Prévia do material em texto
SPE 107261 Production Optimization With Intelligent Wells Alexandre Anozé Emerick, SPE, and Ricardo Cunha Mattos Portella, SPE, Petrobras S.A. Copyright 2007, Society of Petroleum Engineers This paper was prepared for presentation at the 2007 SPE Latin American and Caribbean Petroleum Engineering Conference held in Buenos Aires, Argentina, 15–18 April 2007. This paper was selected for presentation by an SPE Program Committee following review of information contained in an abstract submitted by the author(s). Contents of the paper, as presented, have not been reviewed by the Society of Petroleum Engineers and are subject to correction by the author(s). The material, as presented, does not necessarily reflect any position of the Society of Petroleum Engineers, its officers, or members. Papers presented at SPE meetings are subject to publication review by Editorial Committees of the Society of Petroleum Engineers. Electronic reproduction, distribution, or storage of any part of this paper for commercial purposes without the written consent of the Society of Petroleum Engineers is prohibited. Permission to reproduce in print is restricted to an abstract of not more than 300 words; illustrations may not be copied. The abstract must contain conspicuous acknowledgment of where and by whom the paper was presented. Write Librarian, SPE, P.O. Box 833836, Richardson, Texas 75083-3836 U.S.A., fax 01-972-952-9435. Abstract This paper describes an implementation of method to optimize the production in intelligent wells varying the wells inflow control valves settings using an optimization algorithm coupled to commercial flow simulators. The optimization is based on direct search methods. The optimization algorithm was coupled with two different commercial flow simulators and has been applied in two real Brazilian offshore fields to quantify the benefits of intelligent wells over a base case with conventional completion. The first field has three horizontal wells, two producers and one water injector, completed in two zones totalizing six inflow control devices. In this case, different scenarios have been analyzed varying the downhole valves type – on-off and multi-position. The results have shown that the intelligent wells scenarios increased the recovery factor and reduced the production and injection of water when compared with the base case (conventional completion). The second field has fifteen wells – nine producers with binary valves and six water injectors with six- position valves – producing and injecting in two or three zone totalizing 39 downhole valves to be optimized. In this case, the results have shown a significant increase of the expected cumulative oil production when compared with the base case. Introduction The intelligent well technology provides the capability to remotely monitor and manage multiple production zones independently, reducing the cost of wells interventions, accelerating the production and reducing the injection and production of water. The ability to control multiple production zones comes from downhole inflow control valves. These devices may be binary (on-off behavior), or multi-position, choking the production zone with a discrete number of positions, or infinity variable position. The benefits of the intelligent wells technology were shown in practical applications1-6 especially for multiple-zone producing commingled. During the operation with intelligent wells, one possible approach is to react when problems occur, for instance, choke the production zones with high water cut. Yeten et al.7 has called this approach as reactive control strategy. Another approach is to use the intelligent completions in conjunction with a predictive reservoir model. This model may be coupled with optimization algorithms to define production strategies that maximize the value of the field. Some previous authors have studied the production optimization with intelligent wells. Brouwer et al.8, have presented a methodology that maximized sweep in a water flood study. The strategy was based on choking the segments with highest productivity index and redistributing the production in others segments. Brouwer et al.9, have applied the optimal control theory for production optimization. Yeten et al.7 have used a conjugate gradient optimization method coupled with a reservoir simulator to optimize the production with intelligent wells. They have proposed to divide the simulation into several steps of optimization. Ajayi et al.10 have applied an optimization process based on derivatives calculated as the change of the production rate of undesired reservoir fluid, water or gas, with the correspondent change in the desired fluid, oil or gas. The process corresponds to choke the zone with highest derivatives values in each time step. Naus et al.11 have proposed an optimization strategy with infinitely variable inflow control valves using a sequential linear programming to maximize production at a specific moment in time. This paper presents an implementation of method to optimize the production in intelligent wells varying the wells inflow control valves settings using an optimization algorithm coupled to commercial flow simulators. The optimization is based on direct search methods. This kind of algorithm has some advantages in this case: the algorithm is based only in objective functions evaluations, this fact allows to consider the flow simulator as an external program like a “black box”; the algorithm permits to model binary and multi-position downhole valves, differently of gradient-based algorithms where is difficult to model problems with a finite number of discrete solutions; and the algorithm takes advantage in a grid computer environment, because the objective function evaluations can easily be done in parallel. The optimization algorithm was applied in two real Brazilian offshore fields to quantify the benefit of intelligent wells case over a base case with conventional completion. The first field has three horizontal wells, two producers and one water injector, completed in two producer zones totalizing six inflow control devices. In this case, some different scenarios D ow nloaded from http://onepetro.org/SPELAC P/proceedings-pdf/07LAC PEC /07LAC PEC /SPE-107261-M S/3665015/spe-107261-m s.pdf by U niversidade Federal D e Pelotas user on 16 D ecem ber 2024 2 SPE 107261 have been analyzed varying the downhole valves type – binary and multi-position. The second field has fifteen wells – nine producers with binary valves and six water injectors with six- position valves – producing and injecting in two or three zone totalizing 39 downhole valves to be optimized. Methodology The optimization procedure uses direct search methods. These methods divide the space of solutions into a discrete space, for two or three dimensions the method can be understand as to divide the space of solutions into a grid and search for the optimum walking in the grid nodes. Kolda et al.12 have shown a detailed description of the direct search methods. The algorithm procedure basically consists of an “exploratory search” in the neighborhood of the initial point, varying each parameter separately, the objective of the exploratory search is to find the direction with highest decrease (or increase for maximizations problems) of the objective function (OF). After that, the algorithm follows this direction until the OF stops to decrease (or increase), at this point, another exploratory search is performed. The procedure stops when there is no direction where the OF decreases. Figure 1 shows this optimization procedure. This algorithm was proposed in 1961 by Hooke and Jeeves13. The algorithm has some advantages in the proposed problem: first, this kind of algorithm is very easy to implement; second, it is based only in objective functions evaluations, this factallows to consider the flow simulator as an external program like a “black box”. Another advantage is that the algorithm permits to model binary and multi-position downhole valves, differently of gradient-based algorithms where is difficult to model problems with a finite number of discrete solutions. Finally, the algorithm takes advantage in a grid computer environment, because the objective function evaluations, that is, the simulation runs, can easily be done in parallel. In this project we have done extensive use of this advantage, the algorithm has been coupled with a program developed in previous work14 that distributes the simulations in a grid computer environment (Figure 2). This program to distribute the simulations in the network is based on client- server architecture developed with CORBA15 objects. CORBA is the acronym for Common Object Request Broker Architecture, this is a standard defined by the Object Management Group (OMG) that enables software components written in multiple computer languages and running on multiple computers to interoperate. Figure 1: Optimization procedure. Figure 2: Client-server architecture based on CORBA to distribute the simulation runs in the network. D ow nloaded from http://onepetro.org/SPELAC P/proceedings-pdf/07LAC PEC /07LAC PEC /SPE-107261-M S/3665015/spe-107261-m s.pdf by U niversidade Federal D e Pelotas user on 16 D ecem ber 2024 SPE 107261 3 In the optimization process, we used the original idea proposed by Yeten et al.7 to divide the simulation period into steps, for each step we perform an optimization to define the valves setting. This procedure can be summarized as following: 1. Divide the simulation period into n steps (these steps are distinct to the simulation time steps). 2. For each step perform the optimization to define the valves settings. 3. Restart the simulation from the end of the previous step. 4. Go back to the items 2 and 3 until the entire simulation period is covered. Figure 3 shows the optimization process. In this figure each color represents an optimized valve setting for the specific period and each circle represents a restart point that is the start of a new optimization process. Figure 3: Optimization process of the valve setting during time proposed by Yeten et al. The optimization algorithm was coupled with two different commercial flow simulators16,17. For each flow simulator we have defined a different approach to model the downhole valves. The first simulator has a multi-segment well option18 that enables to model sub-critical valves imposing an additional pressure drop (∆pv) in well segments. This pressure drop is given by 22 v 2 u2 v 2 uv AC2 qC C2 vCp ρ=ρ=∆ , (1) where Cu is a unit conversion factor, ρ is the fluid density, Cv is the dimensionless valve coefficient, v is the fluid velocity. The fluid velocity can be expressed in terms of the ratio between the fluid flow rate (q) and the area of constriction (A). The current version of second flow simulator does not have a specific option to model downhole valves, in this case, we have decided to use the follow approach: (a) define a different well for each intelligent completion; (b) for the injector wells, optimize the water injection rate; (c) for production wells, open or close the well, in this case we have considered only binary valves. Applications Field 1: Deepwater offshore field The first application was in a deepwater Brazilian field located in Campos Basin. In this field there is a project to implement an intelligent system in the south block of the field (Figure 4). This south block is hydraulic isolated to the rest of the field. The main aim of this study was to quantify the benefit of intelligent wells over a conventional completion development scenario. Figure 4: Full field flow simulator Field 1. Time step Pass # Block with the intelligent field project (south block) Restart points The south block will be developed with five wells, three producers and two water injectors, completed in two producer zones. The original project includes to complete two producers, P1 and P2 (Figure 5), with intelligent well system. Beyond these two producers we have analyzed to include one injector, I1, in the intelligent field project. Horizontal permeability Figure 5: South block flow simulator indicating the intelligent and conventional wells – Field 1. P1 (INTELLIGENT) P3 (CONVENTIONAL)2000 mD 4000 mD PRODUCER INJECTOR I1 (INTELLIGENT/ CONVENTIONAL) P2 (INTELLIGENT) I2 (CONVENTIONAL) D ow nloaded from http://onepetro.org/SPELAC P/proceedings-pdf/07LAC PEC /07LAC PEC /SPE-107261-M S/3665015/spe-107261-m s.pdf by U niversidade Federal D e Pelotas user on 16 D ecem ber 2024 4 SPE 107261 In this study, some different scenarios were analyzed varying the downhole valves type: binary, six-position and ten-position valves. Considering the valve type and the inclusion of the injector well (I1) in the intelligent field project, we have defined nine different cases: CASE 1: producers wells (P1 and P2) with binary valves. CASE 2: injector well (I1) with binary valves. CASE 3: producers wells (P1 and P2) and injector well (I1) with binary valves. CASE 4: producers wells (P1 and P2) with six position valves. CASE 5: injector well (I1) with six-position valves. CASE 6: producers wells (P1 and P2) and injector well (I1) six-position valves. CASE 7: producers wells (P1 and P2) with ten-position valves. CASE 8: injector well (I1) with ten-position valves. CASE 9: producers wells (P1 and P2) and injector well (I1) ten-position valves. Figure 6 shows the fraction of the cross area opened to flux as a function of the valve position considering de six and ten- position valves. Figure 6: Fraction of the constriction area opened to flux for the multi-position valves. The optimizations were done considering, in a first moment, to maximize the cumulative oil production of the south block (Np), and in a second moment to maximize the net present value (NPV) of the project. The period of production optimization was 35 years with the update of the valve settings in the beginning of each year. Figures 7, 8 and 9 show the results of the optimizations considering the cumulative oil production as objective function. Table 1 summarizes the results. Notice that all values have been divided by a constant factor. The following considerations can be made with these results: All the cases with intelligent well have presented significant increase (varying between 7.2 and 12.8%) in the final cumulative oil production over the base case. In the base case all wells were closed due to high water production (water cut higher than 95%). It has observed that all the cases with intelligent wells have increased the production period of the block, arriving in several of them up to 2050. The cases 1, 4 and 7 (only production wells with downhole valves) have presented very close results in terms of oil production (about 9% of increase over the base case). The case 7 got the fastest production of the block. The cases 6 and 9 (valves with 6 and 10 positions) have presented the same results in terms of oil and water production and water injection. These cases got the highest increase in the cumulative oil production (12.8% over the base case). However, these cases got the slowest production of the block. This fact is not interesting in terms of financial performance for the project. Figure 7: Scaled cumulative oil production – objective function Np. Figure 8: Scaled cumulative water production (Wp) – objective function Np. D ow nloaded from http://onepetro.org/SPELAC P/proceedings-pdf/07LAC PEC /07LAC PEC /SPE-107261-M S/3665015/spe-107261-m s.pdf by U niversidade FederalD e Pelotas user on 16 D ecem ber 2024 SPE 107261 5 Figure 9: Scaled cumulative water injection (Wi) – objective function Np. CASE Np Wp Wi BASE 0.83 1.92 2.97 1 0.90 2.28 3.43 2 0.89 2.00 3.07 3 0.91 2.16 3.30 4 0.91 2.31 3.46 5 0.90 2.32 3.41 6 0.94 1.76 2.95 7 0.91 2.23 3.38 8 0.89 2.65 3.79 9 0.94 1.70 2.92 Table 1: Results of the optimizations – objective function Np. Figures 10, 11 and 12 show the same results considering only the cases 7 and 9 (fastest production and highest cumulative oil production). Figure 10: Scaled cumulative oil production – objective function Np. Figure 11: Scaled cumulative water production (Wp) – objective function Np. Figure 12: Scaled cumulative water injection (Wi) – objective function Np. Beyond the cumulative oil production, the optimizations were done considering de NPV as objective function. Table 2 and Figures 13, 14 e 15 show the results. In these optimizations the cases 4, 5 and 6 (six-position valves) were not performed. In this study, the NPV has considered the oil price, the costs of water production and injection and the costs of some equipments for the intelligent completions (valves, packers, flat-pack, Hydraulic Power Unit). CASE Increase of the NPV over the base case 1 2.76% 2 0.32% 3 2.82% 7 2.75% 8 0.76% 9 3.03% Table 2: Results of the optimizations – objective function NPV. D ow nloaded from http://onepetro.org/SPELAC P/proceedings-pdf/07LAC PEC /07LAC PEC /SPE-107261-M S/3665015/spe-107261-m s.pdf by U niversidade Federal D e Pelotas user on 16 D ecem ber 2024 6 SPE 107261 Figure 13: Scaled cumulative oil production – objective function NPV. Figure 14: Scaled cumulative water production (Wp) – objective function NPV. Figure 15: Scaled cumulative water injection (Wi) – objective function NPV. The following considerations can be made with these results: The case 9 have presented the highest increase in the NPV (3%) and in the cumulative oil production (12.8%). The cases 1 and 7 (binary and multi-position valve in the producer wells) have presented very close results in term of production and NPV. Field 2: Brownfield offshore The second application of the optimization procedure was in a brownfield offshore located in Potiguar Basin. This study aims to quantify the benefits of installing intelligent completions in a new waterflood project. Figure 16 shows the flow simulator model of the Field 2. After some initial studies, we have chosen fifteen wells – nine producers with binary valves and six water injectors with six-position valves – for the intelligent field project (Figure 17). The chosen wells have been recompleted in two or three producer zones, and for each zone, have been introduced a downhole valve totalizing 39 valves. The period of production, 2008 to 2040, has been divided into 33 steps, one update of the valve setting in the beginning of each year. The goal was to maximize the cumulative oil production of the field (Np). Figure 16: Flow simulator model – Field 2. D ow nloaded from http://onepetro.org/SPELAC P/proceedings-pdf/07LAC PEC /07LAC PEC /SPE-107261-M S/3665015/spe-107261-m s.pdf by U niversidade Federal D e Pelotas user on 16 D ecem ber 2024 SPE 107261 7 Figure 17: Intelligent well locations – Field 2. Figures 18 to 23 show the results in terms of the oil and water production for the field. Beyond the base case and the optimized case (intelligent wells), we have defined a “recompleted case”. This case corresponds to recomplete the wells in the same zones of the intelligent case, but without downhole valves, therefore, each well would producer all zones commingled. Table 3 shows the results in terms of oil cumulative production. CASE Np (2008) Np (2050) ∆Np Increase over the base case Increase over the recompleted case Base 0.584 0.96 0.376 − − Recompleted 0.584 0.97 0.386 2.7% − Intelligent 0.584 1.00 0.416 10.6% 7.8% Table 3: Results of cumulative oil production. Figure 18: Scaled cumulative oil production. Figure 19: Scaled oil production rate. Figure 20: Scaled cumulative water production. Figure 21: Scaled water production rate. D ow nloaded from http://onepetro.org/SPELAC P/proceedings-pdf/07LAC PEC /07LAC PEC /SPE-107261-M S/3665015/spe-107261-m s.pdf by U niversidade Federal D e Pelotas user on 16 D ecem ber 2024 8 SPE 107261 Figure 22: Scaled cumulative water production. Figure 23: Scaled cumulative water injection. The results showed a significant increase in the cumulative oil production with intelligent wells over the base case (10.6% of increase), and 7.6% of increase over the recompleted case. Figure 19 shows also that the increase occurs mainly in the first 12 years of production. This fact may be interesting in terms of the financial performance for the project. Conclusions In this paper we have shown an optimization procedure applied to intelligent wells, that is, wells with the ability to control multiple production zones. The optimization procedure was applied in two Brazilian offshore fields to quantify the benefits of intelligent wells over conventional completion scenarios. The results have shown significant increases in the prediction cumulative oil production for the two cases. Nomenclature Np = cumulative oil production Wp = cumulative water production Wi = cumulative water injection NPV = net present value ∆pv = pressure drop in the valve Cu = unit conversion factor Cv = dimensionless valve coefficient ρ = fluid density v = fluid velocity q = flow rate A = area of constriction Acknowledgments The authors would like to thank Petrobras for the permission to publish this paper. References 1. Akram, N.; Hicking, S.; Blythe, P.; Kavanagh, P.; Reijnen, P. and Mathieson, D.: “Intelligent Well Technology in Mature Assets”, paper SPE 71822 presented at 2001 Offshore Europe Conference, Aberdeen, Scotland, UK, 4-7 September. 2. Balinas, J.: “Evaluation and Control of Drilling, Completion and Workover Events with Permanent Downhole Monitoring: Applications to Maximize Production and Optimize Reservoir Management”, paper SPE 74395 presented at 2002 SPE International Petroleum Conference and Exhibition of Mexico, Villahermosa, Mexico, 10-12 February. 3. Sharma, A.K.; Chorn, L.G.; Han, J. and Rajagopalan, S.: “Quantifying Value Creation from Intelligent Completion Technology Implementation”, paper SPE 78277 presented at 2002 European Petroleum Conference, Aberdeen, Scotland, UK, 29-31 October. 4. Johnstone, S.; Duncan, G.; Kvaerner, A.; Giuliani, C. and Denholm, A.: “Implementing Intelligent Well Completion in Brown Field Development”, paper SPE 77657 presented at 2002 SPE International Petroleum Conference and Exhibition, San Antonio, Texas, USA, 29 September – 2 October. 5. Glandt, C.A.: “Reservoir Management Employing Smart Wells: A Review”, paper SPE 81107 presented at SPE latin American and Caribbean Petroleum Engineering Conference, Port-of-Spain, Trindad, 27-30 April. 6. Goggin, D.J.; Ovuede, M.A.; Liu, N.; Ozdogan, U.; Coleman, P.B.; Meinert, D.P.; Nygard, I. and Gontijo, J.: “Maximizing Production Capacity Using intelligent-Well Systems in a Deepwater, West-Africa Field”, paper SPE 103308 presented at 2006 SPE Annual Technical Conference and Exhibition, San Antonio, Texas, USA 24-27 September. 7. Yeten, B.; Durlofsky, L.J. and Aziz, K.: “Optimization of Smart Well Control”, paper SPE 79031 presented at 2002 SPE/IPS0CIM/CHOA International Operations and Heavy Oil Symposium and International Horizontal Well Technology Conference, Calgary, Alberta, Canada 4-7 November. 8. Brouwer, D.R.; Jansen, J.D., van der Starre, S.; van Kruijsdijk, C.P.J.W. and Berentsen, C.W.J.: “Recovery Increase through Water Flooding with Smart Well Technology”, paperSPE 68979 presented at 2001 SPE European Formation Damage Conference, The Hague, Netherlands, 21-22 May. 9. Brouwer, D.R. and Jansen, J.D.: “Dynamic Optimization of Water Flooding with Smart Wells Using Optimal Control Theory, paper SPE 78278 presented at 2002 European Petroleum Conference, Aberdeen, Scotland, UK, 29-31 October. 10. Ajayi, A. and Konopczynki, M.: “A Dynamic Optimization Technique for Simulation of Multi-Zone Intelligent well Systems in a Reservoir Development”, paper SPE 83963 D ow nloaded from http://onepetro.org/SPELAC P/proceedings-pdf/07LAC PEC /07LAC PEC /SPE-107261-M S/3665015/spe-107261-m s.pdf by U niversidade Federal D e Pelotas user on 16 D ecem ber 2024 SPE 107261 9 presented at 2003 Offshore Europe, Aberdeen, Scotland, UK, 2-5 September. 11. Naus, M.M.J.J.; Dolle, N. and Jansen, J.D.: “Optimization of Commigled Production using Infinitely Variable Inflow Control Valves”, paper SPE 90959 presented at 2004 SPE Annual Technical Conference and Exhibition, Huston, Texas, USA 26-29 September. 12. Kolda, T.G, Lewis, R.M. and Torczon, V.: “Optimization by Direct Search: New Perspectives on Some Classical and Modern Methods”, SIAM Review, Vol, 45, No. 3, pp. 385- 482, 2003 Society for Industrial and Applied Mathematics. 13. Hooke, R. and Jeeves, T.A.: “Direct search solution of numerical and statistical problems”, J. ACM, 8 (1961), pp. 212–229. 14. Portella, R.C.M., Pacheco, M.A.C., “Análise Econômica de Projetos E&P sob Incerteza”, Petrobras internal report, in Portuguese, 2005. 15. Official OMG CORBA Components page – http://www.omg.org/technology/documents/formal/compone nts.htm. 16. GeoQuest, Schlumberger, “ECLIPSE Reference Manual”, 2004A. 17. Computer Modeling Group – CMG, Imex User Manual, 2005. 18. Holmes, J.A.; Barkve, T. and Lund, Ø.: “Application of a Multisegment Well Model to Simulate Flow in Advanced Wells”, paper SPE 50649 presented at 1998 SPE European Petroleum Conference, The Hague, Netherlands, 20-22 October. D ow nloaded from http://onepetro.org/SPELAC P/proceedings-pdf/07LAC PEC /07LAC PEC /SPE-107261-M S/3665015/spe-107261-m s.pdf by U niversidade Federal D e Pelotas user on 16 D ecem ber 2024 http://www.omg.org/technology/documents/formal/components.htm http://www.omg.org/technology/documents/formal/components.htm