D-VXR-DY-23 Dell Technologies VxRail Deploy 2023 exam dumps questions are
the best material for you to test all the related DELL EMC exam topics. By using
the D-VXR-DY-23 exam dumps questions and practicing your skills, you can
increase your confidence and chances of passing the D-VXR-DY-23 exam.
Features of Dumpsinfo’s products
Instant Download
Free Update in 3 Months
Money back guarantee
PDF and Software
24/7 Customer Support
Besides, Dumpsinfo also provides unlimited access. You can get all
Dumpsinfo files at lowest price.
Dell Technologies VxRail Deploy 2023 D-VXR-DY-23 exam free dumps
questions are available below for you to study. 
Full version: D-VXR-DY-23 Exam Dumps Questions
1.VxRail Validation is failing for a deployment engineer during initialization. The error states that Node
1 cannot reach Node 2 on the Management network. While investigating the issue, the deployment
engineer is unable to ping the management network default gateway.
Which step in the VxRail Configuration Portal should have been followed to prevent the situation?
A. The Pre-Deployment Checklist should have been reviewed and issues resolved.
B. The cluster should have been configured with two virtual distributed switches.
C. The VxRail Manager and vCenter server must be logically separated on different subnets.
D. The NIC Configuration must be set to 4x25GbE to support the network devices.
Answer: A
2.How does the Network Validation Tool (NVT) validate Top of Rack (ToR) switch configurations?
A. NVT requires switch logon information and parses through the running-config of the switch
 1 / 12
https://www.dumpsinfo.com/unlimited-access/
https://www.dumpsinfo.com/exam/d-vxr-dy-23
B. Using the switch grab batch file, the output is imported into the NVT User Interface
C. The running-config is imported into the NVT User Interface
D. Top of Rack switches are always manually validated prior to implementation
Answer: A
3.For which VxRail models must the iDRAC NIC Selection be set to Dedicated?
A. D, G, P, S, and V Series
B. E, P, S, and V Series only
C. D, E, P, S, and V Series
D. D, E, and G Series
Answer: D
4.Which tool is required to re-image a VxRail G560F system?
A. POST
B. RASR
C. MBS
D. BOSS
Answer: B
5.What is a requirement to set up a supported VxRail Stretched Cluster?
A. VxRail nodes with 10 GbE
B. G560 with one chassis
C. All-Flash configuration
D. Identical VxRail nodes
Answer: A
6.Which command is used to restart the Loudmouth process on an ESXi node?
A. /usr/IibAmiware/loudmouth/bin/loudmouthd restart
B. systemcti restart loudmouth
C. /etc/int.d/loudmouth restart
D. systemcti restart vmware-loudmouth
Answer: C
7.What network setting is the optional configuration on the port group for a customer-supplied VDS
before the VxRail cluster is deployed?
A. Assign NIC uplinks
B. Enable and configure NIOC
C. Configure NIC teaming and failover
D. Enable NIC teaming and failover
Answer: B
8.How must node ports on Dell EMC ToR switches be configured when the Spanning Tree Protocol is
enabled in an environment?
A. In Port-Channel mode
B. In Forwarding status
C. As edge ports
 2 / 12
https://www.dumpsinfo.com/
D. As access ports
Answer: C
9.A VxRail 7.0.100 environment is managed by the internal vCenter Server. The customer asks the
implementation engineer to deploy a new VxRail cluster using the existing vCenter Server.
What should the response of the engineer?
A. Supported by neither the internal vCenter Server nor external vCenter Server
B. Not supported on VxRail software 7.0.100
C. Not supported for internal vCenter Server
D. Only supported on VxRail software 4.7.xxx
Answer: D
10.What is the correct sequence of steps to perform a RASR Factory Reset using an SD card?
Answer:
 3 / 12
https://www.dumpsinfo.com/
11.Which user provided block of IP addresses to the VxRail initialization wizard may contain non-
contiguous addresses?
A. VMware Virtual SAN
B. ESXi host
C. vSphere vMotion
D. NTP Servers
Answer: D
12.Use the VxRail simulator to explore the system.
What is the presented configuration? Note: It fs necessary to close (x) the simulator window before
you can select a response to this question.
A. Internal vCenter and external DNS
B. Internal vCenter and Internal DNS
C. External vCenter and external DNS
D. External vCenter and internal DNS
Answer: A
 4 / 12
https://www.dumpsinfo.com/
13.After finishing the rack and stack of a VxRail Model G410 cluster, in which sequence should the
nodes be powered on?
A. All four at the same time
B. Any order possible
C. Forward order (1 - 4)
D. Reverse order (4 - 1)
Answer: B
14.After a successful installation, where in VxRail Manager should you collect logs?
A. CONFIG > General > Log Collection > Generate New Log Bundle
B. CONFIG > General > System Diagnostics > Generate New Log Bundle
C. CONFIG > System > Log Collection > Diagnose
D. CONFIG > System > System Diagnostics > Diagnose
Answer: C
15.A customer is running a 5-node VxRail all flash cluster with vSAN advanced licensing. They are
unable to apply a RAID-6 Erasure Coding storage policy to the VMs.
What could be the cause?
A. vSAN license level is incorrect and needs upgrading.
B. Incorrect number of failure domains in the cluster.
C. VxRail cluster only supports mirroring with an FTT of 1.
D. RAID-6 Erasure Coding is only supported with stretched clusters.
Answer: B
16.When the Network Services Validation is enabled, what does the VxRail NVT validate?
A. STP and VLAN configurations
B. IP address conflicts, NTP, and DNS settings
C. VLAN configurations, NTP, and DNS settings
D. VLAN configurations and port mode settings
Answer: B
17.A VxRail API request has been executed and the user account does not have vCenter privileges to
perform the task What code is returned?
A. 200
B. 207
C. 403
D. 500
Answer: D
18.Where is the VxRail Documentation Quick Reference List located?
A. Dell Technologies Support Page
B. VxRail Configuration Portal
C. Dell Technologies Central
D. Dell Technologies SolVe Online
Answer: A
 5 / 12
https://www.dumpsinfo.com/
19.What environmental components of a 3-node VxRail cluster must be assigned IP addresses?
A. vSAN, Witness Traffic Separation, vRealize Log Insight, and vMotion
B. ESXi Mgmt, vSAN, vMotion, and iDRAC
C. ESXi Mgmt, vCenter, Witness Traffic Separation, and iDRAC
D. vRealize Log Insight, vSAN, VxRail Manager, and Private Management Network
Answer: B
20.A customer has decided that they will be using the Spanning Tree protocol in their Dell EMC ToR
switches.
How should the switch ports used for VxRail be configured to achieve a successful deployment?
A. Enable MLD snooping and querier
B. Set the port type to edge
C. Set the port mode to access
D. Enable link aggregation for all ports
Answer: B
21.You are configuring a VxRail to connect to an existing, external SRS VE. The customer's support
account is associated with the Site ID/Party ID where VxRail is installed. A validation error is issued
when you attempt to register VxRail in SRS.
What is the possible cause for the error?
A. Wrong IP address was used for SRS VE gateway
B. Number of deployed devices on SRS gateway has exceeded the maximum
C. SRS traffic goes through a proxy server
D. Status of VxRail in Install Base is Shipped
Answer: D
22.What must be enabled on ToR switch ports connected to VxRail nodes to support multiple
VLANs?
A. Access Mode
B. Link Aggregation
C. Trunk Mode
D. Rapid Spanning Tree
Answer: C
23.Which step is required to enable VxRail Manager capabilities to register the system, obtain product
license files, update system software, download VxRail documentation, and browse VxRail
Community?
A. Enable the cluster/VDS/management accounts when using an external vCenter
B. Enable EMC Secure Remote Support (ESRS)
C. Configure VMware Secure Support Account (vSSA) access
D. Set the Username and Password for the Support Account
Answer: A
24.Where canan administrator find steps to perform a manual verification of the customer network?
A. Customer Simplified Form
B. Dell EMC VxRail Network Planning Guide
C. Dell Technologies SolVe Online
 6 / 12
https://www.dumpsinfo.com/
D. Pre-Engagement Questionnaire (PEQ)
Answer: C
25.What is the maximum number of nodes supported in a standard VxRail Appliance configuration?
A. 8
B. 32
C. 64
D. 128
Answer: C
26.A local upgrade is planned for a VxRail 7.0.xxx cluster.
For which Service VMs are snapshots recommended prior to the upgrade?
A. VMware vCenter Appliance
VMware vRealize Operations
B. VMware vCenter Appliance
VMware vCenter Server PSC
C. VxRail Manager
VMware Log Insight
D. VMware vCenter Appliance
VxRail Manager
Answer: D
27.What is the first step when preparing for a VxRail deployment using the VxRail configuration
portal?
A. Enter configuration information using a wizard
B. Create the JSON file
C. Create the YAML file
D. Initiate BOM using the Dell Support Portal
Answer: A
28.During the installation of a new VxRail cluster, where is System Time configured?
A. System BIOS > Miscellaneous Settings
B. iDRAC Settings > System Time
C. System BIOS > System Information
D. iDRAC Settings > System Profile Settings
Answer: A
29.What output logs are collected using the vc-support.sh script?
A. vCenter log bundle
B. ESXi log bundle
C. vRealize Log Insight support bundle
D. VxRail Manager log bundle
Answer: B
30.An implementation engineer is logged into the vSphere Client of a recently deployed VxRail
cluster. They want to review the versions of all the installed VxRail software components.
 7 / 12
https://www.dumpsinfo.com/
Which view should they use to gather this information?
A. Host and Clusters > VxRail Cluster > Configure > VxRail > Updates
B. Host and Clusters > VxRail Cluster > Configure > VxRail > System
C. Menu > Administration > Solutions > Client Plugins
D. Hosts and Clusters > VxRail Cluster > Monitor > VxRail > Appliances
Answer: A
31.What is the complete list of menu option choices available in the RASR factory reset procedure
when booting from the RASR ISO?
A. - RASR RESET
- CREATE RASRUSB
- FACTORY RESET
- REBOOT
- UPDATE FIRMWARE
- QUIT
B. - RASR RESET
- CREATE RASRUSB
- FACTORY RESET
- UPDATE FIRMWARE
- EXIT
C. - RASR RESET
- CREATE RASRUSB
- FACTORY RESET
- REBOOT
- UPDATE FIRMWARE
- EXIT
D. - RASR RESET
- CREATE RASRUSB
- FACTORY RESET
- QUIT
Answer: D
32.What is the name of the default port group with VLAN ID 3939 on an unconfigured VxRail node?
A. Private Management Network
B. Private Discovery Network
C. Management Network
D. Discovery Network
Answer: A
33.During a VxRail deployment validation check it is discovered that the Top of Rack (ToR) switches
have Spanning Tree Protocol enabled.
What should be done before the implementation can proceed?
A. Confirm that ToR switch ports connected to VxRail nodes are configured to get into "forwarding"
mode quickly.
B. Confirm that ToR switch ports connected to VxRail nodes have fabric-trunk enabled.
C. Disable STP on the ToR switches
D. Confirm that isolated VLANs exist on the ToR switches for each of the VxRail networks.
Answer: A
 8 / 12
https://www.dumpsinfo.com/
34.What is the maximum number of supported nodes in a VxRail Stretch Cluster?
A. 16
B. 32
C. 64
D. 30
Answer: C
35.What is the VxRail maximum cluster size if using 10 GbE links?
A. 8
B. 16
C. 32 with an RPQ
D. 64 with an RPQ
Answer: D
36.Which vSAN feature requires an All-Flash cluster?
A. Data-at-Rest Encryption
B. Storage Policy Based Management
C. Data-in-Transit Encryption
D. Deduplication and compression
Answer: D
37.A VxRail deployment has been completed. The implementation engineer wants to generate the As-
Built Configuration report.
How do they obtain the required VxRail XML file?
A. Generate it from the VxRail PEQ by clicking the Create PEQ Data File button
B. Use FTP to copy the file from the VxRail Manager VM
C. Download it from the vSphere Client - VxRail Last Configuration Data Sent
D. Download it from the VxRail Deployment Wizard after a successful deployment
Answer: C
38.For how many days are the vSphere evaluation licenses valid in a new VxRail implementation?
A. 30
B. 45
C. 60
D. 90
Answer: C
39.In which three VxRail Configuration Portal locations can an implementation engineer download the
cluster configuration file? (Select 3)
A. From the My Deployments tab in the VxRail Configuration Portal
B. From the Validate Configuration File tab when editing a cluster
C. From the Resources tab in the Edit Cluster Configuration wizard
D. From the customer Dell Digital Locker website
E. From the My Clusters Tab in the VxRail Configuration Portal
Answer: ABE
 9 / 12
https://www.dumpsinfo.com/
40.Due to limitations in data center power at the primary site, an asymmetrical VxRail Stretched
Cluster has been deployed. Site 1 contains 12 hosts, Site 2 contains 16 hosts, and the Witness Host
is in the third site. The administrator has configured affinity rules to run the heavier workloads in Site
2.
What vSAN storage policy settings should be used to ensure adequate workload distribution and data
redundancy between sites?
A. None - keep data on Non-Preferred (stretched cluster)
1 failure - RAID-1 (Mirroring)
B. Dual site mirroring (stretched cluster)
2 failures - RAID-1 (Mirroring)
C. None - keep data on Non-Preferred (stretched cluster)
No Data Redundancy
D. None - stretched cluster
No Data Redundancy
Answer: A
41.What is a requirement for Top of Rack (ToR) switch VxRail node ports?
A. Enable Spanning Tree
B. Disable IGMP Snooping
C. Enable IGMP Querier
D. Disable Link Aggregation
Answer: D
42.An infrastructure system audit will begin in two weeks All data center devices will be checked to
ensure they contain the installed patches and configurations. A system engineer will update the
VxRail hosts with the latest patches and remediate security vulnerabilities.
What troubleshooting resource can a user receive from Dell and use proactively to help perform the
remediation tasks?
A. KB articles
B. Advisories
C. Log files
D. SolVe Online
Answer: C
43.A VxRail Cluster has deduplication and compression enabled.
Which set of statements is correct?
A. Deduplication is applied at the Cluster level.
Deduplication creates unique 2 KB blocks.
Compression is applied after deduplication.
Compression is applied after being written to SSD.
B. Deduplication is applied at the disk group level.
Deduplication creates unique 4 KB blocks.
Compression is applied after deduplication.
Compression is applied before being written to SSD.
C. Deduplication is applied at the disk group level.
Deduplication creates unique 2 KB blocks.
Compression is applied after deduplication.
Compression is applied before being written to SSD.
 10 / 12
https://www.dumpsinfo.com/
D. Deduplication is applied at the Cluster level.
Deduplication creates unique 4 KB blocks.
Compression is applied before deduplication.
Compression is applied after being written to SSD.
Answer: B
44.What is a benefit of using the VxRail REST API?
A. Polling for vSAN performance statistics
B. Automated log collection for VxRail clusters
C. Automated security audit of VxRail clusters
D. Remote upgrades of iDRAC related software only
Answer: B
45.A company has a simple, 4 node VxRail cluster. The VxRail is running version 3.5 and utilizes a
vSphere standard license. The company has asked for a VxRail software upgrade.
What are the steps for the upgrade?
A. Log in to VxRail Manager, select "Internet Upgrade", then follow the prompts.
B. Log in to support.emc.com and download the upgrade packages.
C. Place all four nodes into maintenance mode.
D. Contact Dell EMC support to request the upgrade to the VxRail cluster.
Answer: B
46.What can be used to determine whether hardware faults exist on a VxRail prior to its deployment?
A. PEQ
B. VxRail NVT
C. VxRail Pre-validation
D. iDRACAnswer: D
47.What are the requirements for a customer-supplied VDS in a VxRail deployment?
A. 4 or 8 uplinks
Port groups for Discovery, Management, vMotion, and vSAN only
B. 2 or 4 uplinks
Port groups for Discovery, Management, vMotion, and vSAN only
C. 2 or 4 uplinks
Port groups for Discovery, Management vCenter Server, vMotion, and vSAN
D. 4 or 8 uplinks
Port groups for Discovery, Management, vCenter Server, vMotion, and vSAN
Answer: C
48.Which options can be checked by the Network Validation Tool for VxRail?
A. Network Services, Upstream Switches, and Storage Networks
B. ToR Switches, Upstream Switches, and Storage Networks
C. Network Services, ToR Switches, and Storage Networks
D. Network Services, ToR Switches, and Upstream Switches
Answer: D
 11 / 12
https://www.dumpsinfo.com/
49.You require a service tag for a VxRail service request. Where could you find this?
A. Appliance level physical view
B. Secure Remote Services device list
C. VxRail Manager BIOS
D. Cluster level physical view
Answer: A
50.When installing VxRail hardware and configuring iDRAC settings, which methods can be used per
SolVe documentation?
A. Press F10 on post, use System setup
Use Lifecycle controller interface
B. Press F2 on post, use System setup
DB9 to USB cable to configure
C. Using Lifecycle controller interface
DB9 to USB cable to configure
D. Using System Setup during Post
Micro USB Direct connection to node
Answer: D
51.Which activities must be completed as part of VxRail hardware installation?
A. Verify the time setting on each node before the first-run process
Verify existence of PSNT in the DCUI
Confirm that the Port Group VLAN IDs are configured as intended
B. Verify existence of PSNT in the DCUI
Configure and use the default management network VLAN IDs
Confirm that the Port Group VLAN IDs are configured as intended
C. Configure iDRAC for remote accessibility to perform out of band system
Modify and configure the default management network VLAN IDs
Confirm that the external management VLAN ID is tagged
D. Confirm that the external management VLAN ID is tagged
Configure iDRAC for remote accessibility to perform out of band system
Verify the time setting on each node before the first-run process
Answer: A
52.What is a requirement for the vSAN Data-at-Rest Encryption?
A. All-Flash or AII-NVMe VxRail
B. VxRail with at least 3 nodes
C. External Key Management Server
D. External customer provided vCenter
Answer: C