Buscar

BASE MODULOS

Prévia do material em texto

NMLJIHGF
E
D
C
B
A
CHECKDESIGN
No.
APPROV.EXEC.
TITLE:
SHEETSCALE
DATE
JOB:
AREA:
CLIENT:
DESCRIPTIONREV. DATE EXEC. CHECK APPROV.
INFORMATION IN THIS DOCUMENT IS PROPERTY OF PETROBRAS, BEING PROHIBITED OUTSIDE OF
THEIR PURPOSE.
FORM OWNED TO PETROBRAS N-381 REV. L.
841mm X 594mm
A1
DRAWING
GENERAL NOTES
REFERENCE DOCUMENTS
1 THESE VALVES SHALL BE LOCATED AS NEAR AS POSSIBLE TO SUPPLY/ RETURN
HEADERS.
3 LOW TEMPERATURE HOT WATER SUPPLY HEADER TEMPERATURE = 120°C.
4 HIGH TEMPERATURE HOT WATER SUPPLY HEADER TEMPERATURE = 170°C.
2 FURTHER DETAILS SEE I-ET-3010.1M-1200-940-P4X-002 - CORROSION MONITORING
SYSTEM.
6 A PROPER DISTANCE BETWEEN TIT-5125001 AND THE MISTURE POINT SHALL BE
CONSIDERED IN ORDER TO PROVIDE A HOMOGENEOUS MISTURE MEASURING AND A
STABLE TEMPERATURE CONTROL LOOPING..
5 AS THE SIGNAL FROM THIS TEMPERATURE TRANSMITTER RISES, IT CLOSES THE
VALVE TV-5125001-2 AND OPENS THE VALVE TV-5125001-1 SIMULTANEOUSLY AND IN
THE SAME PROPORTION, IN ORDER TO ENSURE A TEMPERATURE OF 120°C IN STREAM
GOING TO P-1223002A/B.
SRGE
ESUPNP-1
NO SCALE
KES
PETROBRAS 78 (P-78)
PIPING AND INSTRUMENT DIAGRAM
HOT WATER DISTRIBUTION NETWORK
03/06/2019
12:00:00 AM
01 of 01-
E & P
I-DE-3010.2G-5125-944-KES-007
BUZIOS FIELD AREA DEVELOPMENT
SPPID/V2014/I-DE-3010.2G-5125-944-KES-007_0.pid
M15B M13 M12 M15 M11 M10 M07 M03 M01
M17 M16 M14 M05 M05B M06 M06B M08 M16B M04 M02
M09

Continue navegando