Logo Passei Direto
Material
Study with thousands of resources!

Text Material Preview

Nutanix Certified
Professional -
Multicloud
Infrastructure (NCP-
MCI v6.10)
Version: Demo
[ Total Questions: 10]
Web: www.dumpscafe.com
Email: support@dumpscafe.com
Nutanix
NCP-MCI-6.10
https://www.dumpscafe.com
https://www.dumpscafe.com/Braindumps-NCP-MCI-6.10.html
IMPORTANT NOTICE
Feedback
We have developed quality product and state-of-art service to ensure our customers interest. If you have any 
suggestions, please feel free to contact us at feedback@dumpscafe.com
Support
If you have any questions about our product, please provide the following items:
exam code
screenshot of the question
login id/email
please contact us at and our technical experts will provide support within 24 hours.support@dumpscafe.com
Copyright
The product of each order has its own encryption code, so you should use it independently. Any unauthorized 
changes will inflict legal punishment. We reserve the right of final explanation for this statement.
Nutanix - NCP-MCI-6.10Pass Exam
1 of 10Verified Solution - 100% Result
A. 
B. 
C. 
D. 
Category Breakdown
Category Number of Questions
Manage Nutanix clusters 4
Manage Virtual Machine creation, deployment, and migration 5
Configure Disaster Recovery and Data Protection 1
TOTAL 10
Question #:1 - [Manage Nutanix clusters]
Refer to Exhibit:
After adding new workloads, why isOverall Runway below 365 daysand the scenario still shows the cluster is 
in good shape?
Because Storage Runway is still good.
Because new workloads are sustainable.
Because there are recommended resources.
Because the Target is 1 month.
Answer: B
Explanation
Nutanix - NCP-MCI-6.10Pass Exam
2 of 10Verified Solution - 100% Result
A. 
B. 
C. 
D. 
InNutanix Capacity Planning,Overall Runwayrepresents how long the cluster can support current and new 
workloads before resources are exhausted.
Even if the runway is below 365 days, the system considers the cluster to be in good shape if new workloads 
are sustainable (Option B).
Option A is incorrect: Storage runway alone is not the only factor; CPU and memory are equally important.
Option C is incorrect: The presence of recommended resources does not mean the cluster is in good shape.
Option D is incorrect: The target of 1 month affects projections but does not explain why the cluster is in good 
shape.
References:
Nutanix Prism Central # Capacity Runway and Planning
Nutanix Bible # Workload Placement and Cluster Sizing
Nutanix Support KB # Capacity Planning Best Practices
Question #:2 - [Manage Virtual Machine creation, deployment, and migration]
What additional step is required for LCM to upgrade an AHV host that has GPUs?
Use Direct Uploads to upload appropriate driver bundles.
Run LCM in dark site mode so it can update AHV independently.
Create an agent VM on each host that has GPU drivers installed.
Update NCC to the latest version and re-run Inventory.
Answer: A
Explanation
Nutanix Life Cycle Manager (LCM) relies on validated firmware and driver bundles for hardware 
components. For GPU-enabled hosts, LCM documentation states:
“GPU-enabled AHV hosts require GPU driver bundles to be uploaded manually via the Direct Uploads 
mechanism so that LCM can validate and upgrade the necessary GPU components during workflow 
execution.”
GPU drivers are vendor-specific and not always available in the standard catalog, so the administrator must 
upload them before LCM can orchestrate the upgrade.
Running in dark site mode does not provide missing GPU bundles. Creating agent VMs is unrelated to GPU 
driver operations. Updating NCC improves validations but does not provide GPU support files.
Nutanix - NCP-MCI-6.10Pass Exam
3 of 10Verified Solution - 100% Result
A. 
B. 
C. 
D. 
Therefore, Direct Uploads of GPU driver bundles is required.
Question #:3 - [Manage Virtual Machine creation, deployment, and migration]
Refer to Exhibit:
An administrator is looking at thememory cluster runway diagramas shown in exhibit, in Prism Central. The 
environment hasthree hostswith the following configuration:
CPU: 2x Intel Xeon Gold (8 cores, 2.6 GHz)
RAM: 256 GB per host
Storage: SSDs and HDDs
TheIntelligent Operations featurehas been active forone month, but no further configurations were applied.
What does the dotted red line mean?
It is thedefault trend analysis static thresholdthat can be manually set.
It is themaximum memory the administrator can assign to VMs.
It is thecalculated memory oversubscription limitfor currently running VMs.
Nutanix - NCP-MCI-6.10Pass Exam
4 of 10Verified Solution - 100% Result
D. 
A. 
B. 
C. 
D. 
It is theusable capacity based on cluster configuration options.
Answer: C
Question #:4 - [Manage Virtual Machine creation, deployment, and migration]
An administrator wants toensure that user VMs on AHV hostscan take advantage ofbandwidth beyond a 
single adapter in a bond.
Which uplink Bond Type should the administrator configure to accomplish this?
No Uplink Bond
Active-Active
Active-Active with MAC pinning
Active-Backup
Answer: B
Explanation
Active-Active bonding allows multiple network interfaces to be used simultaneously, improving bandwidth 
and redundancy.
Option B (Active-Active) is correct:
This mode enablesload balancing across all available adapters, providinghigher throughput and fault tolerance.
Option A (No Uplink Bond) is incorrect:
Without a bond, VMscannot benefit from multiple adapters.
Option C (Active-Active with MAC pinning) is incorrect:
MAC pinningbinds traffic to a single NIC, limiting bandwidth distribution.
Option D (Active-Backup) is incorrect:
This modeonly provides failover, not increased bandwidth.
References:
Nutanix AHV Networking Guide #Bonding Modes and Load Balancing
Nutanix KB #Optimizing Network Throughput in AHV
Nutanix - NCP-MCI-6.10Pass Exam
5 of 10Verified Solution - 100% Result
A. 
B. 
C. 
D. 
Question #:5 - [Manage Nutanix clusters]
The customer expects to maintain a cluster runway of 9 months. The customer doesn’t have a budget for 6 
months but they want to add new workloads to the existing cluster.
Based on the exhibit, what is required to meet the customer's budgetary timeframe?
Add resources to the cluster.
Postpone the start of new workloads.
Delete workloads running on the cluster.
Change the target to 9 months.
Answer: B
Question #:6 - [Manage Virtual Machine creation, deployment, and migration]
An administrator is experiencingstorage performance issueson aWindows Server 2019 VMwith the following 
configuration:
vCPU: 1
VRAM: 8 GB
vSCSI: VirtIO SCSI Controller
vDisk: 2 (100 GB, 250 GB)
vNIC: VirtIO Fast Ethernet
Nutanix - NCP-MCI-6.10Pass Exam
6 of 10Verified Solution - 100% Result
A. 
B. 
C. 
D. 
A. 
TheAHV cluster is healthy, andother Windows VMs are performing well.
Which configuration change should be reviewed to enhance VM performance?
Add a second virtual storage controller (vSCSI).
Enable Balance-TCP on bridge (br0).
Increase Controller VM (CVM) resources.
Increase the VM’s number of vCPUs.
Answer: D
Explanation
A single vCPU is likely causing a bottleneck, limiting the VM’s ability to process I/O requests efficiently.
Option D (Increase the VM’s number of vCPUs) is correct:
Windowsrequires sufficient CPU resourcesto handle disk and network operations.
Adding more vCPUs allows the VM to process more I/O operations simultaneously, improving performance.
Option A is incorrect:
AdditionalvSCSI controllers are only useful for very high disk I/O workloads.
Option B is incorrect:
Balance-TCP applies to network traffic, not storage performance.
Option C is incorrect:
CVM resources do not directly affect individual VM performance.
References:
Nutanix AHV Performance Tuning Guide
Nutanix KB#Optimizing Windows VM Performance on AHV
Question #:7 - [Configure Disaster Recovery and Data Protection]
An administrator isprotecting an application and its datastored onVolume GroupsusingProtection Domains.
Duringfailovertests, allapplication VMs restore successfully, but theapplication data is completely missing.
How can the Protection Domain configuration be adjusted to avoid this issue in the future? (Choose two.)
Nutanix - NCP-MCI-6.10Pass Exam
7 of 10Verified Solution - 100% Result
A. 
B. 
C. 
D. 
Select the "Auto protect related entities" checkbox.
Manually add Volume Groups to Protected Entities.
Place Volume Groups in a separate Protection Domain.
Use application-consistent snapshots.
Answer: A B
Explanation
Protection Domains (PDs) in Nutanix ensure that entire applications and their associated data are protected 
during failover.However,Volume Groups (VGs) are not automatically includedunless explicitly configured.
Option A (Select "Auto protect related entities") is correct:
This setting ensures thatassociated Volume Groups, networks, and other dependencies are included in the 
Protection Domainautomatically.
Without enabling this, only the VM itself would be protected, leading tomissing application data upon 
failover.
Option B (Manually add Volume Groups to Protected Entities) is correct:
If"Auto protect related entities" is not enabled, the administrator mustmanually add Volume Groups to the 
Protection Domain.
This ensures that bothVMs and their attached Volume Groupsare replicated and recovered together.
Option C (Place Volume Groups in a separate Protection Domain) is incorrect:
Separating Volume Groups into a different PDdoes not guarantee they failover together with VMs.
It is best practice tokeep related VMs and Volume Groups in the same PD.
Option D (Use application-consistent snapshots) is incorrect:
Whileapplication-consistent snapshots improve data integrity, theydo not fix missing Volume Groups in 
failover scenarios.
References:
Nutanix Disaster Recovery Guide#Protection Domain Configuration and Volume Groups
Nutanix KB#Ensuring Volume Groups Are Included in Disaster Recovery Failovers
Question #:8 - [Manage Nutanix clusters]
Nutanix - NCP-MCI-6.10Pass Exam
8 of 10Verified Solution - 100% Result
A. 
B. 
C. 
D. 
After upgradingPrism Central from PC2022.1 to PC2024.1, an administrator isunable to log inwith theirIAM 
domain account.
What is the first troubleshooting step the administrator should take?
Ping the Domain Controller from the CVM.
Ensure port 9441 is open in the firewall.
Validate the trusted signing certificate of the organization.
Log in with a local admin account.
Answer: D
Explanation
After a Prism Central upgrade, IAM authentication settings may require reconfiguration.
Option D (Log in with a local admin account) is correct:
If IAM authentication fails, thelocal admin account must be usedto check domain settings.
Option A (Ping the Domain Controller) is incorrect:
Network connectivity is important, but theissue is likely related to IAM settings, not network reachability.
Option B (Check firewall port 9441) is incorrect:
Port 9441 is used forSSO authentication, butport issues usually result in login delays, not complete failures.
Option C (Validate signing certificate) is incorrect:
While certificates can cause issues,local admin login should always work.
References:
Nutanix KB #Troubleshooting IAM Login Issues After a Prism Central Upgrade
Nutanix Documentation #Managing User Authentication and IAM Integration
Question #:9 - [Manage Nutanix clusters]
An administrator needs to create astorage containernamed TestData with the following conditions:
Replication Factor (RF) = 1 (RF1)
Inline Compression enabled
Nutanix - NCP-MCI-6.10Pass Exam
9 of 10Verified Solution - 100% Result
A. 
B. 
C. 
D. 
Deduplication disabled
Maximum storage capacity = 100 GiB
How should the administrator complete this task?
Log intoPrism Elementand create the storage container with anAdvertised Capacity of 100 GiB.
Log intoPrism Elementand create the storage container.
Log intoPrism Centraland create the storage container with aReserved Capacity of 100 GiB.
Log intoPrism Centraland create the storage container.
Answer: A
Explanation
When creating a storage container in Nutanix, the administrator must configure the correctcapacity settings:
Option A (Prism Element with Advertised Capacity of 100 GiB) is correct:
Advertised Capacitydefineslogical limitsfor the container (i.e., how much space it reports as available).
Inline Compressioncan be enabled directly in Prism Element.
Option B (Create in Prism Element without Advertised Capacity)is incorrect:
Without specifyingAdvertised Capacity, the container may consume unlimited storage.
Option C (Create in Prism Central with Reserved Capacity)is incorrect:
Reserved Capacityapplies toQuality of Service (QoS) policies, not storage limits.
Option D (Create in Prism Central without capacity limits)is incorrect:
Prism Central can manage storage but does not directly enforceRF1 and compression policies.
References:
Nutanix Storage Management Guide #Creating and Managing Storage Containers
Nutanix Bible #Replication Factor (RF) and Data Optimization
Nutanix KB #Inline Compression Best Practices in Nutanix AOS
Question #:10 - [Manage Virtual Machine creation, deployment, and migration]
An administrator has been asked tocalculate baseline Capacity Runwayon anewly registered AHV cluster.
Nutanix - NCP-MCI-6.10Pass Exam
10 of 10Verified Solution - 100% Result
A. 
B. 
C. 
D. 
The cluster has been running for16 days, butno runway projections are displayed.
Why are no Capacity Runway projections being displayed?
Capacity Planning requires at least 30 days of data.
Capacity Planning requires at least 21 days of data.
Capacity Planning requires at least 3 months of data.
Capacity Planning requires at least 6 months of data.
Answer: A
About dumpscafe.com
dumpscafe.com was founded in 2007. We provide latest & high quality IT / Business Certification Training Exam 
Questions, Study Guides, Practice Tests.
We help you pass any IT / Business Certification Exams with 100% Pass Guaranteed or Full Refund. Especially 
Cisco, CompTIA, Citrix, EMC, HP, Oracle, VMware, Juniper, Check Point, LPI, Nortel, EXIN and so on.
View list of all certification exams: All vendors
 
 
 
We prepare state-of-the art practice tests for certification exams. You can reach us at any of the email addresses 
listed below.
Sales: sales@dumpscafe.com
Feedback: feedback@dumpscafe.com
Support: support@dumpscafe.com
Any problems about IT certification or our products, You can write us back and we will get back to you within 24 
hours.
https://www.dumpscafe.com
https://www.dumpscafe.com/allproducts.html
https://www.dumpscafe.com/Microsoft-exams.html
https://www.dumpscafe.com/Cisco-exams.html
https://www.dumpscafe.com/Citrix-exams.html
https://www.dumpscafe.com/CompTIA-exams.html
https://www.dumpscafe.com/EMC-exams.html
https://www.dumpscafe.com/ISC-exams.html
https://www.dumpscafe.com/Checkpoint-exams.html
https://www.dumpscafe.com/Juniper-exams.html
https://www.dumpscafe.com/Apple-exams.html
https://www.dumpscafe.com/Oracle-exams.html
https://www.dumpscafe.com/Symantec-exams.html
https://www.dumpscafe.com/VMware-exams.html
mailto:sales@dumpscafe.com
mailto:feedback@dumpscafe.com
mailto:support@dumpscafe.com