According to NR-10, what are the steps to be followed for re-energization of an electrical installation? a) Removal of tools, utensils, and equipm...

According to NR-10, what are the steps to be followed for re-energization of an electrical installation?

a) Removal of tools, utensils, and equipment;
b) Removal of all workers not involved in the re-energization process from the controlled area;
c) Removal of temporary grounding, equipotentialization, and additional protections;
d) Removal of the re-energization impediment signaling;
e) Unlocking, if any, and reconnection of the switching devices.
a) a, b, c, d, e
b) b, a, c, d, e
c) c, b, a, d, e
d) d, e, c, b, a

Essa pergunta também está no material:

NR-10 Segurança em Instalações e Serviços de Eletricidade
18 pág.

💡 1 Resposta

User badge image

Ed Verified user icon

De acordo com a NR-10, as etapas a serem seguidas para a reenergização de uma instalação elétrica são: a) Remoção de ferramentas, utensílios e equipamentos; b) Remoção de todos os trabalhadores não envolvidos no processo de reenergização da área controlada; c) Remoção do aterramento temporário, equipotencialização e proteções adicionais; d) Remoção da sinalização de impedimento de reenergização; e) Destravamento, se houver, e religação dos dispositivos de manobra. A alternativa correta é a letra "b) b, a, c, d, e".

0
Dislike0

Faça como milhares de estudantes: teste grátis o Passei Direto

Esse e outros conteúdos desbloqueados

16 milhões de materiais de várias disciplinas

Impressão de materiais

Agora você pode testar o

Passei Direto grátis

Você também pode ser Premium ajudando estudantes

✏️ Responder

SetasNegritoItálicoSublinhadoTachadoCitaçãoCódigoLista numeradaLista com marcadoresSubscritoSobrescritoDiminuir recuoAumentar recuoCor da fonteCor de fundoAlinhamentoLimparInserir linkImagemFórmula

Para escrever sua resposta aqui, entre ou crie uma conta

User badge image

Outros materiais