HPE ProLiant troubleshooting guide — Integrated Management Log
● HPE iLO 7 User Guide — events recorded in the iLO Event Log
4.An engineer configures six 1.92 TB SSDs as a single RAID 10 logical drive on a supported HPE
storage controller. All six drives participate in the array, arranged as three mirrored pairs. There are no
spare drives.
Which combination correctly describes the usable capacity and drive failure tolerance? Ignore formatting
and metadata overhead.
A. 9.60 TB; the array can survive any one drive failure.
B. 5.76 TB; the array can survive any three drive failures.
C. 7.68 TB; the array can survive any two drive failures.
D. 5.76 TB; the array can survive one drive failure in each mirrored pair.
Answer: D
Explanation:
RAID 10 stores two copies of the data using mirrored pairs. Usable capacity is half the combined drive
capacity: 6 × 1.92 TB ÷ 2 = 5.76 TB.
The array remains accessible as long as each mirrored pair retains a working drive. It can therefore
survive three failed drives if they belong to three different pairs. It cannot survive every possible
combination of three failures: losing both drives in any pair causes data loss.
Option B has the correct capacity but overstates the protection.
Options A and C describe the capacity and drive failure tolerance of RAID 5 and RAID 6, respectively, for
six equal-sized drives.
Blueprint objective: 2 — Identify HPE Compute Components.
References:
4 / 8
● HPE Intelligent Provisioning User Guide — RAID 1 and RAID 1+0 (RAID 10)
5.An engineer is preparing a ProLiant DL380 Gen10 server with an HPE Smart Array SR controller. No
operating system is installed. The engineer needs to configure the local array and logical drive before
starting the operating system installation.
Which utility can perform this task from the server's Intelligent Provisioning environment?
A. HPE Smart Storage Administrator
B. HPE Smart Update Manager
C. HPE Active Health System Viewer
D. HPE iLO Virtual Media
Answer: A
Explanation:
HPE Smart Storage Administrator (SSA) configures arrays and logical drives on supported Smart Array
SR controllers. It can run offline through Intelligent Provisioning, so an installed operating system is not
required for this task.
SUM deploys updates rather than creating the array. Active Health System Viewer analyzes collected
health information. iLO Virtual Media can present an installation or utility image to a server, but mounting
that image does not itself configure the storage controller. The controller family is specified because
storage configuration tools differ between controller families.
Blueprint objective: 7 — Describe how to deploy HPE Servers.
References:
● HPE ProLiant DL380 Gen10 Maintenance and Service Guide — Smart Storage Administrator
● HPE Smart Array SR Gen10 Controller User Guide — offline and online SSA operation
6.A retailer operates supported HPE ProLiant servers across 40 stores. The infrastructure team wants a
vendor-hosted management service with a single console for server health and firmware lifecycle
operations. Company policy permits the required cloud connections, and the team does not want to
maintain an on-premises management appliance.
Which solution best meets these requirements?
A. HPE OneView running as a local appliance
B. HPE iLO Federation
C. HPE Compute Ops Management
D. HPE Intelligent Provisioning
Answer: C
Explanation:
HPE Compute Ops Management provides a cloud-based service for managing supported servers across
distributed locations. Its centralized console and server lifecycle capabilities fit the retailer's management
and hosting requirements.
A local OneView appliance conflicts with the stated preference for a vendor-hosted service. iLO
Federation provides group management capabilities, but it is not the requested hosted management
service. Intelligent Provisioning handles individual server deployment and maintenance rather than
providing the centralized service described inthe scenario.
Blueprint objective: 4 — Describe HPE Compute Management Options.
References:
5 / 8
● HPE Developer Portal — Compute Ops Management
● HPE Compute Ops Management — distributed server lifecycle management
7.During deployment, the physical disks appear in the storage controller utility, but they are unassigned.
The deployment design requires a hardware RAID 1 boot volume.
What must be configured before installing the OS to that volume?
A. Assign a boot disk as a global spare.
B. Choose a physical disk as the boot device.
C. Create a RAID 1 boot logical drive.
D. Create a RAID 0 boot logical drive.
Answer: C
Explanation:
The controller must present a mirrored logical drive before the OS can be installed to the required
hardware RAID target. RAID 0 provides no mirror. Boot selection does not create a logical drive, and
assigning a spare does not create the required two-member mirror.
Blueprint objective: 7 — Describe how to deploy HPE Servers.
References:
● HPE Smart Array SR configuration with SSA
8.Intelligent Provisioning cannot reach its firmware source. A workstation on the same provisioning VLAN
can reach that source through the site proxy. Intelligent Provisioning has a valid address, gateway, and
DNS configuration, but no proxy is configured.
Which setting should the engineer change first?
A. The dedicated iLO port VLAN assignment.
B. The proxy setting in Intelligent Provisioning.
C. The proxy setting in the host OS installation image.
D. The boot order in UEFI System Utilities.
Answer: B
Explanation:
The successful workstation test uses a proxy that is missing from the provisioning environment.
Configure that proxy in Intelligent Provisioning and retest. An OS image setting does not configure the
running preboot environment. Changing iLO connectivity or boot order does not address the identified
difference.
Blueprint objective: 8 — Describe how to update Firmware for HPE Compute.
References:
● HPE Intelligent Provisioning network and update preferences
9.At a remote site, a ProLiant server has no bootable OS. The engineer can reach iLO and has the
required license and privileges. An approved installation ISO is on the management workstation.
Which TWO actions let the engineer start the installer and interact with its setup screens? Select TWO
answers.
A. Copy the ISO to the iLO firmware repository.
B. Open the iLO Virtual Serial Port for a graphical installer.
C. Select the empty local logical drive as the one-time boot device.
6 / 8
D. Open the iLO remote console and select the virtual media boot device.
E. Connect the ISO through iLO Virtual Media.
Answer: DE
Explanation:
Virtual Media presents the workstation ISO as a host boot device. The remote console provides the
display and keyboard access needed to select that device and use the installer. The firmware repository
is not the virtual-media mount point. An empty local drive has no installer, and a serial connection does
not provide the graphical console.
Blueprint objective: 7 — Describe how to deploy HPE Servers.
References:
● HPE Integrated Lights-Out QuickSpecs
● HPE ProLiant configuration, deployment, and update utilities
10.A server uses a dedicated iLO network connection. Its host OS network configuration becomes
unusable, but iLO remains reachable.
What does this demonstrate?
A. The OS is now using the dedicated iLO port.
B. The dedicated iLO management path remains available.
C. Application traffic has moved to a standby VLAN.
D. The host NIC team has restored application connectivity.
Answer: B
Explanation:
The dedicated iLO connection operates separately from the host OS network configuration. Its
availability establishes a management path, but gives no evidence that OS teaming, application routing,
or a switch VLAN change restored the host network.
Blueprint objective: 9 — Describe how to manage HPE Compute with HPE iLO.
References:
● HPE iLO 6 Security Technology Brief
● HPE Integrated Lights-Out QuickSpecs
11.A three-host cluster must support its full workload after any one host fails. Each host provides 256 GB
of usable VM memory after platform overhead. No memory overcommit is allowed.
What is the maximum aggregate VM memory allocation that meets this requirement?
A. 768 GB
B. 640 GB
C. 256 GB
D. 512 GB
Answer: D
Explanation:
One failed host leaves two available hosts. At 256 GB of usable VM memory each, the remaining
capacity is 512 GB. Allocating all 768 GB would leave insufficient capacity after a failure. This calculation
assumes the workloads can be redistributed and the other resources also meet the availability
requirement.
Blueprint objective: 5 — Recognize Customer Requirements.
7 / 8
References:
● HPE Compute Fundamentals official course outline
12.Before approving a compute proposal, the customer wants to see the management workflow. No
evaluation hardware is available onsite.
Which HPE presales resource should the partner check for a suitable demonstration?
A. HPE Solution Sizer.
B. HPE Demonstration Portal.
C. HPE Power Advisor.
D. HPE One Config Advanced.
Answer: B
Explanation:
The Demonstration Portal is the presales resource to check for a suitable demonstration and access.
Solution Sizer supports sizing, OCA supports configurations and bills of materials, and Power Advisor
models power. Those planning outputs do not provide the requested management demonstration.
Blueprint objective: 6 — Use HPE Pre-Sales Tools.
References:
● HPE Compute Fundamentals official course outline
13.A partner has the expected VM count, peak resource demand, and growth assumptions. The
immediate task is to estimate an appropriate server configuration before building the orderable bill of
materials.
Which workflow fits this task?
A. Validate an OCA build, then use validation as workload sizing.
B. Export iLO inventory, then order the same installed configuration.
C. Size the workload, then configure the recommendation in OCA.
D. Model input power, then derive VM capacity from that value.
Answer: C
Explanation:
Sizing translates workload demand and growth assumptions into resource requirements. OCA then turns
the selected design into an orderable configuration. A valid configuration, a power estimate, and an
installed inventory answer different questions; none establishes that the proposed capacity meets the
projected VM demand.
Blueprint objective: 6 — Use HPE Pre-Sales Tools.
References:
● HPE Compute Fundamentals official course outline
14.An inference application requires an accelerator with at least 48 GB of device memory and a runtime
that supports accelerator families X and Y. Two server-qualified cards fit the chassis: X has 24 GB, and Y
has 48 GB. Performance testing has not yet started.
Which card can proceed to the workload pilot?
A. The Y card, because it meets the stated runtime and memory requirements.
B. The X card, with the remaining model memory allocated as ordinary host RAM.
C. Either card, because both are qualified for the server.
8 / 8
D. The X card, with a larger OS boot volume to hold the model.
Answer: A
Explanation:
The Y card satisfies both entry requirements for the pilot; testing must still establish latency and
throughput. Server qualification alone does not establish application suitability. The scenario provides no
supported mechanism for replacing required device memory with host RAM or boot storage.
Blueprint objective: 5 — Recognize Customer Requirements.
References:
● HPE Compute Fundamentals official course outline
● HPE ProLiant Compute DL380 Gen12 QuickSpecs
15.With a small IT team, the customer wants help operating its HPE products, including access to
technical specialists and advice on using product features.
Which proposed service deliverable most directly meets that need?
A. A scheduled installation service for the new equipment.
B. Access to product expertise and operational guidance.
C. A defined onsite hardware response interval.
D. Retention of replaced drives at the customer site.
Answer: B
Explanation:
Technical expertise and operational guidanceaddress the request for help using and operating the
products. Onsite response addresses hardware incidents, media retention addresses handling of
replaced storage, and installation addresses initial deployment. The selected service description must
include the requested deliverables.
Blueprint objective: 1 — Identify the HPE Compute Portfolio.
References:
● HPE support services comparison

Mais conteúdos dessa disciplina