What are the measures of control suggested in the 'Planilha de análise preliminar de riscos (APR)' to prevent the risk of 'falling'? Training of e...

What are the measures of control suggested in the 'Planilha de análise preliminar de riscos (APR)' to prevent the risk of 'falling'?

Training of employees according to NR-35 (Work at height); Use of the correct PPE for this service.
Use of PPEs for working at height, such as safety belts attached to a safe place, helmet with jugular, and suede gloves.
Dimensioning and constructing scaffolds to safely support workloads.

Essa pergunta também está no material:

Atividade 3 UC 3 CURSO SENAC TST
2 pág.

Segurança do Trabalho Universidade do ContestadoUniversidade do Contestado

💡 1 Resposta

User badge image

Ed Verified user icon

As medidas de controle sugeridas na Planilha de Análise Preliminar de Riscos (APR) para prevenir o risco de "queda" são: treinamento dos funcionários de acordo com a NR-35 (Trabalho em Altura); uso do EPI correto para este serviço; uso de EPIs para trabalho em altura, como cintos de segurança presos a um local seguro, capacete com jugular e luvas de camurça; dimensionamento e construção de andaimes para suportar com segurança as cargas de trabalho.

0
Dislike0

✏️ Responder

SetasNegritoItálicoSublinhadoTachadoCitaçãoCódigoLista numeradaLista com marcadoresSubscritoSobrescritoDiminuir recuoAumentar recuoCor da fonteCor de fundoAlinhamentoLimparInserir linkImagemFórmula

Para escrever sua resposta aqui, entre ou crie uma conta

User badge image

Outros materiais