Baixe o app para aproveitar ainda mais
Prévia do material em texto
NMLJIHGF E D C B A CHECKDESIGN No. APPROV.EXEC. TITLE: SHEETSCALE DATE JOB: AREA: CLIENT: DESCRIPTIONREV. DATE EXEC. CHECK APPROV. INFORMATION IN THIS DOCUMENT IS PROPERTY OF PETROBRAS, BEING PROHIBITED OUTSIDE OF THEIR PURPOSE. FORM OWNED TO PETROBRAS N-381 REV. L. 841mm X 594mm A1 DRAWING GENERAL NOTES REFERENCE DOCUMENTS 1 THESE VALVES SHALL BE LOCATED AS NEAR AS POSSIBLE TO SUPPLY/ RETURN HEADERS. 3 LOW TEMPERATURE HOT WATER SUPPLY HEADER TEMPERATURE = 120°C. 4 HIGH TEMPERATURE HOT WATER SUPPLY HEADER TEMPERATURE = 170°C. 2 FURTHER DETAILS SEE I-ET-3010.1M-1200-940-P4X-002 - CORROSION MONITORING SYSTEM. 6 A PROPER DISTANCE BETWEEN TIT-5125001 AND THE MISTURE POINT SHALL BE CONSIDERED IN ORDER TO PROVIDE A HOMOGENEOUS MISTURE MEASURING AND A STABLE TEMPERATURE CONTROL LOOPING.. 5 AS THE SIGNAL FROM THIS TEMPERATURE TRANSMITTER RISES, IT CLOSES THE VALVE TV-5125001-2 AND OPENS THE VALVE TV-5125001-1 SIMULTANEOUSLY AND IN THE SAME PROPORTION, IN ORDER TO ENSURE A TEMPERATURE OF 120°C IN STREAM GOING TO P-1223002A/B. SRGE ESUPNP-1 NO SCALE KES PETROBRAS 78 (P-78) PIPING AND INSTRUMENT DIAGRAM HOT WATER DISTRIBUTION NETWORK 03/06/2019 12:00:00 AM 01 of 01- E & P I-DE-3010.2G-5125-944-KES-007 BUZIOS FIELD AREA DEVELOPMENT SPPID/V2014/I-DE-3010.2G-5125-944-KES-007_0.pid M15B M13 M12 M15 M11 M10 M07 M03 M01 M17 M16 M14 M05 M05B M06 M06B M08 M16B M04 M02 M09
Compartilhar