				PLANILHA PARA CÁLCULO E ORÇAMENTO DE PROJETOS EM TUBULÕES
												Autor: Eng. Civil Guilherme Magalhães Almeida
							Melhor visualizado em 1024 x 768 pixels					Matr. 315255
												TJDFT - SERCIV
												Tel: (61)3103-7759
				Licenciado para: TRIBUNAL DE JUSTIÇA DO DISTRITO FEDERAL E TERRITÓRIOS
																										ESTE MÓDULO DO SOFTWARE AINDA ESTÁ EM FASE DE DESENVOLVIMENTO. AGUARDE O LANÇAMENTO DA NOVA VERSÃO!!!
	5
																																																																																																																			1		DATA
																																																																																																																			1		CONTADOR
VOLTAR
ORÇAROUCALCULAR
	
			O QUE VOCÊ DESEJA FAZER?
QUERO ORÇAR UM TUBULÃO CIRULAR JÁ CALCULADO
QUERO CALCULAR UM TUBULÃO DE BASE OVAL (FALSA ELIPSE)
Voltar para o menu inicial
QUERO ORÇAR UM TUBULÃO OVAL (FALSA ELIPSE) JÁ CALCULADO
QUERO CALCULAR UM TUBULÃO DE BASE CIRCULAR
ISOL
	
		TUBULÃO DE BASE CIRCULAR	ENTRADA				RESULTADOS	fuste alter
		fck (kg/cm2)	200.00	D (cm)	460.67	ADOTAR	465.00	vinc teste
		Taxa do terrento sigma s (kg/cm2)	3.00	d (cm)	91.59	ADOTAR	95.00
		Carga Q (Tf)	500.00	h (cm)	320.42	ADOTAR	325.00
		Perfuração do fuste Pf (m)	12.00	ATENÇÃO! h = 325 > h lim = 200
		Limite para altura da base - h lim (cm)	200.00	valor do fuste recalculado = 235 cm
		NÚMERO DE REPETIÇÕES	1.00
		TAXA DO TERRENO NECESSÁRIA PARA H=200 CM (kg/cm2)	6.03
		CARGA MÁXIMA PARA H=200 CM (Tf)	194.24
		Ângulo da base alfa (graus)	60.35
		Área da base (m2)	16.98
		Área do fuste (m2)	0.71
		Volume da base (m3)	24.91
		Volume alargamento base (m3)	22.61
		Volume total (m3)	31.11
		Valor do fuste para h lim = 200 cm	235.00
		Área da base com fuste alterado (m2)	16.98
		Área do fuste com a alteração (m2)	4.34
		Volume da base com fuste alterado (m3)	21.34
		Vol. alargamento da base com fuste alterado (m3)	12.66
		Volume total com fuste alterado (m3)	64.71
		Percentual de aumento do volume total com alteração do fuste	108.00%
		CARGA ATUANTE	500.00
		CARGA MAXIMA	194.24		CP 100	4	1
					CP 135		2
					CP 150		3
					CP 200		4
		TAXA CALCULADA	6.03		CP 250		5
		TAXA ORIGINAL	3.00		CP 300		6
					CP 400		7
					CP 500		8
RECALCULAR OS PARÂMETROS ABAIXO
Alternar fuste
Recalcula fuste quando h > h lim
COTAÇÃO
	
			COTAÇÃO DOS INSUMOS
			MÃO DE OBRA	UNIDADE	PREÇO	Nivel	min	1.00
			Armador	h	3.31	de	med	2.00
			Carpinteiro	h	3.31	Perdas	máx	3.00
			Pedreiro	h	3.31	Perdas =	2
			Servente	h	2.13
			Poceiro	h	3.31
			MATERIAIS	UNIDADE	PREÇO	TAXA DE LEIS SOCIAIS (%)		124.00
			Concreto C-15 usinado - p/ tubulões	M3	275.32
			Concreto estrutural C15 usinado - p/ blocos	M3	275.32
			Armadura CA-50 diam. 12,5 mm	KG	4.16
			Arame Recozido, 18 BWG	KG	11.75
			Cimento comum	KG	0.39
			Brita 1	M3	66.27
			Areia lavada	M3	83.73
			Tábua 1''x12'' , pinus ou similar	METRO	7.21
			Sarrafo 1''x4'' , pinus ou similar	METRO	2.58
			Pontalete 3''x3'' , pinus ou similar	METRO	9.19
			Prego 18x30	KG	6.85
			Desmoldante para formas	LITRO	6.99
			COMPOSIÇÕES
					Nível de perdas
			Perfuração do fuste (CIRULARES)	ml	mín	med	máx	adotada	preço
			Servente	h	5.4285	6.0317	7.2380	6.0317	4.77	28.78
			Pocerio	h	5.4285	6.0317	7.2380	6.0317	7.41	44.72
										Total:	73.50
			Perfuração do fuste (OVAIS)	ml	mín	med	máx	adotada	preço
			Servente	h	3.0535	3.3928	4.0714	3.3928	4.77	16.19
			Pocerio	h	3.0535	3.3928	4.0714	3.3928	7.41	25.16
										Total:	41.34
			Alargamento da base	m3	mín	med	máx	adotada	preço
			Servente	h	10.0000	12.0000	14.0000	12.0000	4.77	57.25
			Pocerio	h	12.0000	14.0000	16.0000	14.0000	7.41	103.80
										Total:	161.06
			Lançamento de concreto C-15 - p/ tubulões	m3	mín	med	máx	adotada	preço
			Concreto C-15 usinado	m3	1.0300	1.0500	1.0700	1.0500	275.32	289.09
			Pedreiro	h	3.0000	4.0500	4.8600	4.0500	7.41	30.03
			Servente	h	3.0000	4.0500	4.8600	4.0500	4.77	19.32
										Total:	338.44
			Colocação de ferragem de topo - CA-50 12mm	kg	mín	med	máx	adotada	preço
			Armadura CA-50 diam. 12,5mm	kg	1.0800	1.1500	1.2500	1.1500	4.16	4.78
			Arame recozido, 18 BWG	kg	0.0200	0.0200	0.0200	0.0200	11.75	0.24
			Armador	h	0.0700	0.0900	0.1100	0.0900	7.41	0.67
			Servente	h	0.0700	0.0900	0.1100	0.0900	4.77	0.43
										Total:	6.12
			Escavação manual	m3	mín	med	máx	adotada	preço
			Servente	h	1.6000	2.1700	2.6000	2.1700	4.77	10.35
										Total:	10.35
			Lastro de concreto magro	m3	mín	med	máx	adotada	preço
			Cimento comum	kg	209.0000	220.0000	242.0000	220.0000	0.39	85.80
			Areia média - lavada e peneirada	m3	0.6631	0.6980	0.7678	0.6980	83.73	58.44
			pedra 1	m3	0.8342	0.8780	0.9658	0.8780	66.27	58.19
			Pedreiro	m3	3.0000	4.0500	4.8600	4.0500	7.41	30.03
			Servente	h	4.0000	5.4000	6.4800	4.0500	4.77	19.32
										Total:	251.78
			Corte e preparo de cabeça de tubulão	Unidade	mín	med	máx	adotada	preço
			Pedreiro	h	0.2400	0.2500	0.2600	0.2500	7.41	1.85
			Servente	h	2.4000	2.5000	2.6000	2.5000	7.41	18.54
										Total:	20.39
			Confecção, colocação e remoção da fôrma	m2	mín	med	máx	adotada
			Tábua 1''x12'' , pinus ou similar	m	1.0000	1.0500	1.1000	1.0500	7.21	7.57
			Sarrafo 1''x4'' , pinus ou similar	m	3.5000	3.9000	4.1000	3.9000	2.58	10.06
			Pontalete 3''x3'' , pinus ou similar	m	0.9000	0.9800	1.0800	0.9800	9.19	9.01
			Prego 18x30	kg	0.1500	0.1600	0.1700	0.1600	6.85	1.10
			Desmoldante para formas	l	0.1500	0.1700	0.2000	0.1700	6.99	1.19
			Carpinteiro	h	1.3500	1.5000	1.5500	1.5000	7.41	11.12
			Servente	h	1.3500	1.5000	1.5500	1.5000	4.77	7.16
										Total:	47.20
			Dobramento e colocação da armadura	kg	mín	med	máx	adotada	preço
			Armadura CA-50 diam, 12,5 mm	kg	1.0800	1.1500	1.2500	1.1500	4.16	4.78
			Arame recozido , 18 BWG	kg	0.0200	0.0200	0.0200	0.0200	11.75	0.24
			Armador	h	0.0700	0.0900	0.1100	0.0900	7.41	0.67
			Servente	h	0.0700	0.0900	0.1100	0.0900	4.77	0.43
										Total:	6.12
			Lançamento e adensamento de concreto estrutural para blocos	m3	mín	med	máx	adotada	preço
			Servente	h	3.0000	4.0500	4.8600	4.0500	4.77	19.32
			Pedreiro	h	3.0000	4.0500	4.8600	4.0500	7.41	30.03
			Concreto usinado para blocos	m3	1.0000	1.0500	1.1000	1.0500	275.32	289.09
										Total:	338.44
			Reaterro	m3	mín	med	máx	adotada	preço
			Servente	h	1.5000	2.0300	2.4300	2.0300	4.77	9.69
										Total:	9.69
			Bota fora	m3	mín	med	máx	adotada	preço
			Servente	h	1.6000	2.1700	2.6000	2.1700	4.77	10.35
										Total:	10.35
					mín	med	máx
					0.0008	0.0009	0.0010
					0.0008	0.0009	0.0010
					mín	med	máx
					0.0212	0.0236	0.0283
					0.0212	0.0236	0.0283
					mín	med	máx
					10.0000	12.0000	14.0000
					12.0000	14.0000	16.0000
					mín	med	máx
					1.0300	1.0500	1.0700
					3.0000	4.0500	4.8600
					3.0000	4.0500	4.8600
					mín	med	máx
					1.0800	1.1500	1.2500
					0.0200	0.0200	0.0200
					0.0700	0.0900	0.1100
					0.0700	0.0900	0.1100
					mín	med	máx
					1.6000	2.1700	2.6000
					mín	med	máx
					209.0000	220.0000	242.0000
					0.6631	0.6980	0.7678
					0.8342	0.8780	0.9658
					3.0000	4.0500	4.8600
					4.0000	5.4000	6.4800
					mín	med	máx
					1.6000	2.1700	2.6000
					mín	med	máx
					1.0000	1.0500	1.1000
					3.5000	3.9000	4.1000
					0.9000	0.9800	1.0800
					0.1500	0.1600	0.1700
					0.1500	0.1700	0.2000
					1.3500	1.5000	1.5500
					1.3500	1.5000	1.5500
					mín	med	máx
					1.0800	1.1500	1.2500
					0.0200	0.0200	0.0200
					0.0700	0.0900	0.1100
					0.0700	0.0900	0.1100
					mín	med	máx
					3.0000	4.0500	4.8600
					3.0000	4.0500	4.8600
					1.0000	1.0500	1.1000
					mín	med	máx
					1.5000	2.0300	2.4300
					mín	med	máx
					1.6000	2.1700	2.6000
			VOCÊ TEM CERTEZA QUE DESEJA APAGAR TODOS
			OS QUANTITATIVOS DA LISTA?
			VOCÊ TEM CERTEZA QUE DESEJA APAGAR TODOS
			OS QUANTITATIVOS DO PROJETO?
SIM
NÃO
SIM
NÃO
APLICAR TAXA DE LEIS SOCIAIS
RESTAURAR OS ÍNDICES ORIGINAIS
SOMAR
Voltar para o menu inicial
DIM FIXAS CIRC ORC
	
		TUBULÃOOVAL - ENTRADA DE DADOS
					ENTRADA
		NÚMERO DE REPETIÇÕES			1.00
		DADOS DO FUSTE
		DIÂMETRO DO FUSTE d (cm)			80.00
		PERFURAÇÃO DO FUSTE Pf (m)			21.00
		DADOS DA BASE
		ALTURA DA BASE h (cm)			205.00
		ALTURA DO RODAPÉ dh (cm)			20.00
		DIAMETRO DA BASE D
		DADOS DO BLOCO
		COMPRIMENTO DO BLOCO X (cm)			100.00
		LARGURA DO BLOCO Y (cm)			100.00
		ALTURA DO BLOCO HB (cm)			95.00
		BITOLA UTILIZADA NO BLOCO (mm)			12.50
		CONSUMO MÉDIO DE ARMADURA NO BLOCO (kg / m3)			80.00
		Distância a1 (cm)			60.00
		Distância a2 (cm)			50.00
		Distância a3 (cm)			50.00
		Distância a4 (cm)			60.00
		Distância b1(cm)			60.00
		Distância b2 (cm)			50.00
		Distância b3 (cm)			50.00
		Distância b4 (cm)			60.00
		ARMADURA LONGITUDINAL
		BITOLA UTILIZADA (mm)			12.50
		QUANTIDADE DE FERROS			8
		COMPRIMENTO DO FERRO (cm)			200.00
		8 FERROS DIÂMETRO DE 12,5 mm - 200
		ARMADURA TRANVERSAL (ESTRIBOS)
		BITOLA UTILIZADA (mm)			5.00
		ESPAÇAMENTO (cm)			20.00
		COBRIMENTO (cm)			2.00
		COMPRIMENTO DO ESTRIBO (cm)			260.00
		QUANTIDADE DE ESTRIBOS (un) - 1 TUBULÃO			10.00
		10 FERROS DIÂMETRO DE 5 C/ 20 - 260
		DADOS COMPLEMENTARES
		ÂNGULO DA INCLINAÇÃO DO TALUDE BETA (GRAUS)			60.00
		ALTURA DO CONCRETO MACRO C (cm)			5.00
		ENTRADA NO BLOCO D (cm)			5.00
		Distância A (ARREDONDADA)		60.00	57.73
		Ângulo Beta adotado (graus)		60.00	DIST. A ORIG.
			Material + mão de obra
			Descrição	Unidade	Quantidade	PREÇO (R$)
						Unitário	Total	ARMADURA
		TUBULÃO	Perfuração do fuste	ml	21.00	73.50	1,543.49
			Alargamento da base	m3	-0.72	161.06	-116.03			Vol. Base = 0,31 m3
			Lançamento de concreto	m3	9.83	338.44	3,328.53
			Armadura longitudinal	kg	15.98	6.12	97.74	CA-50 DIAM. 12,5		8 BARRAS C = 200
			Armadura tranversal	kg	4.16	6.12	25.41	CA-60 DIAM. 5		10 BARRAS C = 260
		BLOCO	Escavação manual	m3	6.88	10.35	71.23
			Lançamento e adençamento de Concreto magro e= 5cm	m3	0.17	251.78	44.03
			Corte e preparo da cabeça do tubulão	Unid.	1.00	20.39	20.39
			Confecção, colocação e remoção de forma	m2	3.80	47.20	179.37
			Dobramento e colocação de armadura no bloco	kg	76.00	6.12	464.79	CA-50 DIAM. 12,5
			Lançamento e adençamento de concreto estrutural p/ blocos	m3	0.95	338.44	321.52
			Reaterro	m3	5.76	9.69	55.74
			Bota fora	m3	10.96	10.35	113.47
		Total material + mão de obra:					R$ 6,149.69
			MATERIAL
			Descrição	Unidade	Quantidade	PREÇO (R$)
						Unitário	Total
		Tub.	Concreto	m3	9.83	289.09	2,843.16
			Armadura longitudinal	kg	15.98	5.02	80.22
			Armadura tranversal	kg	4.16	5.02	20.86
		Bloco	Concreto magro	m3	0.17	202.43	35.40
			Concreto estrutural	m3	0.95	289.09	274.63
			Forma	m2	3.80	28.92	109.91
			Armadura	kg	76.00	5.02	381.44
		Total material					R$ 3,745.61	R$ 6,149.69
		Total mão de obra:					R$ 2,404.08
					A	10.24
					a	4.00
					desconta
		área da base m2)		0.00	conferecia MA
		área do fuste (m2)		0.50	Conferecia MO
		volume da base		0.31	repetições	1.00
					BLOCO	12.5
					LONG	5
					TRANV	12.5
			TUBULÃO		TUBULÃO		BLOCO
		tranv	2	long	5	long	5
		1	3.40	1	5.00	1	5
		2	5.00	2	6.00	2	6
		3	6.00	3	8.00	3	8
		4	6.30	4	10.00	4	10
		5	8.00	5	12.50	5	12.5
		6	10.00	6	16.00	6	16
		7	12.50	7	20.00	7	20
		8	16.00	8	25.00	8	25
		F	5.00	FUNÇÃO	12.5		12.5
			VOCÊ TEM CERTEZA QUE DESEJA APAGAR TODOS
			OS QUANTITATIVOS DA LISTA?
			VOCÊ TEM CERTEZA QUE DESEJA APAGAR TODOS
			OS QUANTITATIVOS DO PROJETO?
SOMAR T1 significa armazenar todos os quantitativos do tipo de dimensão 1 dos tubulões da obra em uma planilha separada para contabilização. Você Poderá indicar a quantidade de tubulões que existem com essas medidas no campo NÚMERO DE REPETIÇÕES.
SOMAR TN significa armazenar todos os quantitativos de um tipo de dimensão de índice N dos tubulões da obra em uma planilha separada(TOVAL para tubulões ovais e TOTAL para tubulões circulares para contabilização. Você Poderá indicar a quantidade de tubulões que existem com tais medidas no campo NÚMERO DE REPETIÇÕES.
LIMPAR TN significa limpar todos os quantitativos do tipo de dimensão de índice N dos tubulões da obra na planilha correspondente (TOVAL para tubulões ovais e TOTAL para tubulões circulares para contabilização.
Preencher o máximo de campos possíveis automaticamente o software sujere, de forma automática, alguma medidas complementares que servirão para o fechamento do orçamento como as dimensões do bloco de coroamento, a quantidade e o comprimento da ferragem de topo, etc.
SOMAR T1 significa armazenar todos os quantitativos do tipo de dimensão 1 dos tubulões da obra em uma planilha separada para contabilização. Você Poderá indicar a quantidade de tubulões que existem com essas medidas no campo NÚMERO DE REPETIÇÕES.
SOMAR T1 significa armazenar todos os quantitativos do tipo de dimensão 1 dos tubulões da obra em uma planilha separada para contabilização. Você Poderá indicar a quantidade de tubulões que existem com essas medidas no campo NÚMERO DE REPETIÇÕES.
SUGERIR VALORES
Limpar dados de entrada
Importar dados - planilha de cálculo
SIM
NÃO
SIM
NÃO
SOMAR T1
SOMAR
SOMAR T2
SOMAR
SOMAR T3
SOMAR
SOMAR T4
SOMAR
LIMPAR T1
SOMAR
LIMPAR T2
SOMAR
LIMPART3
SOMAR
LIMPAR T4
SOMAR T5
SOMAR
SOMAR T6
SOMAR
SOMAR T7
SOMAR
SOMAR T8
SOMAR
LIMPAR T5
SOMAR
LIMPAR T6
SOMAR
LIMPAR T7
SOMAR
LIMPAR T8
SOMAR
SOMAR T9
SOMAR
SOMAR T10
SOMAR
LIMPAR TODOS OS QUANTITATIVOS DA LISTA
LIMPAR 1
SOMAR
INICIAR PROJETO
SOMAR
DESCONTA VOLUME DA ENTRADA
LIMPAR T9
SOMAR
LIMPAR T10
SOMAR
INICIAR PROJETO
CIRC1
	
	TUBULÕES CIRCULARES				DADOS	TIPO 1		TIPO 2		TIPO 3		TIPO 4		TIPO 5		TIPO 6		TIPO 7		TIPO 8		TIPO 9		TIPO 10
				BLOCO	X (cm)	100.00	-		-		-		-		-		-		-		-		-		-
					Y (cm)	100.00	-		-		-		-		-		-		-		-		-		-
					HB (cm)	95.00	-		-		-		-		-		-		-		-		-		-
					ARMADURA	CA-50 DIAM. 12,5	-		-		-		-		-		-		-		-		-		-
				TUBULÃO	Fuste d (cm)	80.00	-		-		-		-		-		-		-		-		-		-
					Pf (m)	21.00	-		-		-		-		-		-		-		-		-		-
					h (cm)	205.00	-		-		-		-		-		-		-		-		-		-
					dh (cm)	20.00	-		-		-		-		-		-		-		-		-		-
					D (cm)		-		-		-		-		-		-		-		-		-		-
					ARM. LONG.	CA-50 DIAM. 12,5	8 BARRAS C = 200
					ARM.TRANV.	CA-60 DIAM. 5	10 BARRAS C = 260
					REPETIÇÕES	1.00
		MATERIAL + MÃO DE OBRA	UNIDADE			TOTAL	UNITÁRIO	TOTAL	UNITÁRIO	TOTAL	UNITÁRIO	TOTAL	UNITÁRIO	TOTAL	UNITÁRIO	TOTAL	UNITÁRIO	TOTAL	UNITÁRIO	TOTAL	UNITÁRIO	TOTAL	UNITÁRIO	TOTAL	UNITÁRIO
	TUBULÃO	Perfuração do fuste	m			21.00	21.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
		Alargamento da base	unid.			-0.72	-0.72		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
		Lançamento de concreto	m3			9.83	9.83		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
		Armadura longitudinal	kg			15.98	15.98		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
		Armadura tranversal	kg			4.16	4.16		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
	BLOCO	Escavação manual	m3			6.88	6.88		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
		Concreto magro	m2			0.17	0.17		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
		Corte e preparo da cabeça do tutulão	m3			1.00	1.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
		Confecção, colocação e remoção de forma	m2			3.80	3.80		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
		Dobramento e colocação de armadura	kg			76.00	76.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
		Lançamento e adensamento de concreto estrutural	m3			0.95	0.95		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
		Reaterro	m3			5.76	5.76		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
		Bota fora	m3			10.96	10.96		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
		MATERIAL	UNIDADE
	TUB.	Concreto	m3			9.83	9.83		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
		Armadura longitudinal	kg			15.98	15.98		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
		Armadura tranversal	kg			4.16	4.16		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
	BLOCO	Concreto magro	m3			0.17	0.17		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
		Concreto estrutural	m3			0.95	0.95		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
		Forma	m2			3.80	3.800.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
		Armadura	kg			76.00	76.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
	PREÇO UNITÁRIO DA PERFURAÇÃO (R$) - POR METRO					73.50
	PREÇO TOTAL DA PERFURAÇÃO (R$)					1,543.49	UNITÁRIO	0.00	UNITÁRIO	0.00	UNITÁRIO	0.00	UNITÁRIO	0.00	UNITÁRIO	0.00	UNITÁRIO	0.00	UNITÁRIO	0.00	UNITÁRIO	0.00	UNITÁRIO	0.00	UNITÁRIO
	PREÇO UNITÁRIO DO MATERIAL (R$)						3,745.61		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
	PREÇO TOTAL DO MATERIAL (R$)					3,745.61
	PREÇO UNITÁRIO DA MÃO DE OBRA (R$)						2,404.08		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
	PREÇO TOTAL DA MÃO DE OBRA (R$)					2,404.08
	PREÇO UNITÁRIO (MO+MAT) (R$)						6,149.69		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
	PREÇO TOTAL(MO+MAT) (R$)					6,149.69		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00		0.00
						TIPO 1		TIPO 2		TIPO 3		TIPO 4		TIPO 5		TIPO 6		TIPO 7		TIPO 8		TIPO 9		TIPO 10
		SOMA QUANTITATIVOS T1 A T10			PREÇO (R$)		QUADRO ORIGINAL DAS QUANTIDADES
		GERAL - BLOCOS RETANGULARES	UNIDADE	QUANT.	UNITÁRIO	TOTAL
	TUBULÃO	Perfuração do fuste	m	21.00	VAR	1,543.49
		Alargamento da base	m3	-0.72	161.06	-116.03
		Lançamento de concreto	m3	9.83	338.44	3,328.53
		Armadura longitudinal	kg	15.98	6.12	97.74
		Armadura tranversal	kg	4.16	6.12	25.41
	BLOCO	Escavação manual	m3	6.88	10.35	71.23
		Concreto magro	m2	0.17	251.78	44.03
		Corte e preparo da cabeça do tutulão	unid.	1.00	20.39	20.39
		Confecção, colocação e remoção de forma	m2	3.80	47.20	179.37
		Dobramento e colocação de armadura	kg	76.00	6.12	464.79
		Lançamento e adensamento de concreto estrutural p/ blocos	m3	0.95	338.44	321.52
		Reaterro	m3	5.76	9.69	55.74
		Bota fora	m3	10.96	10.35	113.47
		Total material + mão de obra				6,149.69
		Total material				3,745.61
		Total mão de obra				2,404.08
		TUBULÕES CIRCULARES			PREÇO (R$)		PRIMEIRA DEZENA COPIADA
		GERAL - BLOCOS RETANGULARES	UNIDADE	QUANT.	UNITÁRIO	TOTAL
	TUBULÃO	Perfuração do fuste	m	21.00	VAR	1,543.49
		Alargamento da base	m3	-0.72	161.06	-116.03
		Lançamento de concreto	m3	9.83	338.44	3,328.53
		Armadura longitudinal	kg	15.98	6.12	97.74
		Armadura tranversal	kg	4.16	6.12	25.41
	BLOCO	Escavação manual	m3	6.88	10.35	71.23
		Concreto magro	m2	0.17	251.78	44.03
		Corte e preparo da cabeça do tutulão	unid.	1.00	20.39	20.39
		Confecção, colocação e remoção de forma	m2	3.80	47.20	179.37
		Dobramento e colocação de armadura	kg	76.00	6.12	464.79
		Lançamento e adensamento de concreto estrutural	m3	0.95	338.44	321.52
		Reaterro	m3	5.76	9.69	55.74
		Bota fora	m3	10.96	10.35	113.47
		Total material + mão de obra				6,149.69
		Total material				3,745.61
		Total mão de obra				2,404.08
		TUBULÕES CIRCULARES			PREÇO (R$)		SEGUNDA DEZENA COPIADA
		GERAL - BLOCOS RETANGULARES	UNIDADE	QUANT.	UNITÁRIO	TOTAL
	TUBULÃO	Perfuração do fuste	m	21.00	VAR	1,543.49
		Alargamento da base	m3	-0.72	161.06	-116.03
		Lançamento de concreto	m3	9.83	338.44	3,328.53
		Armadura longitudinal	kg	15.98	6.12	97.74
		Armadura tranversal	kg	4.16	6.12	25.41
	BLOCO	Escavação manual	m3	6.88	10.35	71.23
		Concreto magro	m2	0.17	251.78	44.03
		Corte e preparo da cabeça do tutulão	unid.	1.00	20.39	20.39
		Confecção, colocação e remoção de forma	m2	3.80	47.20	179.37
		Dobramento e colocação de armadura	kg	76.00	6.12	464.79
		Lançamento e adensamento de concreto estrutural	m3	0.95	338.44	321.52
		Reaterro	m3	5.76	9.69	55.74
		Bota fora	m3	10.96	10.35	113.47
		Total material + mão de obra				6,149.69
		Total material				3,745.61
		Total mão de obra				2,404.08
		TUBULÕES CIRCULARES			PREÇO (R$)		TERCEIRA DEZENA COPIADA
		GERAL - BLOCOS RETANGULARES	UNIDADE	QUANT.	UNITÁRIO	TOTAL
	TUBULÃO	Perfuração do fuste	m	21.00	VAR	1,543.49
		Alargamento da base	m3	-0.72	161.06	-116.03
		Lançamento de concreto	m3	9.83	338.44	3,328.53
		Armadura longitudinal	kg	15.98	6.12	97.74
		Armadura tranversal	kg	4.16	6.12	25.41
	BLOCO	Escavação manual	m3	6.88	10.35	71.23
		Concreto magro	m2	0.17	251.78	44.03
		Corte e preparo da cabeça do tutulão	unid.	1.00	20.39	20.39
		Confecção, colocação e remoção de forma	m2	3.80	47.20	179.37
		Dobramento e colocação de armadura	kg	76.00	6.12	464.79
		Lançamento e adensamento de concreto estrutural	m3	0.95	338.44	321.52
		Reaterro	m3	5.76	9.69	55.74
		Bota fora	m3	10.96	10.35	113.47
		Total material + mão de obra				6,149.69
		Total material				3,745.61
		Total mão de obra				2,404.08
		TUBULÕES CIRCULARES			PREÇO (R$)		QUARTA DEZENA COPIADA
		GERAL - BLOCOS RETANGULARES	UNIDADE	QUANT.	UNITÁRIO	TOTAL
	TUBULÃO	Perfuração do fuste	m	21.00	VAR	1,543.49
		Alargamento da base	m3	-0.72	161.06	-116.03
		Lançamento de concreto	m3	9.83	338.44	3,328.53
		Armadura longitudinal	kg	15.98	6.12	97.74
		Armadura tranversal	kg	4.16	6.12	25.41
	BLOCO	Escavação manual	m3	6.88	10.35	71.23
		Concreto magro	m2	0.17	251.78	44.03
		Corte e preparo da cabeça do tutulão	unid.	1.00	20.39	20.39
		Confecção, colocação e remoção de forma	m2	3.80	47.20	179.37
		Dobramento e colocação de armadura	kg	76.00	6.12	464.79
		Lançamento e adensamento de concreto estrutural	m3	0.95	338.44	321.52
		Reaterro	m3	5.76	9.69	55.74
		Bota fora	m3	10.96	10.35	113.47
		Total material + mão de obra				6,149.69
		Total material				3,745.61
		Total mão de obra				2,404.08
		TUBULÕES CIRCULARES			PREÇO (R$)		DEZENA 5 AINDA NÃO UTILIZADA
		GERAL - BLOCOS RETANGULARES	UNIDADE	QUANT.	UNITÁRIO	TOTAL
	TUBULÃO	Perfuração do fuste	m
		Alargamento da base	m3
		Lançamento de concreto	m3
		Armadura longitudinal	kg
		Armadura tranversal	kg
	BLOCO	Escavação manual	m3
		Concreto magro	m2
		Corte e preparo da cabeça do tutulão	unid.
		Confecção, colocação e remoção de forma	m2
		Dobramento e colocação de armadura	kg
		Lançamento e adensamento de concreto estrutural	m3
		Reaterro	m3
		Bota fora	m3
		Total material + mão de obra
		Total material
		Total mão de obra
		0
		TUBULÕES OVAIS			PREÇO (R$)		RESULTADO FINAL - SOMA DAS 5 DEZENAS
		GERAL - BLOCOS RETANGULARES	UNIDADE	QUANT.	UNITÁRIO	TOTAL
	TUBULÃO	Perfuração do fuste	m	84.00	VAR	6,173.97
		Alargamento da base	m3	-2.88	161.06	-464.13
		Lançamento de concreto	m3	39.34	338.44	13,314.12
		Armadura longitudinal	kg	63.93	6.12	390.97
		Armadura tranversal	kg	16.62	6.12	101.65
	BLOCO	Escavação manual	m3	27.52	10.35	284.93
		Concreto magro	m2	0.70	251.78	176.11
		Corte e preparo da cabeça do tutulão	unid.	4.00	20.39	81.56
		Confecção, colocação e remoção de forma	m2	15.20	47.20	717.46
		Dobramento e colocação de armadura	kg	304.00	6.12	1,859.17
		Lançamento e adensamento de concreto estrutural	m3	3.80	338.44	1,286.06
		Reaterro	m3	23.02	9.69	222.97
		Bota fora	m3	43.84	10.35	453.89
		Total material + mão de obra				24,598.75
		Total material				14,982.44
		Total mão de obra				9,616.30
		TUBULÕES OVAIS			PREÇO (R$)
		QUANTITATIVOS GERAL	UNIDADE	QUANT.	UNITÁRIO	TOTAL
	TUBULÃO	Perfuração do fuste	m	160.00	VAR	10,471.00
		Alargamento da base	m3	79.37	91.39	7,253.96
		Lançamento de concreto	m3	205.03	159.37	32,676.60
		Armadura longitudinal	kg	599.34	2.15	1,290.95
		Armadura tranversal	kg	245.87	2.15	529.60
	BLOCO	Escavação manual	m3	249.68	6.32	1,577.74
		Concreto magro	m2	5.46	132.92	726.36
		Corte e preparo da cabeça do tutulão	unid.	20.00	8.75	174.99
		Confecção, colocação e remoção de forma	m2	110.40	24.54	2,709.11
		Dobramento e colocação de armadura	kg	2,649.60	2.15	5,707.13
		Lançamento e adensamento de concreto estrutural	m3	33.12	177.22	5,869.63
		Reaterro	m3	211.10	5.91	1,247.86
		Bota fora	m3	243.62	6.32	1,539.42
		Total material + mão de obra				R$ 71,774.35
		Total material				R$ 39,324.06
		Total mão de obra				R$ 32,450.29
		LUCRO (%)				10.00
		ADMNISTRAÇÃO (%)				12.00
		CUSTOS FINANCEIROS (%)				6.00
						CUSTO FINAL
		Total material + mão de obra				R$ 93,731.56
		total material				R$ 51,354.08
		Total mão de obra				R$ 42,377.48
		BDI MÉDIO				30.59%
		DIFERENÇA BRUTA				R$ 21,957.21
COPIAR DEZENA DE NÚMERO 1
SOMAR
COPIAR DEZENA DE NÚMERO 2
SOMAR
COPIAR DEZENA DE NÚMERO 3
SOMAR
COPIAR DEZENA DE NÚMERO 4
SOMAR
COPIAR DEZENA DE NÚMERO 5
APAGAR DEZENA DE NÚMERO 1
SOMAR
APAGARDEZENA DE NÚMERO 2
SOMAR
APAGAR DEZENA DE NÚMERO 3
SOMAR
APAGAR DEZENA DE NÚMERO 4
SOMAR
APAGAR DEZENA DE NÚMERO 5
Adequar alteração do unitário do fuste
Restaurar
FAZER UMA CÓPIA PARA IMPRESSÃO COM APLICAÇÃO DE BDI
APAGAR TODAS AS DEZENAS
SOMAR
Restaurar todas as quantidades e preços originais do BD
Restaurar
Restaurar
Restaurar
Restaurar
Restaurar
Restaurar
Restaurar
Restaurar
Restaurar
Restaurar
Restaurar
Restaurar
FERRO CIRC
	
			RESUMO DOS FERROS TABELA ORIGINAL	AÇO	TIPO 1	TIPO 2	TIPO 3	TIPO 4	TIPO 5	TIPO 6	TIPO 7	TIPO 8	TIPO 9	TIPO 10		AÇO		RESULTADO DAS ARMADURAS DO QUADRO ORIGINAL DE QUANTIDADES
				BLOCO												BLOCO		3.40	5.00	6.00	6.30	8.00	10.00	12.50	16.00	20.00	25.00
				CA-50											SOMA 1	CA-50		0.00	4.16	0.00	0.00	0.00	0.00	91.98	0.00	0.00	0.00
				8.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	8.0
				10.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	10.0		RESULTADO DAS ARMADURAS DA PRIMEIRA DEZENA
				12.5	76.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	76.00	12.5		3.40	5.00	6.00	6.30	8.00	10.00	12.50	16.00	20.00	25.00
				16.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	16.0		0.00	4.16	0.00	0.00	0.00	0.00	91.98	0.00	0.00	0.00
				20.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	20.0
				25.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	25.0		RESULTADO DAS ARMADURAS DA SEGUNDA DEZENA
				CA-60											0.00	CA-60		3.40	5.00	6.00	6.30	8.00	10.00	12.50	16.00	20.00	25.00
				5.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	5.0		0.00	4.16	0.00	0.00	0.00	0.00	91.98	0.00	0.00	0.00
				6.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	6.0
				ARM. LONGIT.											0.00	ARM. LONGIT.		RESULTADO DAS ARMADURAS DA TERCEIRA DEZENA
				CA-50											0.00	CA-50		3.40	5.00	6.00	6.30	8.00	10.00	12.50	16.00	20.00	25.00
				8.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	8.0		0.00	4.16	0.00	0.00	0.00	0.00	91.98	0.00	0.00	0.00
				10.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	10.0
				12.5	15.98	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	15.98	12.5		RESULTADO DAS ARMADURAS DA QUARTA DEZENA
				16.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	16.0		3.40	5.00	6.00	6.30	8.00	10.00	12.50	16.00	20.00	25.00
				20.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	20.0		0.00	4.16	0.00	0.00	0.00	0.00	91.98	0.00	0.00	0.00
				25.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	25.0
				CA-60											0.00	CA-60		RESULTADO DAS ARMADURAS DA QUINTA DEZENA
				5.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	5.0		3.40	5.00	6.00	6.30	8.00	10.00	12.50	16.00	20.00	25.00
				6.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	6.0
				ARM. TRANSV.											0.00	ARM. TRANSV.
				CA-50											0.00	CA-50		RESULTADO FINAL AÇO	3.40	0.00	0.00	CA - 60
				6.3	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	6.3			5.00	16.62	kg
				8.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	8.0			6.00	0.00	0.00
				10.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	10.0			6.30	0.00	0.00	CA - 50
				12.5	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	12.5			8.00	0.00	0.00
				16.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	16.0			10.00	0.00	0.00
				CA-60											0.00	CA-60			12.50	367.93	kg
				3.4	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	3.4			16.00	0.00	0.00
				5.0	4.16	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	4.16	5.0			20.00	0.00	0.00
				6.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	6.0			25.00	0.00	0.00
																		CA-50+10 %		405.00
																		CA-60+10 %		19.00
OVAL NÃO FIXAS
	
		ENTRADA DE DADOS DE TUBULÕES OVAIS DE DIVISA - CÁLCULO
		DADOS		ENTRADA	dh adotar (cm)
		fck (kgf/cm2)		200.00	10
		Taxa do terreno sigma s (kg/cm2)		3.00	ATENÇÃO !
		Carga Q1 (tf) - TUBULÃO OVAL DE DIVISA		50.00	Volume calculado com dh = 20 cm!
		gama f (NB51/78 =1,4)		1.40	valor da norma NB51/78 ok!
		gama c (NB51/78 =1,6)		1.60	valor da norma NB51/78 ok!
		Lado do pilar paralelo à viga alavanca b0 (cm)		40.00
		Braço de alavanca y (dist. eixo-eixo entre pilares) [cm]		500.00
		Valor de n (a = nb) a < 2,5b		2.00
		Perfuração do fuste Pf (m)		21.00	Volume total será calculado
		Carga Q2 (tf) - TUBULÃO CIRCULAR		10.00
		Valor limite para altura da base - h lim (cm)		200.00
		Número de conjuntos (1 conjunto = 1 apoio)		1.00
					*** RESULTADOS ***
		NÚMERO DE TUBULÕES NECESSÁRIOS PARA 1 CONJUNTO COM h lim = 200 cm			1.00
		TAXA DO TERRENO NECESSÁRIA PARA USAR SÓ 1 TUBULÃO COM h lim 200 cm (kg/cm2)			1.59
		CARGA MÁXIMA PARA H=200 CM (Tf)			94.07
		TUBULÃO COM H < 200 cm OK!			0.00%
		Diâmetro do fuste d (cm)	29.87	adotar	60.00
		Área para b (cm2)	16,666.67		16,666.67		2
		Diâmetro do setor circular b (cm)	96.62	adotar	100.00		1
		R1 (ton) - reação no tubulão	53.19		54.00
		Área para cálculo x (cm2)	17,730.50		17,730.50
		X (cm)	98.77	adotar	100.00
		Altura da base h (cm)	121.24	h <= 200 - ok!	125.00
		Comprimento da base oval a (cm)	200.00	adotar	200.00
		a/b (cm)	2.07	a/b < 2,5 - ok!
		Ângulo alfa (rad/graus)	1.06	60.75	0.00
		Excentricidade (cm)	30.00
		Alívio (tf)	3.19
		Alívio/2 (tf)	1.60		1.60
		Reação no tubulão central (tf) - [Q2-(alívio/2)]	8.40		8.40
		Área da base - RAIO MÉDIO (m2)	1.77		1.77
		Área do fuste (m2)	0.28		0.28
		Volume da base (m3)	1.85		1.85
		Volume alargamento base (m3)	1.50		1.50
		Volume total (m3)	7.44		7.44
		0.00	0.00		0.00
		0.00	0.00		0.00
		0.00	0.00		0.00
		0.00	0.00		0.00
		0	0.00		0.00
		0	0.00		0.00
		0.00	0.00%		0.00%
		0
					CALCULO TUBUL. NECESS.	1.00
		1	CP 100	4	CARGA ATUANTE	50.00
		2	CP 135		CARGA MAXIMA	94.07
		3	CP 150		CARGA AT/CARGA MAX	0.53
		4	CP 200		SEGURANÇA	88.14%
		5	CP 250
		6	CP 300		TAXA CALCULADA	1.59
		7	CP 400		TAXA ORIGINAL	3.00
		8	CP 500		PRODUTO	1.00
					fuste alterado
					vinculo do fuste
				0	338.44	0
Caro usuário,
O coeficiente de segurança gama f recomendado pela Norma é 1,4 ... Se ligue !!!
Caro usuário,
O coeficiente de segurança gama c recomendado pela Norma é 1,6 ... Se ligue !!!
Braço de alavanca é a distância eixo a eixo entre pilares que serão ligados por viga alavanca.
O valor de n é um parâmetro que relaciona os valores do comprimento da base oval (a) e do diâmetro do setor circular (b) para cálculo da base do tubulão. Usualmente, adota-se n = 2. Ou seja, a = 2b.
VOLTAR PARA MENU INICIAL
LIMPAR DADOS DE ENTRADA
PREENCHER COM DADOS EXEMPLO
RECALCULAR OS PARÂMETROS ABAIXO
REPRODUZIR COM CARGA MÁXIMA
Recalcula fuste quando h > h lim
Alternar fuste
DIM FIXAS OVAL ORC2
	
		TUBULÃO OVAL - ENTRADA DE DADDOS
					ENTRADA
		NÚMERO DE CONJUNTOS (APOIOS)			1.00
		NÚMERO DE TUBULÕES NECESSÁRIOS P/ 1 CONJ.			1.00
		NÚMERO TOTAL DE TUBULÕES			1.00
		DADOS DO FUSTE
		DIÂMETRO DO FUSTE d (cm)			60.00
		PERFURAÇÃO DO FUSTE Pf (m)			21.00
		DADOS DA BASE
		ALTURA DA BASE h (cm)			100.00
		ALTURA DO RODAPÉ dh (cm)			20.00
		COMPRIMENTO DA BASE OVAL a (x + b) - (cm)			175.00
		BASE RETA x - (cm)			90.00
		DIÂMETRO b (cm)			85.00
		DADOS DO BLOCO
		COMPRIMENTO DO BLOCO X (cm)			80.00
		LARGURA DO BLOCO Y (cm)			80.00
		ALTURA DO BLOCO HB (cm)			75.00
		BITOLA UTILIZADA NO BLOCO (mm)			10.00
		CONSUMO MÉDIO DE ARMADURA NO BLOCO (kg / m3)			80.00
		Distância a1 (cm)			50.00
		Distância a2 (cm)			50.00
		Distância a3 (cm)			50.00
		Distância a4 (cm)			50.00
		Distância b1(cm)			50.00
		Distância b2 (cm)			50.00
		Distância b3 (cm)			50.00
		Distância b4 (cm)			50.00
		ARMADURA LONGITUDINAL
		BITOLA UTILIZADA (mm)			12.50
		QUANTIDADE DE FERROS			6.00
		COMPRIMENTO DO FERRO (cm)			200.00
		6 FERROS DIÂMETRO DE 12,5 mm - 200
		ARMADURA TRANVERSAL (ESTRIBOS)
		BITOLA UTILIZADA (mm)			6.30
		ESPAÇAMENTO (cm)			20.00
		COBRIMENTO (cm)			2.00
		COMPRIMENTO DO ESTRIBO (cm) - 1 TUBULÃO			197.00
		QUANTIDADE DE ESTRIBOS (un) - 1 TUBULÃO			10.00
		10 FERROS DIÂMETRO DE 6,3 C/ 20 - 197
		DADOS COMPLEMENTARES
		ÂNGULO DA INCLINAÇÃO DO TALUDE BETA (GRAUS)			60.00
		ALTURA DO CONCRETO MACRO C (cm)			5.00
		ENTRADANO BLOCO D (cm)			5.00
		Distância A (ARREDONDADA)		50.00	46.19
		Ângulo Beta adotado (graus)		60.00	DIST. A ORIG.
			Material + mão de obra
			Descrição	Unidade	Quantidade	PREÇO (R$)
						Unitário	Total	ARMADURA
		TUBULÃO	Perfuração do fuste	ml	21.00	41.34	868.21
			Alargamento da base	m3	0.92	161.06	147.73			Vol. Base = 1,2 m3
			Lançamento de concreto	m3	6.85	338.44	2,319.89
			Armadura longitudinal	kg	12.00	6.12	73.39	CA-50 DIAM. 12,5		6 BARRAS C = 200
			Armadura tranversal	kg	5.00	6.12	30.58	CA-60 DIAM. 6,3		10 BARRAS C = 197
		BLOCO	Escavação manual	m3	4.30	10.35	44.51
			Lançamento e adençamento de Concreto magro e= 5cm	m3	0.15	251.78	37.23
			Corte e preparo da cabeça do tubulão	Unid.	1.00	20.39	20.39
			Confecção, colocação e remoção de forma	m2	2.40	47.20	113.28
			Dobramento e colocação de armadura no bloco	kg	38.40	6.12	234.84	CA-50 DIAM. 10
			Lançamento e adençamento de concreto estrutural p/ blocos	m3	0.47	338.44	157.67
			Reaterro	m3	3.67	9.69	35.55
			Bota fora	m3	7.48	10.35	77.47
		Total material + mão de obra:					R$ 4,160.74
			MATERIAL
			Descrição	Unidade	Quantidade	PREÇO (R$)
						Unitário	Total
		Tub.	Concreto	m3	6.85	289.09	1,981.60
			Armadura longitudinal	kg	12.00	5.02	60.23
			Armadura tranversal	kg	5.00	5.02	25.10
		Bloco	Concreto magro	m3	0.15	202.43	29.93
			Concreto estrutural	m3	0.47	289.09	134.67
			Forma	m2	2.40	28.92	69.42
			Armadura	kg	38.40	5.02	192.73
		Total material					R$ 2,493.67	R$ 4,160.74
		Total mão de obra:					R$ 1,667.07
		Perfuração do fuste (m)	21.00		A	7.84
		Alargamento da base	0.92		a	3.24
		volume da base (m3)	1.20		desconta
		área da base m2)	1.33		conferecia MA
		área do fuste (m2)	0.28		Conferecia MO
		Concretagem do tubulão	6.85		repetições	1.00
		Ferragem do topo (kg)	18,554.48		BLOCO	10
		volume do fuste (m3)	5.94		LONG	6.3
		volume total	6.85		TRANV	12.5
		Escacação do bloco	4.30
			TUBULÃO		TUBULÃO		BLOCO
		tranv	4	long	5	long	4
		1	3.40	1	5.00	1	5
		2	5.00	2	6.00	2	6
		3	6.00	3	8.00	3	8
		4	6.30	4	10.00	4	10
		5	8.00	5	12.50	5	12.5
		6	10.00	6	16.00	6	16
		7	12.50	7	20.00	7	20
		8	16.00	8	25.00	8	25
			VOCÊ TEM CERTEZA QUE DESEJA APAGAR TODOS
			OS QUANTITATIVOS DA LISTA?
			VOCÊ TEM CERTEZA QUE DESEJA APAGAR TODOS
			OS QUANTITATIVOS DO PROJETO?
SOMAR T1 significa armazenar todos os quantitativos do tipo de dimensão 1 dos tubulões da obra em uma planilha separada para contabilização. Você Poderá indicar a quantidade de tubulões que existem com essas medidas no campo NÚMERO DE REPETIÇÕES.
SOMAR TN significa armazenar todos os quantitativos de um tipo de dimensão de índice N dos tubulões da obra em uma planilha separada(TOVAL para tubulões ovais e TOTAL para tubulões circulares para contabilização. Você Poderá indicar a quantidade de tubulões que existem com tais medidas no campo NÚMERO DE REPETIÇÕES.
LIMPAR TN significa limpar todos os quantitativos do tipo de dimensão de índice N dos tubulões da obra na planilha correspondente (TOVAL para tubulões ovais e TOTAL para tubulões circulares para contabilização.
Preencher o máximo de campos possíveis automaticamente o software sujere, de forma automática, alguma medidas complementares que servirão para o fechamento do orçamento como as dimensões do bloco de coroamento, a quantidade e o comprimento da ferragem de topo, etc.
SOMAR T1 significa armazenar todos os quantitativos do tipo de dimensão 1 dos tubulões da obra em uma planilha separada para contabilização. Você Poderá indicar a quantidade de tubulões que existem com essas medidas no campo NÚMERO DE REPETIÇÕES.
SOMAR T1 significa armazenar todos os quantitativos do tipo de dimensão 1 dos tubulões da obra em uma planilha separada para contabilização. Você Poderá indicar a quantidade de tubulões que existem com essas medidas no campo NÚMERO DE REPETIÇÕES.
sugerir valores
Limpar dados de entrada
Importar dados - planilha de cálculo
SIM
NÃO
SIM
NÃO
SOMAR T1
SOMAR
SOMAR T2
SOMAR
SOMAR T3
SOMAR
SOMAR T4
SOMAR
LIMPAR T1
SOMAR
LIMPAR T2
SOMAR
LIMPART3
SOMAR
LIMPAR T4
SOMAR T5
SOMAR
SOMAR T6
SOMAR
SOMAR T7
SOMAR
SOMAR T8
SOMAR
LIMPAR T5
SOMAR
LIMPAR T6
SOMAR
LIMPAR T7
SOMAR
LIMPAR T8
SOMAR
SOMAR T9
SOMAR
SOMAR T10
SOMAR
LIMPAR TODOS OS QUANTITATIVOS DA LISTA
LIMPAR 1
SOMAR
INICIAR PROJETO
SOMAR
DESCONTA VOLUME DA ENTRADA
LIMPAR T9
SOMAR
LIMPAR T10
SOMAR
INICIAR PROJETO
TOVAL1
	
	TUBULÕES OVAIS				DADOS	TIPO 1		TIPO 2		TIPO 3		TIPO 4		TIPO 5		TIPO 6		TIPO 7		TIPO 8		TIPO 9		TIPO 10
				BLOCO	X (cm)	100.00	-	100.00	-	100.00	-	90.00	-	90.00	-		-		-		-		-		-
					Y (cm)	100.00	-	100.00	-	100.00	-	90.00	-	90.00	-		-		-		-		-		-
					HB (cm)	95.00	-	95.00	-	95.00	-	85.00	-	85.00	-		-		-		-		-		-
					ARMADURA	CA-50 DIAM. 10	-	CA-50 DIAM. 10	-	CA-50 DIAM. 10	-	CA-50 DIAM. 10		CA-50 DIAM. 10
				TUBULÃO	Fuste d (cm)	80.00	-	80.00	-	80.00	-	70.00	-	70.00	-		-		-		-		-		-
					Pf (m)	21.00	-	21.00	-	21.00	-	21.00	-	21.00	-		-		-		-		-		-
					h (cm)	205.00	-	205.00	-	205.00	-	70.00	-	100.00	-		-		-		-		-		-
					dh (cm)	20.00	-	20.00	-	20.00	-	20.00	-	20.00	-		-		-		-		-		-
					a (cm)	335.00	-	350.00	-	330.00	-	140.00	-	170.00	-	0.00	-	0.00	-	0.00	-	0.00	-	0.00	-
					x (cm)	150.00	-	135.00	-	145.00	-	60.00	-	90.00	-		-		-		-		-		-
					b (cm)	185.00	-	215.00	-	185.00	-	80.00	-	80.00	-		-		-		-		-		-
					ARM. LONG.	CA-50 DIAM. 12,5	8 BARRAS C = 200	CA-50 DIAM. 12,5	8 BARRAS C = 200	CA-50 DIAM. 12,5	8 BARRAS C = 200	CA-50 DIAM. 12,5	7 BARRAS C = 200	CA-50 DIAM. 12,5	7 BARRAS C = 200
					ARM.TRANV.	CA-60 DIAM. 6,3	10 BARRAS C = 260	CA-60 DIAM. 6,3	10 BARRAS C = 260	CA-60 DIAM. 6,3	10 BARRAS C = 260	CA-60 DIAM. 6,3	10 BARRAS C = 228	CA-60 DIAM. 6,3	10 BARRAS C = 228
					NUM. CONJUNTOS	1.00		1.00		1.00		1.00		1.00
					NUM. TUB. 1 CONJ.	1.00		1.00		1.00		1.00		1.00
					TOTAL TUBULÕES	1.00		1.00		1.00		1.00		1.00		0.00		0.00		0.00		0.00		0.00
		MATERIAL + MÃO DE OBRA	UNIDADE			TOTAL	UNITÁRIO	TOTAL	UNITÁRIO	TOTAL	UNITÁRIO	TOTAL	UNITÁRIO	TOTAL	UNITÁRIO	TOTAL	UNITÁRIO	TOTAL	UNITÁRIO	TOTAL	UNITÁRIO	TOTAL	UNITÁRIO	TOTAL	UNITÁRIO
	TUBULÃO	Perfuração do fuste	m			21.00	21.00	21.00	21.00	21.00	21.00	21.00	21.00	21.00	21.00		0.00		0.00		0.00		0.00		0.00
		Alargamento da base	unid.			7.37	7.37	8.77	8.77	7.27	7.27	0.53	0.53	0.82	0.82		0.00		0.00		0.00		0.00		0.00
		Lançamento de concreto	m3			17.93	17.93	19.33	19.33	17.83	17.83	8.61	8.61	8.90	8.90		0.00		0.00		0.00		0.00		0.00
		Armadura longitudinal	kg			16.00	16.00	16.00	16.00	16.00	16.00	14.00	14.00	14.00	14.00		0.00		0.00		0.00		0.00		0.00
		Armadura tranversal	kg			7.00	7.00	7.00	7.00	7.00	7.00	6.00	6.00	6.00	6.00		0.00		0.00		0.00		0.00		0.00
	BLOCO	Escavação manual	m3			6.88	6.88	6.88	6.88	6.88	6.88	5.49	5.49	5.49	5.49		0.00		0.00		0.00		0.00		0.00
		Concreto magro	m2			0.17	0.17	0.17	0.17	0.17	0.17	0.16	0.16	0.16	0.16		0.00		0.00		0.00		0.00		0.00
		Corte e preparo da cabeça do tutulão	m3			1.00	1.00	1.00	1.00	1.00	1.00	1.00	1.00	1.00	1.00		0.00		0.00		0.00		0.00		0.00
		Confecção, colocação e remoção de forma	m2			3.80	3.80	3.80	3.80	3.80	3.80	3.06	3.06	3.06	3.06		0.00		0.00		0.00		0.00		0.00
		Dobramento e colocação de armadura	kg			76.00	76.00	76.00	76.00	76.00	76.00	55.08	55.08	55.08	55.08		0.00		0.00		0.00		0.00		0.00
		Lançamento e adensamento de concreto estrutural	m3			0.92	0.92	0.92	0.92	0.92	0.92	0.67	0.67	0.67	0.67		0.00		0.00		0.00		0.00		0.00
		Reaterro	m3			5.76	5.76	5.76	5.76	5.76	5.76	4.64	4.64	4.64	4.64		0.00		0.00		0.00		0.00		0.00
		Bota fora	m3			19.05	19.05	20.45	20.45	18.95	18.95	9.46	9.46	9.75	9.75		0.00		0.00		0.00		0.00		0.00
		MATERIAL	UNIDADE
	TUB.	Concreto	m3			17.93	17.93	19.33	19.33	17.83	17.83	8.61	8.61	8.90	8.90		0.00		0.00		0.00		0.00		0.00
		Armadura longitudinal	kg			16.00	16.00	16.00	16.00	16.00	16.00	14.00	14.00	14.00	14.00		0.00		0.00		0.00		0.00		0.00
		Armadura tranversal	kg			7.00	7.00	7.00	7.00	7.00	7.00	6.00	6.00	6.00	6.00		0.00		0.00		0.00		0.00		0.00
	BLOCO	Concreto magro	m3			0.17	0.17	0.17	0.17	0.17	0.17	0.16	0.16	0.16	0.16		0.00		0.00		0.00		0.00		0.00
		Concreto estrutural	m3			0.92	0.92	0.92	0.92	0.92	0.92	0.67	0.67	0.67	0.67		0.00		0.00		0.000.00		0.00
		Forma	m2			3.80	3.80	3.80	3.80	3.80	3.80	3.06	3.06	3.06	3.06		0.00		0.00		0.00		0.00		0.00
		Armadura	kg			76.00	76.00	76.00	76.00	76.00	76.00	55.08	55.08	55.08	55.08		0.00		0.00		0.00		0.00		0.00
	PREÇO UNITÁRIO DA PERFURAÇÃO (R$) - POR METRO					73.50		73.50		73.50		56.27		56.27
	PREÇO TOTAL DA PERFURAÇÃO (R$)					1,543.49	1 CONJUNTO	1,543.49	1 CONJUNTO	1,543.49	1 CONJUNTO	1,181.74	1 CONJUNTO	1,181.74	1 CONJUNTO	0.00	1 CONJUNTO	0.00	1 CONJUNTO	0.00	1 CONJUNTO	0.00	1 CONJUNTO	0.00	1 CONJUNTO
	PREÇO UNITÁRIO DO MATERIAL (R$)						6,091.43		6,496.15		6,062.52		3,181.09		3,263.35		0.00		0.00		0.00		0.00		0.00
	PREÇO TOTAL DO MATERIAL (R$)					6,091.43		6,496.15		6,062.52		3,181.09		3,263.35
	PREÇO UNITÁRIO DA MÃO DE OBRA (R$)						4,191.94		4,501.01		4,169.86		2,091.68		2,154.49		0.00		0.00		0.00		0.00		0.00
	PREÇO TOTAL DA MÃO DE OBRA (R$)					4,191.94		4,501.01		4,169.86		2,091.68		2,154.49
	PREÇO UNITÁRIO (MO+MAT) (R$)						10,283.37		10,997.15		10,232.38		5,272.77		5,417.84		0.00		0.00		0.00		0.00		0.00
	PREÇO TOTAL(MO+MAT) (R$)					10,283.37		10,997.15		10,232.38		5,272.77		5,417.84		0.00		0.00		0.00		0.00		0.00
						TIPO 1		TIPO 2		TIPO 3		TIPO 4		TIPO 5		TIPO 6		TIPO 7		TIPO 8		TIPO 9		TIPO 10
	PREÇO MÉDIO MATERIAL - 1 TUBULÃO					6,091.43		6,496.15		6,062.52		3,181.09		3,263.35		0.00		0.00		0.00		0.00		0.00
	PREÇO MÉDIO MÃO DE OBRA - 1 TUBULÃO					4,191.94		4,501.01		4,169.86		2,091.68		2,154.49		0.00		0.00		0.00		0.00		0.00
	PREÇO MÉDIO MATERIAL + MÃO DE OBRA - 1 TUBULÃO					10,283.37		10,997.15		10,232.38		5,272.77		5,417.84		0.00		0.00		0.00		0.00		0.00
		SOMA QUANTITATIVOS T1 A T10			PREÇO (R$)		QUADRO ORIGINAL DAS QUANTIDADES
		GERAL - BLOCOS RETANGULARES	UNIDADE	QUANT.	UNITÁRIO	TOTAL
	TUBULÃO	Perfuração do fuste	m	105.00	VAR	6,993.95
		Alargamento da base	m3	24.75	161.06	3,986.87
		Lançamento de concreto	m3	72.58	338.44	24,565.12
		Armadura longitudinal	kg	76.00	6.12	464.79
		Armadura tranversal	kg	33.00	6.12	201.82
	BLOCO	Escavação manual	m3	31.63	10.35	327.44
		Concreto magro	m2	0.85	251.78	213.29
		Corte e preparo da cabeça do tutulão	unid.	5.00	20.39	101.95
		Confecção, colocação e remoção de forma	m2	17.52	47.20	826.97
		Dobramento e colocação de armadura	kg	338.16	6.12	2,068.09
		Lançamento e adensamento de concreto estrutural	m3	4.11	338.44	1,392.04
		Reaterro	m3	26.55	9.69	257.17
		Bota fora	m3	77.66	10.35	804.03
		Total material + mão de obra				42,203.52
		Total material				25,094.54
		Total mão de obra				17,108.98
		TUBULÕES OVAIS			PREÇO (R$)		PRIMEIRA DEZENA COPIADA
		GERAL - BLOCOS RETANGULARES	UNIDADE	QUANT.	UNITÁRIO	TOTAL
	TUBULÃO	Perfuração do fuste	m	105.00	VAR	6,993.95
		Alargamento da base	m3	24.75	161.06	3,986.87
		Lançamento de concreto	m3	72.58	338.44	24,565.12
		Armadura longitudinal	kg	76.00	6.12	464.79
		Armadura tranversal	kg	33.00	6.12	201.82
	BLOCO	Escavação manual	m3	31.63	10.35	327.44
		Concreto magro	m2	0.85	251.78	213.29
		Corte e preparo da cabeça do tutulão	unid.	5.00	20.39	101.95
		Confecção, colocação e remoção de forma	m2	17.52	47.20	826.97
		Dobramento e colocação de armadura	kg	338.16	6.12	2,068.09
		Lançamento e adensamento de concreto estrutural	m3	4.11	338.44	1,392.04
		Reaterro	m3	26.55	9.69	257.17
		Bota fora	m3	77.66	10.35	804.03
		Total material + mão de obra				42,203.52
		Total material				25,094.54
		Total mão de obra				17,108.98
		TUBULÕES OVAIS			PREÇO (R$)		DEZENA 2 AINDA NÃO UTILIZADA
		GERAL - BLOCOS RETANGULARES	UNIDADE	QUANT.	UNITÁRIO	TOTAL
	TUBULÃO	Perfuração do fuste	m
		Alargamento da base	m3
		Lançamento de concreto	m3
		Armadura longitudinal	kg
		Armadura tranversal	kg
	BLOCO	Escavação manual	m3
		Concreto magro	m2
		Corte e preparo da cabeça do tutulão	unid.
		Confecção, colocação e remoção de forma	m2
		Dobramento e colocação de armadura	kg
		Lançamento e adensamento de concreto estrutural	m3
		Reaterro	m3
		Bota fora	m3
		Total material + mão de obra
		Total material
		Total mão de obra
		TUBULÕES OVAIS			PREÇO (R$)		DEZENA 3 AINDA NÃO UTILIZADA
		GERAL - BLOCOS RETANGULARES	UNIDADE	QUANT.	UNITÁRIO	TOTAL
	TUBULÃO	Perfuração do fuste	m
		Alargamento da base	m3
		Lançamento de concreto	m3
		Armadura longitudinal	kg
		Armadura tranversal	kg
	BLOCO	Escavação manual	m3
		Concreto magro	m2
		Corte e preparo da cabeça do tutulão	unid.
		Confecção, colocação e remoção de forma	m2
		Dobramento e colocação de armadura	kg
		Lançamento e adensamento de concreto estrutural	m3
		Reaterro	m3
		Bota fora	m3
		Total material + mão de obra
		Total material
		Total mão de obra
		TUBULÕES OVAIS			PREÇO (R$)		DEZENA 4 AINDA NÃO UTILIZADA
		GERAL - BLOCOS RETANGULARES	UNIDADE	QUANT.	UNITÁRIO	TOTAL
	TUBULÃO	Perfuração do fuste	m
		Alargamento da base	m3
		Lançamento de concreto	m3
		Armadura longitudinal	kg
		Armadura tranversal	kg
	BLOCO	Escavação manual	m3
		Concreto magro	m2
		Corte e preparo da cabeça do tutulão	unid.
		Confecção, colocação e remoção de forma	m2
		Dobramento e colocação de armadura	kg
		Lançamento e adensamento de concreto estrutural	m3
		Reaterro	m3
		Bota fora	m3
		Total material + mão de obra
		Total material
		Total mão de obra
		TUBULÕES OVAIS			PREÇO (R$)		DEZENA 5 AINDA NÃO UTILIZADA
		GERAL - BLOCOS RETANGULARES	UNIDADE	QUANT.	UNITÁRIO	TOTAL
	TUBULÃO	Perfuração do fuste	m
		Alargamento da base	m3
		Lançamento de concreto	m3
		Armadura longitudinal	kg
		Armadura tranversal	kg
	BLOCO	Escavação manual	m3
		Concreto magro	m2
		Corte e preparo da cabeça do tutulão	unid.
		Confecção, colocação e remoção de forma	m2
		Dobramento e colocação de armadura	kg
		Lançamento e adensamento de concreto estrutural	m3
		Reaterro	m3
		Bota fora	m3
		Total material + mão de obra
		Total material
		Total mão de obra
		0
		TUBULÕES OVAIS			PREÇO (R$)		RESULTADO FINAL - SOMA DAS 5 DEZENAS
		GERAL - BLOCOS RETANGULARES	UNIDADE	QUANT.	UNITÁRIO	TOTAL
	TUBULÃO	Perfuração do fuste	m	105.00	^VAR	6,993.95
		Alargamento da base	m3	24.75	161.06	3,986.87
		Lançamento de concreto	m3	72.58	338.44	24,565.12
		Armadura longitudinal	kg	76.00	6.12	464.79
		Armadura tranversal	kg	33.00	6.12	201.82
	BLOCO	Escavação manual	m3	31.63	10.35	327.44
		Concreto magro	m2	0.85	251.78	213.29
		Corte e preparo da cabeça do tutulão	unid.	5.00	20.39	101.95
		Confecção, colocação e remoção de forma	m2	17.52	47.20	826.97
		Dobramento e colocação de armadura	kg	338.16	6.12	2,068.09
		Lançamento e adensamento de concreto estrutural	m3	4.11	338.44	1,392.04
		Reaterro	m3	26.55	9.69	257.17
		Bota fora	m3	77.66	10.35	804.03
		Total material + mão de obra				R$ 42,203.52
		Total material				R$ 25,094.54
		Total mão de obra				R$ 17,108.98
		TUBULÕES OVAIS			PREÇO (R$)
		QUANTITATIVOS GERAL	UNIDADE	QUANT.	UNITÁRIO	TOTAL
	TUBULÃO	Perfuração do fuste	m	8.00	VAR	577.21
		Alargamento da base	m3	21.71	91.39	1,984.37
		Lançamento de concreto	m3	28.64	159.37	4,564.41
		Armadura longitudinal	kg	15.00	2.15	32.31
		Armadura tranversal	kg	18.00	2.15	38.77
	BLOCO	Escavação manual	m3	11.48	6.32	72.57
		Concreto magro	m2	0.21	132.92	27.89
		Corte e preparo da cabeça do tutulão	unid.	1.00	11.09	11.09
		Confecção, colocação e remoção de forma	m2	6.00	24.54	147.23
		Dobramento e colocação de armadura	kg	150.00	2.15	323.09
		Lançamento e adensamento de concreto estrutural	m3	1.83	177.22	324.62
		Reaterro	m3	9.40	5.91	55.56
		Bota fora	m3	30.72	6.32	194.15
		Total material + mão de obra				R$ 8,353.28
		Total material				R$ 4,418.61
		Total mão de obra				R$ 3,934.67
		LUCRO (%)				10.00
		ADMNISTRAÇÃO (%)				12.00
		CUSTOS FINANCEIROS (%)				6.00
		CUSTO FINAL
		Total material + mão de obra				R$ 10,908.72
		Total material				R$ 5,770.35
		Total mão de obra				R$ 5,138.37
		BDI MÉDIO				30.59%
		DIFERENÇA BRUTA				R$ 2,555.44
COPIAR DEZENA DE NÚMERO 1
SOMAR
COPIAR DEZENA DE NÚMERO 2
SOMAR
COPIAR DEZENA DE NÚMERO 3
SOMAR
COPIAR DEZENA DE NÚMERO 4
SOMAR
COPIAR DEZENA DE NÚMERO 5
APAGAR DEZENA DE NÚMERO 1
SOMAR
APAGAR DEZENA DE NÚMERO 2
SOMAR
APAGAR DEZENA DE NÚMERO 3
SOMAR
APAGAR DEZENA DE NÚMERO 4
SOMAR
APAGAR DEZENA DE NÚMERO 5
Adequar alteração do unitário do fuste
RestaurarFAZER UMA CÓPIA PARA IMPRESSÃO COM APLICAÇÃO DE BDI
APAGAR TODAS AS DEZENAS
SOMAR
Restaurar
Restaurar
Restaurar
Restaurar
Restaurar
Restaurar
Restaurar
Restaurar
Restaurar
Restaurar
Restaurar
Restaurar
Restaurar todas as quantidades e preços originais do BD
FERRO1
	
			RESUMO DOS FERROS TABELA ORIGINAL	AÇO	TIPO 1	TIPO 2	TIPO 3	TIPO 4	TIPO 5	TIPO 6	TIPO 7	TIPO 8	TIPO 9	TIPO 10		AÇO		RESULTADO DAS ARMADURAS DO QUADRO ORIGINAL DE QUANTIDADES
				BLOCO												BLOCO		3.40	5.00	6.00	6.30	8.00	10.00	12.50	16.00	20.00	25.00
				CA-50											SOMA 1	CA-50		0.00	0.00	0.00	33.00	0.00	338.16	76.00	0.00	0.00	0.00
				8.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	8.0
				10.0	76.00	76.00	76.00	55.08	55.08	0.00	0.00	0.00	0.00	0.00	338.16	10.0		RESULTADO DAS ARMADURAS DA PRIMEIRA DEZENA
				12.5	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	12.5		3.40	5.00	6.00	6.30	8.00	10.00	12.50	16.00	20.00	25.00
				16.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	16.0		0.00	0.00	0.00	33.00	0.00	338.16	76.00	0.00	0.00	0.00
				20.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	20.0
				25.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	25.0		RESULTADO DAS ARMADURAS DA SEGUNDA DEZENA
				CA-60											0.00	CA-60		3.40	5.00	6.00	6.30	8.00	10.00	12.50	16.00	20.00	25.00
				5.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	5.0
				6.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	6.0
				ARM. LONGIT.											0.00	ARM. LONGIT.		RESULTADO DAS ARMADURAS DA TERCEIRA DEZENA
				CA-50											0.00	CA-50		3.40	5.00	6.00	6.30	8.00	10.00	12.50	16.00	20.00	25.00
				8.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	8.0
				10.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	10.0
				12.5	16.00	16.00	16.00	14.00	14.00	0.00	0.00	0.00	0.00	0.00	76.00	12.5		RESULTADO DAS ARMADURAS DA QUARTA DEZENA
				16.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	16.0		3.40	5.00	6.00	6.30	8.00	10.00	12.50	16.00	20.00	25.00
				20.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	20.0
				25.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	25.0
				CA-60											0.00	CA-60		RESULTADO DAS ARMADURAS DA QUINTA DEZENA
				5.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	5.0		3.40	5.00	6.00	6.30	8.00	10.00	12.50	16.00	20.00	25.00
				6.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	6.0
				ARM. TRANSV.											0.00	ARM. TRANSV.
				CA-50											0.00	CA-50		RESULTADO FINAL AÇO	3.40	0.00	0.00	CA - 60
				6.3	7.00	7.00	7.00	6.00	6.00	0.00	0.00	0.00	0.00	0.00	33.00	6.3			5.00	0.00	0.00
				8.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	8.0			6.00	0.00	0.00
				10.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	10.0			6.30	33.00	kg	CA - 50
				12.5	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	12.5			8.00	0.00	0.00
				16.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	16.0			10.00	338.16	kg
				CA-60											0.00	CA-60			12.50	76.00	kg
				3.4	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	3.4			16.00	0.00	0.00
				5.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	5.0			20.00	0.00	0.00
				6.0	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	0.00	6.0			25.00	0.00	0.00
																		CA-50+10 %		492.00
																		CA-60+10 %		0.00
TOT
	
		TUBULÃO	PLANILHA DE CUSTO	UNIDADE	QUANTIDADE	UNITÁRIO	TOTAL	RESUMO DE AÇO	3.40	0.00	0.00	CA - 60
			Perfuração do fuste	m	189.00	VAR	13,167.92		5.00	16.62	kg
			Alargamento da base	m3	21.87	161.06	3,522.74		6.00	0.00	0.00
			Lançamento de concreto	m3	111.92	338.44	37,879.25		6.30	33.00	kg	CA - 50
			Armadura longitudinal	kg	139.93	6.12	855.77		8.00	0.00	0.00
			Armadura tranversal	kg	49.62	6.12	303.47		10.00	338.16	kg
		BLOCO	Escavação manual	m3	59.15	10.35	612.37		12.50	443.93	kg
			Lançamento e adençamento de concreto magro	m2	1.55	251.78	389.40		16.00	0.00	0.00
			Corte e preparo da cabeça do tubulão	unidade	9.00	20.39	183.51		20.00	0.00	0.00
			Confecção, colocação e remoção de forma	m2	32.72	47.20	1,544.43		25.00	0.00	0.00
			Dobramento e colocação de armadura no bloco	kg	642.16	6.12	3,927.26	CA-50+10 %		897.00
			Lançamento e adençamento de concreto estrutural	m3	7.91	338.44	2,678.10	CA-60+10 %		19.00
			Reaterro	m3	49.57	9.69	480.14	LUCRO (%)		0.00
			Bota fora	m3	121.50	10.35	1,257.92	ADMINISTRAÇÃO (%)		0.00
			TOTAL MÃO DE OBRA + MATERIAL				R$ 66,802.27	CUSTOS FINANCEIROS (%)		0.00
			TOTAL MATERIAL				R$ 40,076.98	BDI MÉDIO (%)		0.00%
			TOTAL MÃO DE OBRA				R$ 26,725.28
			Total mão de obra + material				R$ 66,802.27	Custo
			Total material				R$ 40,076.98
			Total mão de obra				R$ 26,725.28
			LUCRO BRUTO				R$ 0.00
INICIAR PROJETO
Arquivo MID
Arquivo MID
MBD0005505D.unknown
MBD000FD51E.unknown
MBD000B6942.unknown
MBD000E72BB/imagine[1].mid
Soft Karaoke@KMIDI KARAOKE FILE@V0100@I05-24-94, 08:00, L.R.
Words@LENGL@TIMAGINE@TJohn Lennon\Imagine there's no heaven/It's easy if you try/No hell below us\Above us only sky/Imagine all the people/Living for today\Imagine there's no countries/It isn't hard to do/Nothing to kill or die for\And no religion too/Imagine all the people/Living life in peace\Oooh Oooh you may say I'm a dreamer/But I'm not the only one\I hope someday you'll join us/And the world will be as one\Imagine no possessions/I wonder if you can/No need for greed or hunger\A brotherhood of man/Imagine all the people/Sharing all the world\Ooh Ooh you may say I'm a dreamer/But I'm not the only one\I hope someday you'll join us/And the world will be as one
Melody
Grand PianoReset Volume�������������������ÿ��Reset Pitch Wheel�â�@��@��@��@��@��@��@��@��@��@��@��@��@��@��@��@�ÿ��Reset Modulation Wheel�²�����������Reset Aftertouch
Drums
String Ensemble
Bass Guitar
MBD00011358.unknown
MBD0001F8AA.unknown

Continue navegando