Prévia do material em texto
2011-02-25 Page 1 of 9 MICROLAB ® STAR Line Preventive Maintenance Checklist Reference Service Manual: P/N 624020 PM Date: PM Report #: Customer: Contact Person: Address: Phone: FAX: eMail: Service Organization: Contact Person: Address: Phone: FAX: eMail: Instrument: ML STAR IVD Software Version: Serial #: Computer: Always wear required personal protection equipment! Maintenance Performed by: Date: 2011-02-25 Page 2 of 9 MICROLAB ® STAR Line Preventive Maintenance Checklist ACTION N/A OK REMARKS Clean and Decontaminate Instrument Surfaces using Disinfectant (P/N 281243 or P/N 281245): Instrument Covers Deck Docking Station Loading Trays Autoload Ribbon X-Arm Housing (on Casted Frame only) Spillage Trays (on Casted Frame only) iSWAP HAMILTON Heater Shaker Others Others If necessary: Clean / Replace the Air Filter (P/N 147683) (on Casted Frame only) 2011-02-25 Page 3 of 9 MICROLAB ® STAR Line Preventive Maintenance Checklist ACTION OK REMARKS On the Autoload: Check the Insertion Guides against contamination and damage – replace as needed. Check the Loading Trays against defective or broken Slide Blocks – replace as needed. Check for bowed (bent or warped) Loading Trays – replace as needed. Check for lifted (not completely attached) Insertion Guides – repair, replace as needed. Check against defective or broken Stop Hooks – replace as needed. Detach the Autoload Ribbon: Check for signs of liquid spillage underneath. Inspect the surfaces under the Autoload Ribbon – if needed, Clean and Decontaminate. Clean the Flat Band Cables channel and ensure collision free movement of the Flat Band Cables. Inspect all belts and drives for any damage or loose screws. Check the Cable Connections. On the Autoload X-Linear Guide: Check – if necessary, slight lubricate with Topas Grease AK50 (P/N 173310). ACTION OK REMARKS On the X-Arm(s): Check cable connections to all available components. Check that the ribbon cables which move inside the cable channels can move without obstruction. If necessary, slightly lubricate with Topas Grease AK50 (P/N 173310): The X-Arm X-Rail. The Channel Y-Rails. If necessary, clean using a brush and slightly lubricate with Silicone Spray (P/N 511118): The Y-Spindles; remove from the X-Arm and spray into a waste container. Check and if necessary clean with a Paper Towel: The X-Arm(s) front X-Guide Shaft. Clean at the ends of the rear X-Linear Guide but do not remove lubricant. Clean dust and particles from all areas of the Instrument. 2011-02-25 Page 4 of 9 MICROLAB ® STAR Line Preventive Maintenance Checklist ACTION N/A OK REMARKS On each 1000µl Channel: Check the Tension Spring. Check for the correct Y-Belts (no golden or transparent). On each Dosing Spindle: Clean and only slightly grease with Topas Grease AK50 (P/N 173310). On each Squeezer Spindle: With Plastic Nuts – if dry, slightly lubricate with Silicone Fluid (P/N 511119). With Brass Nuts – lubricate with Topas Grease AK50 (P/N 173310). On each Pipetting Head: Perform the CHECK_PIP.MCR Macro Program to verify that all Channels are within the allowed tolerances. If the tolerances are exceeded, follow the Mis-Adjusted or Replaced Part on X-Arm Flowchart. Perform the CHECK_PIP_cLLD.MCR Macro Program to check the Squeezer Sleeves with cLLD Flex Print for proper cLLD operation. Replace Squeezer Sleeves with cLLD Flex Print as needed. Replacement Squeezer Sleeves with cLLD Flex Print Set of 8 (P/N 199312). Perform the ADJUST_PIP_SQUEEZER_AND_Z.MCR Macro Program. Remove O-Rings, Stop Disks and Washers during the Macro Program. Replace the CO-RE O-Rings. Replacement CO-RE O-Rings (P/N 254167/each) Set of 8 (P/N 183060) Check / replace as needed the Tip Ejection Tubes. Replacement Tip Ejection Tubes (P/N 173330) Check Stop Disks (if installing new Stop Disks, use Ergo 4003 P/N 511114). Replacement Stop Disks (P/N 173332/each) Replacement Flat Washer P/N 173520/each) Set of 8 Stop Disks w/Flat Washers (P/N 183061) Annually: It is recommended to replace the Stop Disks and Flat Washers (use Ergo 4003 P/N 511114). Replacement Stop Disks (P/N 173332/each) Replacement Flat Washer (P/N 173520/each) Set of 8 Stop Disks w/Flat Washers (P/N 183061) 2011-02-25 Page 5 of 9 MICROLAB ® STAR Line Preventive Maintenance Checklist ACTION N/A OK REMARKS On the iSWAP: Check for the correct Y-Belts (no golden or transparent). On the Robotic Hand Spindle: Clean – if necessary, slightly lubricate with Silicone Fluid (P/N 511119). Test Run: Use the Service Software to check all movements. Run a plate positioning method in the User Software. ACTION N/A OK REMARKS On the CO-RE 5ml Channel: Check the Stop Disk for scratches; if necessary, replace (if installing new Stop Disks, use Ergo 4003 P/N 511114). Replacement Stop Disk (P/N 184123) Replacement Flat Washer (P/N 184124) Replacement CO-RE O-Ring (P/N 254260) Check the Tip Ejection Tube for free movement. On each Dosing Spindle: Clean and slightly lubricate with Topas Grease AK50 (P/N 173310). Test Run: Perform a Test Run. Annually: Replace the CO-RE O-Rings. Replacement CO-RE O-Rings (P/N 254260) Clean dust from the Dosing Belt and Pulleys. ACTION N/A OK REMARKS On the HAMILTON Heater Shaker: Clean and Decontaminate with DECONEX 61 DR (P/N 281242): The external surfaces. ACTION N/A OK REMARKS On all Other’s: 2011-02-25 Page 6 of 9 MICROLAB ® STAR Line Preventive Maintenance Checklist ACTION OK REMARKS Remove Deck Panels: Note: HAMILTON recommends removal of Deck Panels on an annual basis or when signs of spillage are observed. Check against defective or broken Slide Blocks. Inspect for signs of liquid spillage underneath the Deck and inside the Electronics Chamber. Check – if necessary, decontaminate and clean the underside surfaces of the Deck, underneath the Deck space and the Electronic Chamber Cover. Clean the Flat Band Cables channel and ensure collision free movement of Flat Band Cables, Check the Steel Band and Flat Band Cables for damage, cracks or breaking – replace as needed. Inspect all belts, drives and cables for any damage or loose screws. Check the distance of the X-Magnetic Reader on the X-Arm(s) to the Magnetic Tape. ACTION OK REMARKS Re-Assemble: The Deck Panels and carefully reconnect the Carrier Stops. The Autoload Ribbon. The Loading Trays. The X-Arm. All Deck Components. ACTION OK REMARKS Check the Instrument: All covers are re-installed (i.e., Side Covers, Top Covers, etc.). All instrument cables are OK (i.e., Power and Communication Cables). Instrument stickers OK. All interlocks active (i.e., Front Window locks) 2011-02-25 Page 7 of 9 MICROLAB ® STAR Line Preventive Maintenance Checklist ACTION OK REMARKS Check all available Carriers: For signs of liquid spillage and damage – if necessary, Clean and Decontaminate the Carriers. Ensure smooth gliding on the Deck Panels and Loading Trays. Ensure all tracks are equal regarding friction, bumps, snap in and pull out. Check that one Carrier snaps into the Carrier Stops with the same force on all Track Positions. Damaged Carriers should be replaced (inform customer). ACTION OK REMARKS Check the Teaching Needles: For signs of damage and contamination – if necessary, Clean and Decontaminate the Teaching Needles. DamagedTeaching Needles should be replaced (inform customer). ACTION OK REMARKS Perform the following Instrument Check Procedures according to the appropriate IQ Section: ! Firmware against Compatibility List ! Instrument Configuration Instrument Data ! Setup / Installation Flowchart ! Pressure Sensor Check Flowchart ! Power cycle the Instrument by shutting down the Service Software and Switching OFF, then ON the Instrument. ! Perform Weekly Maintenance (if available) 2011-02-25 Page 8 of 9 MICROLAB ® STAR Line Preventive Maintenance Checklist ACTION N/A OK REMARKS Perform Volume Field Verification: ! 300µl or 1000µl Pipetting Channels ! 5ml Pipetting Channels ACTION N/A OK REMARKS Perform Field Verification 2: ! Cover Safety Verification Position Verification: ! 1000µl Pipetting Channels ! 5ml Pipetting Channels Volume Verification: ! 1000µl Channels ! 5ml Pipetting Channels Temperature Verification: ! HAMILTON Heater Shaker Shaker Verification: ! HAMILTON Heater Shaker Print out the Verification Reports It is recommended to perform a Test Run www.hamiltonrobotics.com Page 9 of 9 MICROLAB ® STAR Line Preventive Maintenance Checklist ACTION OK REMARKS Documentation – Print and/or store: ! Instrument Configuration ! Instrument Data ! Reports (Verification, Maintenance, etc.) RECOMMENDED ACTIONS: ACTION OK REMARKS Removal of Trace Files and Old Methods is recommended: ! With the Laboratory Supervisor, check for trace files which can be deleted from the Operating PC ! Check for Trace Files such as: Method / System Trace Files and Communication Trace Files ! Check for old methods, which can be removed from the Operating PC ! Back them up if necessary, else delete ACTION OK REMARKS Checking the Operating PC performance is recommended: ! Check for available disk space on the Hard Disk, 500MB minimum space is needed ! Advise the Laboratory Supervisor to run “Error-checking” and “Defragmentation” on the Hard Disk ! Service Software removal from the Operating PC is recommended