Prévia do material em texto
ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 1 1 2 3 4 5 6 ISPE GOOD PRACTICE GUIDE 7 8 HVAC 9 10 11 12 DRAFT FOR REVIEW 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 © 2008 ISPE. ALL RIGHTS RESERVED. 40 41 42 43 44 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 2 TABLE OF CONTENTS 45 46 1 INTRODUCTION ...................................................... 5 47 1.1 BACKGROUND .................................................... 5 48 1.2 SCOPE OF THIS GUIDE ........................................... 5 49 1.3 OBJECTIVES OF THIS GUIDE ...................................... 6 50 1.4 DEFINITIONS ................................................... 6 51 1.5 REFERENCES .................................................... 6 52 2 FUNDAMENTALS OF HVAC .............................................. 9 53 2.1 INTRODUCTION .................................................. 9 54 2.2 WHAT IS HVAC? ................................................. 9 55 2.3 AIRFLOW FUNDAMENTALS ......................................... 13 56 2.4 PSYCHROMETRICS ............................................... 19 57 2.5 EQUIPMENT .................................................... 21 58 2.6 HVAC SYSTEM CONFIGURATION .................................... 23 59 2.7 HVAC CONTROLS AND MONITORING ................................. 39 60 2.8 SYSTEM ECONOMICS ............................................. 51 61 2.9 SUSTAINABILITY (TO BE WRITTEN LATER) ........................ 58 62 3 THE DESIGN PROCESS ............................................... 59 63 3.1 INTRODUCTION ................................................. 59 64 3.2 DEVELOPING THE USER REQUIREMENTS SPECIFICATION (URS) ......... 61 65 3.3 HVAC SYSTEM RISK ASSESSMENT .................................. 69 66 4 HVAC APPLICATIONS BY PROCESS AND CLASSIFICATION .................. 73 67 4.1 INTRODUCTION ................................................. 73 68 4.2 SYSTEM APPLICATIONS .......................................... 73 69 4.3 ROOM LEVEL EXAMPLES .......................................... 78 70 4.4 ACTIVE PHARMACEUTICAL INGREDIENTS (API) - (WET END) .......... 83 71 4.5 ACTIVE PHARMACEUTICAL INGREDIENTS (API) - (DRY END) .......... 84 72 4.6 BIOLOGICS .................................................... 85 73 4.7 ORAL SOLID DOSAGE (NON-POTENT COMPOUNDING) ................... 86 74 4.8 ORAL SOLID DOSAGE (POTENT COMPOUNDING) ....................... 89 75 4.9 ASEPTIC PROCESSING FACILITY .................................. 91 76 4.10 PACKAGING/LABELING ........................................... 94 77 4.11 LABS ......................................................... 95 78 4.12 SAMPLING/DISPENSING .......................................... 99 79 4.13 ADMINISTRATIVE AND GENERAL BUILDING ......................... 100 80 4.14 WAREHOUSE ................................................... 101 81 4.15 PROCESS EQUIPMENT CONSIDERATIONS ............................ 102 82 5 DESIGN QUALIFICATION / DESIGN REVIEW (DQ/DR) .................... 106 83 5.1 DESIGN REVIEW/ DESIGN VERIFICATION/DESIGN QUALIFICATION ..... 106 84 5.2 INTRODUCTION ................................................ 108 85 6 EQUIPMENT FUNCTION, INSTALLATION, AND OPERATION ................. 117 86 6.1 EQUIPMENT FUNCTION AND MANUFACTURE .......................... 117 87 6.2 EQUIPMENT INSTALLATION AND STARTUP .......................... 147 88 6.3 EQUIPMENT OPERATION AND MAINTENANCE ......................... 156 89 7 VERIFICATION AND TESTING ........................................ 165 90 7.1 INTRODUCTION ................................................ 165 91 7.2 PHILOSOPHY .................................................. 165 92 7.3 PRINCIPLES .................................................. 166 93 7.4 REGULATORY EXPECTATIONS ..................................... 167 94 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 3 7.5 KEY CONCEPTS OF VERIFICATION ................................ 167 95 7.6 DESIGN, SPECIFICATION, VERIFICATION, AND ACCEPTANCE PROCESS . 169 96 7.7 SUPPORTING PROCESSES ........................................ 170 97 8 DOCUMENTATION REQUIREMENTS ...................................... 172 98 8.1 INTRODUCTION ................................................ 172 99 8.2 ENGINEERING DOCUMENT LIFECYCLE .............................. 172 100 8.3 DOCUMENTS FOR MAINTENANCE AND OPERATIONS (NON-GMP) .......... 173 101 8.4 MASTER/RECORD DOCUMENTS ..................................... 173 102 8.5 GMP HVAC DOCUMENTS .......................................... 174 103 9 PSYCHROMETRICS .................................................. 176 104 9.1 DRY-BULB TEMPERATURE ........................................ 176 105 9.2 WET-BULB TEMPERATURE ........................................ 176 106 9.3 DEW-POINT TEMPERATURE ....................................... 177 107 9.4 BAROMETRIC OR TOTAL PRESSURE ................................ 179 108 9.5 SPECIFIC ENTHALPY ........................................... 179 109 9.6 SPECIFIC VOLUME ............................................. 180 110 9.7 EIGHT FUNDAMENTAL VECTORS ................................... 183 111 10 COMMISSIONING AND QIUALIFICATION PROCESS ...................... 185 112 10.1 COMMISSIONING AND QUALIFICATION ............................. 185 113 10.2 IMPACT RELATIONSHIPS ........................................ 186 114 10.3 RISK ASSESSMENT MATRIX ...................................... 187 115 11 MISCELLANEOUS HVAC INFORMATION ................................ 188 116 11.1 GLOSSARY OF TERMS ........................................... 188 117 11.2 EQUATIONS USED IN HVAC AND THEIR DERIVATION ................. 188 118 12 REFERENCES .................................................... 195 119 12.1 SUMMARY OF USEFUL CLEANROOM EQUATIONS ....................... 195 120 12.2 PRESSURE CONTROL WHEN AIRLOCKS ARE NOT POSSIBLE ............. 196 121 12.3 HEPA FILTERS FOR HOT ZONES (DEPYROGENATION) ................. 196 122 12.4 USEFUL REFERENCE MATERIALS .................................. 196 123 12.5 HVAC EXAMPLES AND WORKBOOK (???) ............................ 196 124 12.6 EXAMPLE DOCUMENTS ........................................... 196 125 126 127 128 129 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 5 1 INTRODUCTION 130 131 1.1 BACKGROUND 132 133 The heating, ventilating, and air conditioning (HVAC) system is one of 134 the more critical systems affecting the ability of a pharmaceutical 135 facility to meet its key objectives. HVAC systems which are properly 136 designed, built, operated, and maintained can help ensure the quality 137 of product manufactured in that facility, improve reliability, and 138 reduce both first cost and ongoing operating costs of the facility. The 139 design of HVAC systems for the pharmaceutical industry requires special 140 considerations beyond those for most other industries, particularly in 141 regards to cleanroom applications. 142 143 Each of the previously published ISPE Baseline® Guides for facilities 144 (Active Pharmaceutical Ingredients, Oral Solid Dosage, Sterile Products 145 Manufacture, Biopharmaceuticals, etc.) have included some discussion of 146 the considerations for HVAC systems for facilities of that type. This 147 Good Practice Guide is intended to supplement those sections with more 148 detailed information and recommended practices for implementation of 149 HVAC systems in pharmaceutical facilities. 150 151 1.2 SCOPE OF THIS GUIDE 152 153 The Guide provides supporting information and HVAC practices for 154 facility types covered by Baseline Guides. 155 156 The Guide provides an overview of thebasic principles of HVAC only to 157 the extent required to facilitate a common understanding and consistent 158 nomenclature. 159 160 This guide addresses HVAC requirements in the following areas of 161 facility lifecycle. 162 163 Establishing User Requirements 164 Design 165 Construction 166 Commissioning / Qualification 167 Operation / Maintenance 168 Redeployment for other use 169 Decommissioning 170 171 The guide does NOT serve as a handbook for HVAC design (e.g. it does 172 not discuss the details of sizing and selection of equipment. It does 173 go into boring detail on the physics of air and humidity.) 174 175 The guide clarifies HVAC issues critical to the Safety, Identity, 176 Strength, Purity and Quality (SISPQ) for the production of bulk and 177 finished pharmaceuticals and biopharmaceuticals, and it considers the 178 requirements for HVAC control and monitoring systems. 179 180 This guide addresses how to implement the recommendations in the 181 Baseline guides to meet FDA and EMEA regulatory expectations for HVAC 182 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 6 design. 183 184 This guide references but does NOT reiterate the issues or content from 185 the Baseline guides. The appropriate Baseline Guide should be consulted 186 for regulatory expectations. 187 188 The guide discusses the impact of external conditions on HVAC design. 189 190 This guide attempts to give information in I/P and SI units. 191 192 The user of this guide should apply good engineering practice in 193 assessing which of the recommended practices is most applicable to a 194 situation. 195 196 1.3 OBJECTIVES OF THIS GUIDE 197 198 Provide the Pharmaceutical Engineering Community with common language 199 and understanding of critical HVAC issues. 200 201 Provide guidance on accepted industry practices to address these 202 issues. 203 204 Provide a single common resource for HVAC information currently 205 included in appendices of the various Baseline© guides. 206 207 Target a global audience, with particular focus on US (FDA) and 208 European (EMEA) regulated facilities. 209 210 1.4 DEFINITIONS 211 212 This GPG uses terms as defined in the ISPE Glossary of Pharmaceutical 213 Engineering Terminology and will not repeat these definitions here. 214 Only new terms or terms specific to the content of this GPG are defined 215 in the Glossary. 216 217 1.5 REFERENCES 218 219 a. ISO Standards for Cleanrooms and Associated Controlled Environments 220 221 ISO 14644-1 Classification of air cleanliness 222 ISO 14644-2 Specifications for testing and monitoring to prove 223 continued compliance with ISO 14644-1 224 ISO 14644-3 Test methods 225 ISO 14644-4 Design, construction and start-up 226 ISO 14644-5 Operations 227 ISO 14644-6 Vocabulary 228 ISO 14644-7 Separative devices (clean air hoods, glove boxes, 229 isolators, and mini-environments) 230 ISO 14644-8 Classification of airborne molecular contamination 231 ISO 14698-1 Biocontamination control, Part 1: General principles and 232 methods 233 ISO 14698-2 Biocontamination control‘ Part 2: Evaluation and 234 interpretation of biocontamination data. 235 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 7 236 b. IEST Recommended Practices 237 238 RP-CC034.2- HEPA and ULPA Filter Leak Tests 239 RP-CC006.3- Testing Cleanrooms 240 RP-CC012.1- Considerations in Cleanroom Design 241 242 c. ISPE Baseline Guides 243 244 Vol. 1- Active Pharmaceutical Ingredients 245 Vol. 2- Oral Solid Dosage Forms 246 Vol. 3- Sterile Manufacturing Facilities 247 Vol. 4- Water and Steam Systems 248 Vol. 5- Commissioning and Qualification 249 Vol. 6- Biopharmaceuticals 250 251 d. ASHRAE- specific ASHRAE documents which are used in this GPG: 252 253 ASHRAE standard 62.1 - Ventilation for Acceptable Indoor Air Quality 254 ASHRAE standard 90.1 - Energy Standard for Buildings Except Low-Rise 255 Residential Buildings 256 ASHRAE standard 110 - Method of Testing Performance of Laboratory 257 Fume Hoods 258 ASHRAE Handbooks - Fundamentals; Applications; Systems & Equipment 259 260 e. ASTM Standard E2500-07 - Standard Guide for Specification, Design, 261 and Verification of Pharmaceutical and Biopharmaceutical Manufacturing 262 Systems and Equipment 263 264 f. US FDA Guidance for Industry ―Sterile Drug Products Produced by 265 Aseptic Processing- Current Good Manufacturing Practice‖ (2004) 266 267 g. EudraLex Volume 4 ―EU Guidelines to Good Manufacturing Practice‖ 268 269 ‗Medicinal Products for Human and Veterinary Use‘ 270 Annex 1: Manufacture of Sterile Medicinal Products 271 Annex 2: Manufacture of Biological Medicinal Products for Human Use 272 273 h. The Good Automated Manufacturing Practice (GAMP) Guide for 274 Validation of Automated Systems in Pharmaceutical Manufacture 275 276 i. WHO document on HVAC- proposed draft, does not apply to this 277 document. 278 279 j. CFR Title 21 Food & Drugs 280 281 Part 11: Electronic records 282 Part 210: Current good manufacturing practice in manufacturing, 283 processing, packing or holding of drugs; general 284 Part 211: Current good manufacturing practice for finished 285 pharmaceuticals 286 287 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 8 k. FDA Guidance for Industry/ICH Guidelines 288 289 Q7A: Good manufacturing practice guidance for active pharmaceutical 290 ingredients 291 Q8: Pharmaceutical Development 292 Q9: Quality Risk Management 293 Q10: Quality Systems 294 295 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 9 2 FUNDAMENTALS OF HVAC 296 297 2.1 INTRODUCTION 298 299 Most people live in homes with equipment incorporated into the building 300 to keep them comfortable. They have windows to allow natural 301 ventilation and heating and cooling systems to maintain desired 302 temperatures. 303 304 We have the same goal in our pharmaceutical manufacturing workplace – 305 to make people comfortable, but we also have the more exacting 306 requirement to control the impact of the environment on the finished 307 product (i.e., product SISPQ). 308 309 This guide introduces the fundamentals of the HVAC systems that control 310 the GMP workplace environment. Only three room environment variables 311 may have an effect on product and processes (at the ―critical 312 locations‖): 313 314 Air temperature at the critical location may affect product or 315 product contact surfaces 316 Relative humidity of the air at the critical location may affect 317 product moisture content, or may affect product contact surfaces 318 (via corrosion, etc.) 319 Airborne contamination at the critical location (may affect product 320 purity or product contact surfaces) 321 322 Some variables, such as local contaminants, depend on other HVAC 323 variables such as room pressure, air changes, airflow volume, airflow 324 direction and velocity, and air filter efficiency. 325 326 2.2 WHAT IS HVAC? 327 328 HVAC (Heating, Ventilation and Air Conditioning) is the generic name 329 given to a system that provides the conditioning of the environment 330 through the control of Temperature, Relative Humidity, Air Movement and 331 air quality - including fresh air, airborne particles, and vapors. 332 HVAC systems can increase or decrease temperature, increase or reduce 333 the moisture or humidity in the air, decrease the level of particulate 334 or gaseous contaminants in the air. These abilities are employed for 335 comfort and to protect people and product. 336 337 2.2.1 People Comfort 338 339 The firstrole of HVAC systems is to make people comfortable. We notice 340 the HVAC system‘s performance when we are uncomfortable, but what 341 conditions are actually required to make people comfortable? 342 343 Four criteria are commonly considered for people comfort: 344 345 Temperature 346 Humidity 347 Air quality (contaminants, both particles and odors) 348 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 10 Air movement (airflow direction and speed to control ―drafts‖) 349 350 2.2.1.1 Temperature and Humidity 351 352 The following drawing shows two boxes which define "comfort" conditions 353 (Temperature and Humidity) that Americans find comfortable in winter 354 and summer (from the ASHRAE Handbook). This standard varies across the 355 world - for example, in parts the tropics people prefer an office at 75 356 degrees F (24 degrees C) to one at 72 F (22°C). 357 358 It should also be noted that these are general guidelines, as many 359 things affect these conditions apart from individual preferences - the 360 type and consistency of work being performed, for example. 361 362 This is apparent in the office workplace, with the different levels of 363 clothing people wear, some people dressed more heavily than others in 364 order to be comfortable 365 366 367 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 11 368 Figure 2-1 Standard Effective Temperature and ASHRAE Comfort Zones 369 courtesy of ______________________ 370 371 2.2.1.2 Air Movement 372 373 Some people prefer a light sensation of air movement and some prefer 374 still air, so a typical design figure of 0.1 m/s (3 ft/sec) is used in 375 an office environment. Greater air velocities are usually needed for 376 product protection. 377 378 2.2.1.3 Air Quality 379 380 People need fresh air to dilute exhaled carbon dioxide and other 381 environmental contaminants. The amount of fresh air required depends on 382 the activity; the table below shows typical oxygen use for different 383 levels of activity. 384 385 Level of exertion Oxygen consumed L/min Light work LT 0.5 Moderate work 0.5 to 1.0 Heavy work 1.0 to 1.5 Very heavy work 1.5 to 2.0 Extremely heavy work GT 2.0 386 Table2-1 Oxygen Consumption by activity Level 387 388 The amount of fresh air required to dilute environmental contaminants 389 is a minimum of 15 to 20 cubic feet per minute (cfm) or 24 to 32 cubic 390 meters per hour per person . 391 392 2.2.2 Product and Process Considerations 393 394 Product may be sensitive to temperature and humidity and to airborne 395 contamination - from outside sources or cross-contamination between 396 products. Process operators may need protection from exposure to 397 hazardous or potent materials 398 399 It is usually possible to find the product‘s environmental 400 requirements, as they will be listed in the NDA when they are 401 considered critical. The impact of conditions outside these ranges 402 will depend on the duration of exposure – prolonged exposure time may 403 reduce the efficacy of the product. 404 405 Control of airborne cross contamination and contamination are always 406 major issues. These requirements are often interlinked with temperature 407 and humidity – consider the effect of temperature for example; 408 409 Comfortable people work more efficiently – they are more 410 productive, and make fewer mistakes. They also produce fewer 411 environmental contaminants: A typical person will give off 100,000 412 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 12 particles a minute doing relatively sedentary work (particles sized 413 0.3 micron and larger – a human hair is approximately 100 micron in 414 diameter). A worker who is hot and uncomfortable may shed several 415 million particles per minute in this size range, including more 416 bacteria. 417 418 Environmental conditions inside a building can influence the product in 419 other ways – higher temperatures and humidity tend to increase 420 microbial growth rates, particularly with regard to mold. 421 422 If building conditions are significantly different from those outside 423 and the fabric of the building does not have sufficient integrity, 424 condensation in interstitial spaces can occur and can lead to microbial 425 contamination problems and deterioration of the building. 426 427 Operator protection also depends on air flow direction both within and 428 between rooms. Airflow can entrain particles of product, product in 429 other rooms, or other hazardous materials harmful to operators. Though 430 differential pressure is commonly used as a control of contamination 431 between two rooms, it is the airflow generated by the differential 432 pressure that contains the product 433 434 2.2.3 How does the HVAC system control these parameters? 435 436 2.2.3.1 Temperature and Humidity 437 438 The HVAC system controls the temperature and humidity in the room using 439 the mechanism of supplying the room with air at a condition that, when 440 mixed with the room air, will yield the desired temperature and 441 humidity. 442 443 The heat gains and losses to and from the space are through the usual 444 mechanisms of heat transfer - Radiant, conductive and convective heat 445 transfer. These may be due to solar gain, external temperature outside 446 the facility, and internal heat gains due to the process, equipment, 447 people and lighting. 448 449 The changes in humidity are due to the process, people and the 450 environment. Moisture migration into the controlled space from 451 surrounding areas is governed by the difference in vapor pressure, as 452 defined by Dalton‘s law, and can sometimes migrate against an air 453 pressure differential 454 455 2.2.3.2 Air velocity 456 457 In a working environment, air velocity is not as critical in terms of 458 human comfort as it is in an office environment. Velocity is critical 459 to proper mixing of air within the room and transport of airborne 460 particulates. 461 462 2.2.3.3 Particulate/fume and vapor control 463 464 The control of the particulate levels in the room, and in some cases 465 vapors/fumes, may be by dilution and displacement, controlling the 466 particulate levels in the supply air through filtration, and vapor/fume 467 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 13 level by the use of exhaust and replacement (makeup) fresh air where 468 necessary. 469 470 2.2.4 What can‘t the HVAC System do? 471 472 HVAC systems are not a substitute for good process, facilities and 473 equipment design and good operating procedures. HVAC can not clean 474 surfaces that are already contaminated, and as a practical matter, it 475 cannot control processes that generate an excess of contaminants or 476 compensate for improperly designed or maintained facilities. HVAC, 477 while a common suspect area for investigation, is rarely the cause - or 478 the solution - for persistent contamination problems. 479 480 2.3 AIRFLOW FUNDAMENTALS 481 482 2.3.1 Introduction 483 484 As was discussed in section 2.1, HVAC can contribute to the control of 485 temperature, humidity, and particulates within a space. In order to 486 understand what equipment is needed to achieve this at the HVAC system 487 level, we must first define what the air is intended to do at the room 488 level. 489 490 Both the quality (temperature, humidity, filtration) and quantity of 491 air introduced into a room affect its ability to maintain environmental 492 conditions. This explores the effects of physical layout (geometry), 493 air velocity and air volume in assuring effective ventilation. 494 495 2.3.2Ventilation Fundamentals 496 497 Ventilation is the movement and replacement of air for the purpose of 498 maintaining a desired environmental quality within a space. Ventilation 499 is responsible for the transport of airborne particles, the movement of 500 masses of hot or cold air, the removal of airborne contaminants (e.g., 501 vapors and fumes) and the supply of ―fresh‖ O2 rich air. 502 503 Although the layman may be conscious of the term ―air change rates‖ 504 (more properly called ―ventilation rate‖), successful pharmaceutical 505 HVAC design can be attributed to proper filtration and attention to the 506 physical geometry of airflow in a space. The layout of inlets and 507 outlets with relation to the sources of contamination/heat and 508 accommodation for expected obstructions are key to controlling 509 contamination and yielding effective HVAC design. The relationship 510 between these factors is expressed in the ―effective ventilation rate‖ 511 for a space. This measure expresses the efficiency of the HVAC system 512 at removing contaminants expressed as a % of the theoretical 513 performance of perfect dilution. When comparing the effective 514 ventilation rates of various designs, it becomes clear that good 515 layout and filtration can produce desired airborne particulate levels 516 and recovery rates at lower than expected air change rates. 517 518 2.3.3 Contamination Control 519 520 The primary factor that separates pharmaceutical HVAC from comfort HVAC 521 is the need to control contamination. This stems from the need to 522 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 14 assure the ―…purity, identity and quality…‖ of the product (21CFR211). 523 Pharmaceutical HVAC is one tool in preventing unwanted environmental 524 contaminants from adversely affecting a product and to prevent products 525 from contaminating one another. It can also assist in limiting operator 526 exposure to potent pharmaceutical compounds, ingredients or reagent 527 vapors. Contamination control is generally achieved by filtering the 528 incoming air, to assure that it does not carry particulates, and then 529 introducing the air to the work space at sufficient velocity and volume 530 to transport unwanted particulate out of the work zone. The orientation 531 of these airflows can aligned so as to protect product or personnel by 532 sweeping across one or the other (or both) on its way from the supply 533 terminal to the extract point. Local supply or extraction can also 534 assist in contamination control by creating a local environment that 535 excludes or removes particulate. 536 537 Pharmaceutical HVAC can help control contaminants within a space, but 538 these facilities must be designed with several additional features that 539 contribute to this mission of limiting the migration of contaminants. 540 541 2.3.4 Airlocks 542 543 In order to minimize the amount of air that is needed to maintain 544 particle transport velocities (typically over 100fpm times 21 square 545 feet of open door area equals 2100 cfm) it is desirable that the doors 546 of a contamination controlled space remain closed. One way to do this 547 is to provide airlocks or ―ante rooms‖. These rooms control traffic 548 into and out of a space through a series of interlocked doors to assure 549 that a door to the space is always closed. 550 551 Airlocks serve other purposes as well: 552 553 they maintain some differential pressure between the two areas they 554 serve, such that the DP can not drop to zero 555 they provide a location for gowning/de-gowning prior to 556 entering/exiting a classified space 557 they provide a location for sanitizing / decontamination of incoming 558 or outgoing materials and equipment 559 they can be designed with a small volume and high air change rate to 560 allow them to recover quickly and function to minimize the 561 particulate introduced to a classified space by door openings. 562 they provide can provide a high or low pressure buffer to control 563 the ingress and egress of contaminants. 564 565 2.3.5 Classified Space 566 567 A key measurement of room environmental conditions for pharmaceutical 568 operations is the concentration of total airborne particulate and/or 569 microbial contamination within the space; this is referred to as the 570 ―classification‖ of the space. Several systems have been promulgated 571 for the classification of space; however there is not consensus between 572 international regulators on a single best standard for classification. 573 To bridge the gap between the various standards, this guide provides 574 the following reference to be used across facility types requiring air 575 classification, (primarily facilities for sterile/aseptic manufacture 576 and for controlled bioburden processing, such as bulk 577 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 15 biopharmaceuticals). It should not be used for other facilities, such 578 as bulk chemical intermediates or oral dosage finishing. See the 579 appropriate Baseline Guide for specific air quality information. 580 581 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 16 582 REFERENCE DESCRIPTION CLASSIFICATION ISPE STERILE BASELINE GUIDE Draft 2008 ENVIRONMENTAL CLASSIFICATION GRADE 5 GRADE 7 GRADE 8 Controlled Not Classified with local monitoring Controlled Not Classified European Commission EU GMP, Annex 1, Volume lV, Manufacture of Sterile Medicinal Products (1997) also PIC/S GMP Annex 1 2002 Descriptive Grade A (Note1) B C D Not defined At Res t (No te 2) Maximum no. particles permitted per m3 ≥ the stated size 0.5μ 3 500 3 500 350 000 3 500 000 - 5μ 1 1 2 000 20 000 - In Ope rat ion Maximum no. particles permitted per m3 ≥ the stated size 0.5μ 3 500 (Note 3) 350 000 3 500 000 Not stated - 5μ 1 2 000 20 000 Not stated - Maximum permitted number of viable organisms cfu / m3 < 1 < 10 < 100 < 200 - FDA, October 2004, Guidance for Industry Sterile Drug Products Produced by In Ope rat ion Maximum particl es permitt ed stated size no. ≥ the 0.5 μ ISO 5 Class 100 ISO 7 (Class 10 000) ISO 8 (Class 100 000) - - 583 Table 2-2 Comparison of Classified Spaces 584 585 586 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 17 587 Pharmaceutical HVAC can help control contaminants within a space, but 588 these facilities must be designed with several additional features that 589 contribute to this mission of limiting the migration of contaminants. 590 591 2.3.6 Total Airflow Volume and Ventilation Rate 592 593 Much has been made of the importance of ―air change rate‖ (volume of 594 air/hour ’ room volume) or ―ventilation rate‖, the number of times in 595 an hour that the air volume of a room is replaced. Little is said about 596 the relationship between these rates and the classification of the 597 space, recovery rates and the more important issue of total volume of 598 ventilation. 599 600 When considering the design of classified space, designers will often 601 first consider the requirement for 20 Air Changes/hour (AC/hr), 602 expressed in the 1987 FDA Sterile Guide. In lieu of calculating the 603 airflow required by the process, many will default to ―rules of thumb‖ 604 for ventilation rate by the class of space, typically in the ranges: 605 606 15-20 AC/hr for Controlled, Not Classified (CNC) spaces 607 20-40 AC/hr for Grade 8 (EU Grade C) 608 40-60 AC/hr for Grade 7 (EU Grade B) 609 300-600 AC/hr for Grade 5 (EU Grade A) 610 611 As seen below, theserules of thumb may be overkill, or may prove to be 612 insufficient. The airborne particle levels depend more on a number of 613 factors. 614 615 2.3.6.1 Air change or Air Flow? 616 617 These air change rates often drive decisions regarding room size and 618 airflows, and can have significant cost implications, but do not 619 relate directly to the particle count in the room. Air change rates are 620 related to the room‘s ability to recover from an upset, not the room 621 classification – as is commonly assumed. To explain this difference: 622 623 Assume a 1 cubic foot volume with a process inside it that generates 624 10,000 particles per minute. If we purge the volume with 1 cubic foot 625 per minute of clean air, the steady state (equilibrium) airborne 626 particle level will be 10,000 particle per cubic foot (see the Appendix 627 for equations). This 1 CFM creates an air change every minute, or 60 628 air changes per hour. This value (60/hr) is often assumed to be more 629 than enough to keep a space well below 10,000 particles per cubic foot 630 (PCF). 631 632 Now put the same process into a 100 cubic foot volume and keep the 633 airflow at 1 cfm, assuming good mixing inside the room. Now the room 634 sees an air change every 100 minutes, or about 0.67 ac/hr. Yet, when we 635 calculate the dilution, the equilibrium airborne particle counts are 636 still 10,000 PCF (10,000 particles per minute divided by 1 cubic foot 637 per minute = 100 particles per cubic foot). If we would supply 1 air 638 change per hour (100 CFM) of clean air, the room airborne counts drop 639 to 100 PCF !!! So it‘s not air changes that determine airborne particle 640 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 18 counts, but three factors (referring to the Appendix): 641 642 1. Particles generated inside the space 643 2. Quantity of dilution air supplied to the space (cubic volume 644 per time) 645 3. Cleanliness of dilution air (assumed to be negligible in 646 pharma due to HEPA filtration) 647 648 As is demonstrated elsewhere, a room receiving only 1 air change per 649 hour will take hours to ―recover‖ from in-use to at-rest conditions. 650 With clean air supply of 20 air changes per hour, a 100-fold recovery 651 in particle levels can happen in less than 20 minutes (see the ISPE 652 Sterile Baseline Guide). So when it comes to RECOVERY, air changes ARE 653 important, 20/hr often being the minimum for classified spaces. 654 655 Although the layman is conscious of the importance of ―air change rate‖ 656 (more properly called ―ventilation rate‖) successful pharmaceutical 657 HVAC design can be attributed to proper filtration and attention to the 658 physical geometry of airflow in a space. 659 660 2.3.6.2 Impact of UDF (UFH) hoods on air change rates 661 662 Later sections will discuss ―mixed flow‖ rooms with clean air supplied 663 at the ceiling through terminal filters as well as clean air being 664 introduced to the room from Unidirectional Flow Hoods (UFH or UDF, once 665 called ―Laminar Flow‖) operating inside the room. Since air leaving the 666 space served by the hood is often orders of magnitude cleaner than the 667 room it leaks into, the relatively clean hood air serves to dilute 668 airborne particles in the room, along with the supply air from the 669 HVAC. In many respects the added flow from the hood not only reduces 670 airborne particles in its path, but can also accelerate the recovery 671 time of the room from in-use to at-rest conditions. The entire flow 672 from the hood will likely not be available to add into air change 673 calculations, however, due to: 674 675 Short circuiting of the hood air back to the hood inlet. Only areas 676 near the airflow path will see the added dilution. 677 Hood air is not as clean as HVAC supply air. Even though the hood 678 might be rated as Grade 5 (class 100) the air leaving the work space 679 has collected additional contaminants from equipment and people 680 outside the critical zone. 681 682 2.3.7 Room Distribution and Quality of incoming air 683 684 The layout of inlets and outlets with relation to the sources of 685 contamination and accommodation for expected obstructions are key to 686 controlling contamination and yielding effective HVAC design. The 687 relationship between these factors is expressed in the ―effective 688 ventilation rate‖ for a space. This measure recognizes that good layout 689 and filtration can produce desired airborne particulate levels and 690 recovery rates at lower than expected air change rates. 691 692 Taking the example above, good air mixing (dilution) and faster 693 recovery can be accomplished in a room where clean air supply is 694 distributed over a high percentage of the ceiling and not just from one 695 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 19 air outlet. Although it‘s not necessary to create a ―laminar flow 696 ceiling‖, numerous air outlets equally spaced with equal flow rates can 697 create a ―plug flow‖ for faster recovery (often less than 10 minutes 698 for 20 ac/hr) and also prevent ―hot spots‖ of high particle count in 699 the room. 700 701 2.3.8 Airflow Direction and Pressurization 702 703 Since constructing a space that is totally airtight is not practical is 704 normal construction, other means must be provided to assure that 705 particulate can be prevented from migrating into or out of a space. 706 Assuring that air is always flowing in the desired direction through 707 the cracks in building construction (door gaps, wall penetrations, 708 conduits, etc.) can influence contamination through the transport of 709 airborne particulates. A velocity of 1-200 FPM will contain light 710 powders and bioburden 711 712 One method to control this direction of airflow is by controlling the 713 relative pressurization of adjacent spaces or the Differential Pressure 714 (DP) between the spaces. 715 716 A simplified method (neglecting the orifice coefficient for the 717 opening) to calculate the expected velocity of airflow from a given 718 pressure is: 719 720 V = 4005 (sqrt VP) or VP =(V/4005) (where V is velocity in ft/min, 721 VP is pressure difference in inches w.g., A is area of the opening 722 in square feet, Q is airflow in CFM) 723 724 – We can breakdown velocity as being volume divided by area, giving 725 V = Q/A, or 726 727 VP = (CFM/4005A) 2 728 729 – Assuming room DP converts fully to Velocity Pressure thru an 730 opening (a conservative assumption), calculating the opening area, 731 such as the crack area around a closed door between rooms, allows 732 calculation of the airflow (CFM) required to create a pressure, or 733 the velocity that results from a known DP. 734 735 – For A=1 sq foot (0.1 sq.M) opening, 890 CFM (about 1500 CuM/hr or 736 0.45 CuM/sec) will create 0.05" w.g. (12.5 Pa) differential 737 pressure (V = Q/A = 890 FPM = 4.5 M/s) 738 739 2.4 PSYCHROMETRICS 740 741 2.4.1 Introduction 742 743 Psychrometrics is the science that involves the properties of moist air 744 (a mixture of dry air and water vapor) and the process in which the 745 temperature and/or the water vapor content of the mixture are changed. 746 Psychrometrics – ―psychro‖ means moisture and ―metrics‖ means to 747 measure. A psychrometric chart is used to identify conditions of air 748 and to illustrate the process of achieving the desired state of the 749 controlled space. An in-depth knowledge of psychrometrics is impossible 750 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 20 to impart in this document; the reader is referred to other sources 751 such as the ASHRAE Fundamentals Handbook. 752 753 2.4.2 Basic Propertiesof Air 754 755 2.4.2.1 Dry air is comprised of 78.1% nitrogen, 21% oxygen, and has 756 trace amounts of ten additional elements totaling 0.9%. The air around 757 us is a mixture of dry air and water vapor. When this moist air 758 reaches a level at which it can not hold any more moisture, it is said 759 to be, ―saturated‖. The colder the air, the less moisture which can be 760 held in the air while warmer air can hold larger quantities of moisture 761 in the air. 762 763 2.4.2.2 The moisture in dry air (its specific humidity) is measured in 764 grains of moisture per pound of air (7,000 grains equal 1 pound). Air 765 at 75°F and 60% RH has a specific humidity of 78 grains of water per 766 pound (7000 grains) of dry air. Therefore, one pound of this air 767 contains 77 grains of water and 6923 grains of dry air. 768 769 2.4.2.3 A psychrometric chart provides an overview of thermodynamic 770 properties of air-water mixtures, and shows the relationships of air at 771 different conditions. If any two properties of the air mixture are 772 known, the chart allows an engineer to determine all its other 773 properties. Air-water vapor mixtures have interrelated psychrometric 774 properties that can be plotted on a psychrometric chart. (See Appendix 775 for psychrometric chart discussion). 776 777 2.4.2.4 Sensible heat causes a change in the temperature of a 778 substance. Sensible heat can be ―sensed‖ or felt and quantified by 779 measurement with a dry bulb thermometer. Addition or removal of 780 sensible heat will cause the measured temperature to rise or fall. 781 Sensible heat shows on the psychrometric chart as a horizontal line; 782 there is no resulting change in the amount of water vapor in the air. 783 784 2.4.2.5 Latent Heat comes from the Latin word meaning ―hidden‖. 785 Changes in latent heat are neither ―sensed‖ or felt; however they will 786 cause a change of state in the substance. Latent heat is the heat 787 required to evaporate the moisture which the air contains. 788 789 For example, if sufficient latent heat is added to water in the liquid 790 state, it will change state into a vapor or steam. The change of state 791 from a liquid to steam is called the ―latent heat of vaporization‖ and 792 from a steam to a liquid is called ―the latent heat of condensation‖. 793 The change of state from a liquid to a solid is called ―the latent heat 794 of fusion‖ and from a solid to liquid the ―latent heat of melting‖. 795 Latent heat appears on the psychrometric chart as a vertical line. 796 797 2.4.3 Psychrometric Properties of Air 798 799 See the Appendix for a discussion of the terms used in Psychrometrics 800 and for an explanation of the Psychrometric Chart. 801 802 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 21 Dry-bulb temperature tDB Specific enthalpy h Wet-bulb temperature tWB Specific volume v Dew-point temperature tDP Humidity ratio W Relative humidity RH Water vapor pressure p WV Barometric pressure PBAR Measurable Psychrometric Properties Calculable Psychrometric Properties 803 Table 2-3 Psychrometric Terminology 804 805 2.5 EQUIPMENT 806 807 2.5.1 Introduction 808 809 Each piece of HVAC equipment helps contribute to sustaining the user 810 requirements for room environmental conditions. HVAC equipment serving 811 GMP areas are intended to work in conjunction with associated controls 812 and sequences of operation systems to: 813 814 Maintain room temperature 815 Maintain room pressurization and differential pressure cascades 816 Provide make up air for ventilation and room pressurization 817 Condition the air stream to remove and/or add moisture content of 818 the air 819 Minimize airborne contamination to the condition space 820 Provide required air change rates to maintain room cleanliness 821 classification when required 822 823 The following major components of an HVAC system for GMP spaces are 824 discussed in more depth in Chapter 6. 825 826 2.5.2 Air Handling Unit (Ahu) 827 828 An equipment package that includes a fan or blower, heating and/or 829 cooling coils, air filtration, etc. for providing heating, ventilation, 830 and air conditioning (HVAC) to a building. 831 832 2.5.3 Fan 833 834 An electrically driven air moving device used to supply, return or 835 exhaust/extract air to or from a room through ductwork to generate air 836 in sufficient amounts to provide ventilation, heating, cooling or to 837 overcome air pressure losses. 838 839 2.5.4 Fume Exhaust/Extraction System 840 841 A system made up of ductwork, fans and possibly filters that discharges 842 unwanted air outside into the atmosphere to a safe distance from 843 buildings and people. 844 845 2.5.5 Heating Coil 846 847 A heat transfer device consisting of a coil of piping which increases 848 the sensible heat into an air stream, using steam or hot water or 849 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 22 glycol as the heating medium. And electric air-heating element can also 850 be called a ―heating coil‖. 851 852 2.5.6 Cooling Coil 853 854 A heat transfer device consisting of a coil of piping, which reduces 855 the sensible heat and possibly latent heat (via condensation of water 856 vapor) from the airstream using chilled liquid or refrigeration as the 857 cooling medium. 858 859 2.5.7 Humidifier 860 861 A device to increase the humidity within a controlled space by means of 862 the discharge of water vapor into the supply air stream or directly 863 into the room. 864 865 2.5.8 Dehumidifier 866 867 A special device that removes water vapor from the air to reduce 868 humidity. 869 870 2.5.9 Air Filtration 871 872 Devices to remove particulate material from an airstream by means of 873 various media types. 874 875 2.5.10 Ductwork 876 877 A network of air conduits distributed throughout a building, connected 878 to a fan to supply, return or exhaust/extract air to or from zones in a 879 building. 880 881 2.5.11 Damper And Louver 882 883 2.5.11.1 Found in ductwork, a damper consists of a movable plate(or 884 numerous plates), plunger, or bladder that opens and closes to 885 regulate airflow. Dampers are used to regulate airflow to certain 886 rooms. 887 888 2.5.11.2 A louver is an assembly of sloping vanes intended to permit 889 air to pass through and to inhibit transfer of water droplets from 890 outdoors into air systems. A louver may also be found in return air 891 ductwork at room interfaces. 892 893 2.5.12 Diffuser And Register 894 895 Air distribution outlet or grille designed to introduce air to a space 896 using direct airflow in desired patterns. Air diffusers are usually 897 located to distribute the air as uniformly as possible through out a 898 space. 899 900 2.5.13 Ultraviolet (UV) Light 901 902 A UV light uses precise ultraviolet light wavelength to destroy 903 microorganisms. 904 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 23 905 Equipment H e a t i n g C o o l i n g H u m i d i f i c a t i o n D e h u m i d i f i c a t i o n R o o m S t a t i c P r e s s u r e A i r f l o w A i r Q u a l i t y Air Handler X X X X X X Fan X X Fume Exhaust/Extract Systems X X Heating Coil X Cooling Coil X X Air Filter X Humidifier X Dehumidifier X Ductwork X X Damper & Louver X X Diffuser & Register X UV Light X 906 TABLE 2-4 System components and their primary function relating to 907 environmental parameters 908 909 2.6 HVAC SYSTEM CONFIGURATION 910 911 2.6.1 Introduction 912 913 This section gives a brief overview ofthe key factors to consider, the 914 options available to an HVAC system designer, and the factors 915 influencing the decision to choose a particular system type. 916 917 This section should be read in conjunction with section 4 ―HVAC 918 APPLICATIONS BY PROCESS AND CLASSIFICATION‖. 919 920 One question to answer is ‗how many Air Handling Units should be used‘? 921 922 It is common practice to divide a manufacturing area into zones, and 923 use a separate Air Handling Unit per zone – a zone in general Building 924 Services design would be an area with similar heat gains and losses, a 925 similar approach is used within the pharmaceutical industry – and is 926 usually considered as an area with one type of manufacturing process or 927 area classification, e.g. a tablet compression suite or all Grade 7 928 areas, as the area requirements will be similar. Other factors that are 929 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 24 considered when dividing a facility into zones include: 930 931 Use of multiple units improves reliability of the area – it would be 932 unusual for all of the units to fail. 933 The use of multiple smaller units might make air balancing easier 934 The use of multiple smaller units means that the main distribution 935 ducts are smaller, making then easier to route in small ceiling 936 voids. 937 It is easier to make modifications to parts of the facility in 938 future and upgrade a small unit than change a large single unit 939 Use of multiple units allows for easier separation of areas within a 940 multi-product concurrent manufacturing plant. 941 942 The decisions regarding AHU system zoning are very important as a 943 factor in subsequent facility commissioning, qualification and related 944 documentation. 945 946 2.6.2 Basic System Types 947 948 There are three basic categories of HVAC system; 949 950 2.6.2.1 Once through - uses treated outside air to provide the design 951 internal conditions, this air is then extracted from the space and 952 discarded. 953 954 Air Handler Unit (AHU) Room Outdoor air Supply air Exhaust Infiltration Exfiltration 955 956 Figure 2-2 Once-through HVAC 957 958 Advantages of this system: 959 960 This system provides an abundance of O2 rich fresh air to dilute 961 contaminants 962 The system can handle hazardous materials, though the extracted air 963 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 25 may need treatment before it is discarded. 964 Lower risk of cross contamination of products from another room via 965 HVAC 966 Exhaust fan may be located remote from the AHU making duct routing 967 simpler 968 As there are less concerns about the ductwork noise in the extract 969 ductwork, it can usually be sized for a high velocity, making it 970 easier to route as high velocity = smaller diameter 971 972 Disadvantages of this system: 973 974 More expensive to operate than an equivalent recirculating system, 975 especially when cooling and heating. 976 Filter loading very high = frequent replacement 977 Potential need for exhaust air treatment (scrubbers, dust 978 collectors, filters) 979 Room conditions more difficult to maintain 980 981 2.6.2.2 Recirculating systems - This category is much more common – the 982 room supply air is made up of a percentage of treated outside air mixed 983 with some of the air extracted from the space. A percentage of the air 984 is either discarded or lost through leakage to adjacent areas, due to 985 local area pressurization. 986 987 Air Handler Unit (AHU) Room Makeup (Fresh) air Return air Supply air Exfiltration Infiltration Possible extract 988 989 Figure 2-3 Recirculated HVAC 990 991 Advantages of this system: 992 993 Usually less air filter loading = lower filter maintenance and lower 994 cost opportunity for higher grade air filtration 995 Lower energy cost than once through 996 Less challenge to HVAC means that it is simpler to obtain better 997 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 26 control of parameters (T, RH, etc) 998 999 Disadvantages of this system: 1000 1001 Return air ductwork routing to air handler may complicate above 1002 ceiling 1003 Chance of cross contamination via HVAC = Requires adequate supply 1004 air filtration (and sometimes return air filtration to prevent 1005 contamination of the air handler) 1006 Chance of recirculation of odors and vapors and of inadequate fresh 1007 air supply 1008 1009 2.6.2.3 Exhaust (Extract) system – sometimes a stand-alone system that 1010 removes airborne contaminants, either solid particles or gasses/vapors. 1011 It may be interlinked to a once-through or recirculated air supply 1012 system. Used alone, the extract/exhaust system will create a negative 1013 differential pressure in the room or enclosure it serves 1014 1015 "Space" with airborne contaminants Space may be a room, a glovebox or an exhaust hood Fan Air cleaner Stack (follow 1.3x rule of thumb if "foul air"… see ASHRAE) Ductwork Infiltration duct leakage Exfiltration duct leakage 1016 1017 Figure 2-4 Exhaust System 1018 1019 Advantages of this system: 1020 1021 Simple to operate. Makeup air is pulled from surrounding spaces. 1022 1023 Disadvantages of this system: 1024 1025 If used to capture large quantities of contaminants, such as from 1026 open processes, a large energy cost will be associated with 1027 conditioned air being thrown away (see once-through system above). 1028 1029 2.6.2.1 Use of Air Handling Units in parallel or series 1030 1031 It is possible to put units in series, for example if a higher air 1032 pressure is required to offset the pressure drop through HEPA filters 1033 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 27 in one area served by an HVAC system. 1034 1035 The use of parallel units is common practice where large areas are 1036 being conditioned, for example warehouses and large research 1037 laboratories, where this approach may make it possible to maintain 1038 acceptable conditions in the area should one unit fail. When 1039 configuring units in parallel, care must be taken to assure that the 1040 fans can be isolated and started independently. Automatic isolation 1041 dampers and variable fan drives assist in managing these factors. 1042 1043 2.6.2.2 Configurations and combinations 1044 1045 The basic components and concepts outlined above can be assembled in an 1046 infinite variety of ways. Shown below are a few examples of design 1047 concepts commonly used. 1048 1049 (Note: Add some basic block diagram schematics to illustrate these 1050 combinations.) 1051 1052 2.6.3 Air Handling Unit Configurations 1053 1054 There are two basic types of AHU configuration – blow through or draw 1055 through. The term describes the relationship of the fan to the coils in 1056 the air handling unit. The two approaches have distinctive 1057 characteristics; 1058 1059 2.6.3.1 Blow through units 1060 1061 Air is drawn into the unit, typically through a set of pre-filters used 1062 to reduce the dirt load on the (usually more expensive) final filters, 1063 and to prevent build up of dirt onto the heating and cooling coils, 1064 which would quickly reduce their efficiency. 1065 1066 One advantage of this type of unit is that it allows the AHU discharge 1067 temperature to be at the cooling coil discharge air temperature, 1068 because the fan heat is removed in the cooling coil. This is 1069 particularly useful when heat loads are particularly high and supply 1070 air temperature must be as cold as possible. It is not advisable to 1071 followa blow through unit immediately with a set of HEPA filters 1072 unless special precautions are included to prevent moisture carryover 1073 from the cooling coil. Another advantage is that if the drain trap on 1074 the cooling coil runs dry, then air will blow out through the trap – 1075 wasting a small amount of treated air. 1076 1077 The disadvantage - the unit typically needs to be longer to allow a 1078 diffuser to be installed after the fan to ensure that the airflow is 1079 spread over the entire coil area, and not concentrated on the middle, 1080 which would cause a drop in system performance. 1081 1082 2.6.3.2 Draw through units 1083 1084 These units are typically arranged with the pre-filters and coils 1085 before the fan. The advantage of this is that the unit is often 1086 smaller, and the motor and fan provide a small amount of reheat 1087 (usually 1-2 degrees F) to the air coming off the cooling coil. This 1088 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 28 lowers the RH of the air and prevents the problems with wetting final 1089 AHU HEPA filter banks. One precaution with draw through units is that 1090 if the drain trap is dry, then untreated air can be drawn into the unit 1091 through the trap, with only the final filter to protect the conditioned 1092 environment. The design must include provisions for maintaining a 1093 wetted drain trap, which can be several inches in height. 1094 1095 2.6.3.3 Air Handling Unit Design variations 1096 1097 A design variation worth considering is the use of a face and bypass 1098 damper – the concept is shown below – a portion of the air passing 1099 through the AHU is redirected through a treatment stage, with the 1100 volume altered to vary the condition of the resulting output air. This 1101 is a useful concept to use to gain improved accuracy, particularly if 1102 the treatment process is not easily controllable – e.g. chemical 1103 desiccant dehumidification. 1104 1105 Dehumidifier _ 1106 1107 Figure 2-5 Face and bypass control with a packaged dehumidifier and 1108 cooling coil (-) 1109 1110 A similar concept is often employed in the first mixing box of the AHU 1111 when enthalpy control is used – in all cases careful sizing of the 1112 dampers, to ensure adequate velocity for control, is necessary to 1113 obtain proper operation of these systems, maintaining constant system 1114 volume as the proportions of the air streams are varied. 1115 1116 2.6.3.4 Air Handling Unit Components 1117 1118 Numerous design options are possible within the 2 basic types. Here 1119 will establish a lexicon of design components, or modules, that can be 1120 assembled into an AHU design and discuss the motivations that drive the 1121 selection of each. To illustrate the possible options, the following 1122 demonstration uses a draw-through, Recirculating AHU: 1123 1124 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 29 Mixing Box Humidifier Dehumidifier Reheating Coil Supply Fan Energy Recovery Coil 1125 1126 Figure 2-6 Air Handler Unit Components 1127 1128 Return Fan 1129 1130 Most recirculating air systems will utilize a return fan. This fan 1131 allows return pressure and flow to be managed independently from the 1132 supply. This is particularly important if the downstream system has 1133 volume control boxes on both the supply and return. It also allows the 1134 return air to be diverted to exhaust when outside air conditions are 1135 closer to desired discharge conditions than return air. This function 1136 is referred to as an ―economizer‖ and is generally employed in offices 1137 or other spaces that are not pressure controlled. 1138 1139 Mixing Box 1140 1141 This pieced of equipment is also common in recirculating air systems. 1142 The return air can be directed to exhaust or to recirculate, it is then 1143 mixed with outside air for pressurization and/or ventilation. The 1144 resulting air stream is referred to as ―mixed air‖. In very cold 1145 environments the mixed air may be subjected to a turbulence inducing 1146 device to assure thorough mixing and avoid stratification. 1147 1148 Prefilter or Prefilter and Intermediate Filter 1149 1150 Filters are typically provided upstream of coils in an air handler to 1151 protect the coils from fouling with dirt or debris. The system 1152 typically employs a low efficiency ―dust stop‖ (MERV 7) filter followed 1153 by a medium or high efficiency intermediate filter (MERV 7-14). 1154 1155 Energy Recovery Coil 1156 1157 Once through air systems, or other systems with high amounts of exhaust 1158 may employ an energy recovery coil to return a portion of the energy 1159 employed in conditioning the exhausted air to the incoming air. These 1160 coils are typically upstream of all other coils and may be placed 1161 upstream of the filters if used to melt snow in cold climates. These 1162 systems may also employ a bypass damper to decrease pressure drop 1163 across the coil when energy recovery is not advantageous. 1164 1165 Preheat Coil 1166 1167 Once through air systems, or other systems with high amounts of outside 1168 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 30 air in cold climates may employ a preheat coil to condition the 1169 incoming or mixed air. These coils are always upstream of cooling 1170 coils, to protect them from freezing and may be placed upstream of the 1171 filters if used to melt snow in cold climates. These coils do not 1172 typically impose a large pressure drop, so a bypass damper is not 1173 common. 1174 1175 Humidifier 1176 1177 Once through air systems, or other systems with high amounts of outside 1178 air in cold climates may employ a humidifier to inject water vapor to 1179 condition the incoming or mixed air. These devices are typically 1180 downstream of the heating coil and may even be mounted in ductwork 1181 where turbulence and high velocity promote absorption of water vapor. 1182 When employed in an AHU, mounting upstream of cooling coils provides a 1183 natural baffle to prevent carryover of liquid water droplets. 1184 1185 Cooling Coil 1186 1187 Cooling to maintain environmental conditions is common, if not always 1188 required in Pharmaceutical applications. These coils can eliminate both 1189 sensible and latent heat and can be upstream or downstream of the fan. 1190 If latent cooling is expected drainage of these coils is a key design 1191 issue and mist eliminators may be employed to eliminate carryover of 1192 liquid water droplets that condense on the coil. These coils do impose 1193 a large pressure drop so a bypass damper can be employed, but can pose 1194 a risk of unconditioned air leakage and non-attainment of humidity 1195 goals. 1196 1197 Dehumidifier 1198 1199 Dehumidifiers employ a chemical desiccant to remove moisture from the 1200 supply air stream when humidity below 30-40% is required. The 1201 dehumidifier is often located downstream of the cooling coil as they 1202 work most efficiently when airstream relative humidity is high (but 1203 within desired limits). However care must be taken to assure that 1204 excessive relative humidity or liquid water droplets do not damage the 1205 dehumidifier. The choice of desiccant may vary, depending on the 1206 application but all desiccants are regenerated using heat; therefore, 1207 air leaving the dehumidifier is both dryer and hotter than upon 1208 entering. 1209 1210 Recool Coil 1211 1212 These coils are only commonly installed downstream of dehumidifiers to 1213 eliminate sensible heat from the supply air. They are also employed 1214 downstream of cooling coils to provide additional latent heat removal.1215 In this second application they operate below chilled water temperature 1216 and are typically filled with refrigerant or a low temperature brine of 1217 water and glycol (ethylene or propylene). If latent cooling is expected 1218 drainage of these coils is a key design issue and mist eliminators may 1219 be employed to eliminate carryover of liquid water droplets that 1220 condense on the coil. These coils do not typically impose a large 1221 pressure drop so a bypass damper would be unusual. 1222 1223 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 31 Reheat Coil 1224 1225 Systems that require over-cooling to achieve humidity control (in lieu 1226 of dehumidification) may also employ a preheat coil to condition the 1227 air leaving the cooling coil. These coils are always downstream of 1228 cooling coils, to increase the discharge temperature of the air handler 1229 and avoid condensation in the ductwork or overcooling of the space. 1230 1231 Supply Fan 1232 1233 All air systems will utilize a supply fan. This fan provides the motive 1234 force for distribution of air throughout the air handling system. 1235 1236 Final Filter 1237 1238 Filters may be provided as the last treatment step in an air handler. 1239 These filters provide assurance of air quality (with reference to 1240 particulate) downstream of all air handling operations and are 1241 particularly valuable in protecting terminal filters from fouling with 1242 dirt or debris and in providing filtration for classified spaces. This 1243 is of particular interest in systems that employ fan drive belts which 1244 shed particulate into the airstream. Systems typically employs a high 1245 efficiency filter in this location (MER V 14+). 1246 1247 2.6.4 AIRLOCK STRATEGIES 1248 1249 2.6.4.1 PRESSURIZATION 1250 1251 Airlocks are usually interposed between areas if airflow between the 1252 spaces needs to be controlled when they are entered or exited. 1253 Airlocks may also serve as material transfer / decontamination rooms, 1254 and gown or degown rooms. Three types of airlock pressure arrangements 1255 are indicated below: 1256 1257 Airlock "Cascade" "Sink" AirlockAirlock "Bubble" 1258 1259 Figure 2-7 Airlock configurations 1260 1261 The ―cascade‖ pressurization scheme should be used when there are area 1262 cleanliness classification requirements but no containment issues, or 1263 where there are containment issues but no cleanliness classification 1264 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 32 requirements. (i.e., cascade outward from the room for aseptic 1265 operations, but cascade into the room for hazardous compounds.) Doors 1266 are usually interlocked to allow only one to be open at a time. The 1267 normal differential from one air class to the next (ACROSS the airlock) 1268 is 10-15 Pa (0.04 to 0.06‖ w.g.). The pressure INSIDE the airlock is 1269 somewhere between the two classes, depending on which door is open. It 1270 is not necessary to have 10-15 Pa between a room and its airlock (see 1271 ―Not required‖ in the drawing below). 1272 1273 If there are requirements for both area cleanliness classification and 1274 product containment, then the use of pressure sinks and bubbles may be 1275 necessary. Pressure bubbles are usually used for ‗clean‘ operations 1276 (i.e., such as gowning or material entry airlock) and pressure sinks 1277 are usually used for ‗dirty‘ operations‘ (i.e., de-gowning material 1278 decontamination/exit airlock). Normal design pressure differential 1279 between classifications should be 0.06― w.g. (15 Pa) with the doors 1280 closed. Pressure differential will drop momentarily while one door is 1281 opened, but will not drop to zero (as it would with no airlock or if 1282 all airlock doors were opened). In no case should pressure differential 1283 reverse. 1284 1285 For unclassified areas the minimum suggested pressure differential is 1286 0.02‖ w.g. (5 Pa), being the minimum reliably detectable by current 1287 pressure sensor technologies. 1288 1289 The pressure differential is measured across the airlock, not across 1290 each door. 1291 1292 Airlock Airlock 0.06" w.g. Acceptable Not Required 0.06" w.g. 0.06" w.g. "Cascade" Pressure Relationships 1293 1294 Figure 2-8 Example of Cascade Pressure Relationships 1295 1296 When using the ―bubble‖ pressurization scheme, the normal design 1297 pressure target, with doors closed, between classifications should be 1298 0.06‖ w.g. (15 Pa). There may be different pressure drops across each 1299 door due to building tolerances, or adjacent room conditions, this is 1300 not considered a problem. If protecting non-sterile processing (areas 1301 not classified) a lower pressure is acceptable, but should be 1302 measurable. The pressure of the very clean airlock ‗bubble‘ is usually 1303 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 33 designed to be about 0.02 to 0.03 in. w.g (about 5-8 Pa) above the 1304 higher of the two room pressures. 1305 1306 The positive pressure airlock provides a robust means of segregating 1307 areas using positive airflow. 1308 1309 Bubble Airlock @ 0.09" w.g. "Bubble" Pressure Relationships 0.09" w.g. 0.03" w.g. Unclassified Space @ 0" w.g. Clean-Contained Space @ 0.06" w.g. 0.06" w.g. across GMP boundary 1310 1311 Figure 2-9 Example of “Bubble” pressure relationships 1312 1313 Similarly, with the ―sink‖ pressurization scheme, the normal design 1314 pressure between classifications should be 0.04 to 0.06‖ w.g. (10-15 1315 Pa) with doors closed. As with the ―bubble‖ there may be different 1316 pressure drops across each door. The pressure of the contaminated 1317 airlock ‗sink‘ is usually designed to be about 0.02 to 0.03 in. w.g (5-1318 8 Pa) below the lesser of the two room pressures. 1319 1320 Bubble Airlock @ (-) 0.03" w.g. "Sink" Pressure Relationships 0.03" w.g. 0.09" w.g. Unclassified Space @ 0" w.g. Clean-Contained Space @ 0.06" w.g. 0.06" w.g. across GMP boundary 1321 1322 Figure 2-10 Pressure “sink” relationships 1323 1324 It is often necessary to have pressure differentials at boundaries 1325 within the same air class area for operational reasons. The minimum 1326 operational differential between areas of the same classification 1327 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 34 (where required) is suggested to be 0.02― w.g. (5 Pa), with a design 1328 target of 0.04‖ (10Pa) suggested. It is also sometimes necessary to 1329 have directional air flows for operational reasons without a measurable 1330 pressure differential, such as may be found in non-classified areas, 1331 such as oral dosage manufacture. 1332 1333 Pressure may be maintained across doors between air classes when no 1334 airlocks are present. However, without the added protection provided by 1335 the airlock, significant airflow volumes and pressure actuated dampers 1336 are required. (See the Appendix) This scheme should be adopted only 1337 when airlocks are not possible. 1338 1339 The airflow leakage rate should be calculated for each room. This 1340 calculation must be based on the design pressure differential 1341 established in the project documents and not on some rule of thumb 1342 method, e.g., percentage of supply air. Door seals are the primary 1343 path of room air leakage. Therefore, doors and doorframes are crucial 1344 components of the facility construction, as more leakage air must be 1345 designed into the system for doors with poor seals. The HVAC design 1346 engineer should consult with the facility architect to assure 1347 specifications are adequate for pressurization requirements. Door 1348frames may include continuous seals which would reduce leakage required 1349 to maintain the desired pressure, as well as provide isolation in case 1350 of airflow failure. Doors may be provided with a provision for 1351 operable floor sweeps which drop down as the door closes, but these may 1352 present cleaning problems. Where double doors are used in the 1353 facility, gasketed astragals are required. Door grilles should be 1354 avoided unless part of a pressure scheme without airlocks (as discussed 1355 in the Appendix). Figure 14, Chapter 27 of the 2005 ASHRAE Handbook- 1356 Fundamentals should be used in calculating the air leakage rate of 1357 doors. Common practice is to design for a 0.10‖ average crack between 1358 the door and frame on sides, top, and bottom. Note that corrections 1359 are to be applied for design pressure differentials using the formula 1360 contained in Figure 14. A similar leakage calculation is discussed in 1361 the article, Airlocks for Biopharmaceutical Plants, del Valle, 1362 Pharmaceutical Engineering , Volume 21, Number 2, March/April 2001 1363 1364 Material transfer openings are another key room air leakage path. To 1365 calculate leakage through these and other fixed openings use the 1366 formula, 1367 1368 Q = A x 4005sqrt (VP) (―Sqrt‖ = square root) 1369 1370 Q = airflow (CFM) 1371 1372 A = area of opening (sq. ft.) 1373 1374 VP = velocity pressure— the velocity pressure at the opening (in. w.g.) 1375 is roughly the same as the differential pressure across the opening, 1376 (or the, room differential pressure), 1377 1378 This method provides a conservative leakage number. In most cases, a 1379 slightly smaller leakage airflow will produce the desired pressure 1380 differential for a given leakage path. Because of this, during 1381 commissioning there may be more return air leaving the room than 1382 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 35 designed, so return air dampers should have some extra capacity. 1383 1384 In some cases the calculated room leakage may exceed the minimum air 1385 change rate for small rooms such as airlocks. In these instances the 1386 total supply air to the space must match the calculated leakage. 1387 However, provisions should be made in the design for some return air 1388 from the space in case the actual leakage is less than calculated. A 1389 good rule-of-thumb is to size the return for half the supply air flow 1390 into the room. In applying this approach, care should be taken in 1391 sizing any volume control (damper or CV box) on the return air side to 1392 ensure that the actual flow rate is with the operable range of the 1393 control device. 1394 1395 For this reason it is a good engineering practice to put a tighter 1396 specification on the supply air volume, being more critical to maintain 1397 the room conditions, and a larger design range on the return, which 1398 will be whatever value is needed to maintain desired differential 1399 pressures. 1400 1401 Two methods of measurement are commonly applied to monitor room 1402 pressure relationships; room-to-room and common reference point. While 1403 both have been used successfully, the preferred is the common reference 1404 point method in order to minimize compounded error. Here, one port of 1405 the differential pressure transmitter (usually, but not always, the 1406 ―High‖ side) is piped to the room being monitored and the other side 1407 (usually, but not always, the ―Low‖ side) is piped to a common 1408 reference in the interstitial space. 1409 1410 PDT H L PDT H L Interstitial Space- common reference Space A Space B PDT H L PDT H L Space A Space B Space C Room-to-Room Monitoring Common Reference Monitoring 1411 1412 Figure 2-11 Differential Pressure Sensor Locations 1413 1414 The common reference point should not be outdoors, as the effect of 1415 wind direction may give unstable readings. Where room to room 1416 monitoring is used it is a good practice to confirm through the system 1417 balancing that net airflow into the facility is greater than the 1418 extract/exhaust. 1419 1420 All signals are sent to the control system where differentials are 1421 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 36 calculated by means of an algorithm. In the event that the reference 1422 (interstitial) space is partitioned by fire walls or other means, it 1423 may be necessary to provide multiple common reference points by 1424 building ―zone‖. In this case the pressure relationship across a 1425 ―zone‖ will need to be room-to-room or the use of two differential 1426 pressure transmitters, one to each reference point, will be required. 1427 1428 For information on monitoring system see section 2.7 Control and 1429 monitoring. 1430 1431 2.6.5 Ventilation/supply strategies 1432 1433 2.6.5.1 Room Air Distribution: 1434 1435 There are two basic types of room air distribution: dilution and 1436 displacement air distribution. 1437 1438 In a dilution design, room air is mixed continuously with supply air to 1439 help achieve uniform air temperatures within the space. In areas where 1440 temperature uniformity is the only factor, aspirating-type diffusers 1441 are used to allow turbulent mixing of room air with supply air. From a 1442 particulates perspective, dilution also mixes ―less clean‖ room air 1443 with the clean supply air. Aspirating-type diffusers are not acceptable 1444 in any of the clean classified rooms. Even though non-aspirating 1445 diffusers do not eliminate turbulent air patterns in the room, using 1446 non-aspirating diffusers in clean rooms reduces the mixing effect. The 1447 particulate level in the room can be reduced with dilution by 1448 increasing the air-change rate of clean air supply. Dilution 1449 distribution with non-aspirating diffusers (typically perforated face 1450 plate over the terminal HEPA media) is acceptable to clean classified 1451 areas up to ISPE-7. 1452 1453 In a displacement design, room particulates are displaced by clean 1454 terminal HEPA filtered unidirectional air. This design requires 1455 continuous HEPA coverage at the ceiling and properly sized and located 1456 low level return or exhaust grills. ISPE-Grade 5 should use 1457 displacement air distribution (typically a unidirectional flow hood – 1458 UFH). 1459 1460 2.6.5.2 Room Air Distribution options 1461 1462 Conventional air distribution techniques are generally acceptable for 1463 administrative, warehouse, and unclassified spaces. Large warehouse 1464 spaces, however, may see hot and cold spots with poor air distribution. 1465 GMP spaces and cleanrooms require more stringent methods. Supply air 1466 should be introduced at the ceiling level and return/exhaust air should 1467 be extracted near the floor. The use of non-aspirating diffusers on 1468 the face on terminal HEPA filters may improve airflow patterns. 1469 1470 Within mixed airflow rooms, airflow patterns should be from clean side 1471 of the space to the less clean. For example, within a space that 1472 contains an ISO 5 micro-environment/zone with an ISO 7 background, 1473 airflow should always be from the cleaner zone into the less clean 1474 background area. 1475 1476 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 37 Mixed Airflow GMP Space ISO Class 5 ISO Class 7 1477 1478 Figure 2-12 Mixed Airflow Space 1479 1480 Some process operations, i.e., centrifugation, are inherently particle 1481 generating. Airflow patterns within the spaces that contain these 1482 processes should take this into account by locating returns/exhausts at 1483 floor level near the particle generating operation. 14841485 Airlocks and gown rooms are usually divided, often by a physical line 1486 on the floor, into clean and ―dirty‖ zones in accordance with the flow 1487 of personnel, material, and equipment. Within such spaces, the air 1488 pattern should from the clean to the ―dirty‖ side of the airlock. 1489 Therefore, HEPA supplies should be located on the clean side and low 1490 wall returns should be located on the opposite side of the room. 1491 1492 Low wall returns should be located no more than 12‖ above the floor. 1493 Returns should be generously sized with a maximum grille face velocity 1494 of no more that 400 FPM. Ductwork should be sized for a maximum 1495 pressure drop or 0.1‖ per 100‘ or a maximum velocity of 850 FPM, 1496 whichever is more restrictive. The heel of the connecting elbow should 1497 have a minimum 6‖ radius to facilitate cleaning. The elbow and 1498 connecting ductwork, up to an elevation of 5 feet above the floor, 1499 should be Type 304 or 304L stainless steel. 1500 1501 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 38 6" Radius 1 '- 0 " m a x im u m Typical Low Wall Return 1502 1503 Figure 2-13 Typical Low Wall Return 1504 1505 Return air ducts located in stud wall spaces need not be insulated 1506 within the walls. Insulation shall terminate at the top of the wall. 1507 The mechanical engineer should consult with the facility Architect to 1508 assure that, where needed, wall cavities are adequate to contain low 1509 wall returns. 1510 1511 2.6.6 EXTRACT (EXHAUST AND / OR RETURN) STRATEGIES 1512 1513 Why we use low level or high level extract, the area affected by an 1514 extract point – do we want to cover dust extract systems at all here?? 1515 1516 2.6.7 DISTRIBUTION 1517 1518 Design concepts for ductwork distribution systems – equal velocity, 1519 static regain etc are covered in the ASHRAE Handbooks. Such 1520 calculations should be performed by only qualified HVAC professionals, 1521 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 39 who should be familiar with ASHRAE. 1522 1523 2.7 HVAC CONTROLS AND MONITORING 1524 1525 2.7.1 Introduction 1526 1527 This section will give a brief overview of the options available for 1528 controlling and monitoring HVAC systems and the environments that they 1529 provide, providing guidance on the points to consider when designing a 1530 new system or reviewing an existing installation. 1531 1532 An important early decision is to decide if the control system will 1533 also be the quality ―system of record‖ providing the alarms and 1534 recording that the environment is being maintained within the specified 1535 limits, or if there will be an independent system to do this, with the 1536 HVAC control system providing only ―engineering‖ information and 1537 alarms. 1538 1539 2.7.2 Controls 1540 1541 There are many types of equipment that can be used to control an HVAC 1542 system, each with advantages and disadvantages, three of the more 1543 common variations are described below; 1544 1545 2.7.2.1 Basic control system 1546 1547 A basic system may use packaged controllers (Packaged ―PID‖ units) for 1548 each of the controlled variables. There may be independent control 1549 units – e.g. temperature, humidity, or a single combined unit, with the 1550 sensors and controlled items – dampers, valves etc connected to the 1551 controller. The controller may also have the capability of providing 1552 alarms. 1553 1554 This option provides a low purchase and installation cost, control 1555 panels in a large installation can be standardized and complete panels 1556 held as spares. 1557 1558 However there is no ability to monitor the system performance, or 1559 analyze trends or component performance with this system, hence it is 1560 rarely used. A picture of a typical control unit is shown below. 1561 1562 1563 1564 Figure 2-14 Typical Single Loop Control (Courtesy of __________) 1565 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 40 1566 2.7.2.2 Building Management System (BMS) 1567 1568 The most common solution found in the industry is the BMS or BAS 1569 (Building Automation System) system. This is a proprietary packaged 1570 system typically comprising of a number of local independent control 1571 panels, field panels or outstations with the software / control logic 1572 installed – the panel may control one or several HVAC or other building 1573 systems. 1574 1575 This panel is then connected by a network cable to one or several 1576 ―supervisors‖ – computer terminals which allows a user to see the input 1577 and output signals, set up the system to record, and allow the user to 1578 review plant performance data and trends, change set points and have 1579 alarms reported / printed in a central location. 1580 1581 This type of system is more expensive, but brings additional capability 1582 allowing system performance to be monitored remotely, with adjustments 1583 made to set points from a central location if required - a hierarchy of 1584 alarms can also be easily set up. The large scale use of these systems 1585 has reduced the cost significantly. 1586 1587 Figure 2-15 – (to be added) 1588 1589 2.7.2.3 Fieldbus Systems 1590 1591 The ―next generation‖ BMS uses ―intelligent‖ sensors and valves 1592 connected via a network cable to the control system. 1593 1594 There are a number of industry standard communication protocols which 1595 mean that the owner is not tied to a single supplier, e.g. Hart or 1596 Foundation Fieldbus. 1597 1598 The software is held within the control system which communicates with 1599 the devices; the device can self diagnose faults, automated components 1600 can also self calibrate to the control signals. 1601 1602 This type of system is the most expensive to install, but should be 1603 more reliable, and simple to maintain as they are self checking. The 1604 cost typically limits the use of this type of system to process 1605 operations at present, but this may change as the costs reduce. 1606 1607 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 41 1608 1609 Figure 2-16 Field Bus system (courtesy of _________) 1610 1611 2.7.3 Actuation methods 1612 1613 There are two common means of actuating components – electrical and 1614 pneumatic. 1615 1616 2.7.3.1 Electrical/Electronic 1617 1618 The actuator will use a low voltage control signal, to control an 1619 electric motor, the units can be on off, or proportional 1620 1621 These systems are used where the speed of actuation can be slower, 1622 typical times for a valve to go from fully open to fully closed are in 1623 the range of 1-2 minutes. 1624 1625 Installation is simple, as all signals are by cable – e.g. control 1626 signal, power supply, and any feedback, such as valve position, or 1627 open/closed signals. 1628 1629 The actuators can be supplied as fail open, fail closed, or with a 1630 manual override facility. 1631 1632 2.7.3.2 Pneumatic 1633 1634 The control signal is used to vary the output pressure from a pneumatic 1635 controller, which is fed to a pneumatic actuator on the controlled 1636 component. 1637 1638 The system requires the use of an I/P (control signal to pneumatic) 1639 converter, with an instrument quality air supply, then local tubing to 1640 the actuator. In order to get the best response time the converter 1641 should be as close as possible to the actuator. Fully pneumatic 1642 controls are available but seldom used with large installations and 1643 BMS. 1644 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 42 1645 The units useair pressure one way, with an opposing spring to return 1646 the controlled item to the fail position. The system is naturally 1647 proportional control – i.e. the controlled item position is 1648 proportional to the control signal. 1649 1650 These units typically have a faster response time than an electric or 1651 electronic unit. The pneumatic system is also ideal for hazardous areas 1652 requiring intrinsically safe installations. 1653 1654 1655 1656 Figure 2-17 I/P transmitter 1657 1658 For HVAC applications response time is not usually critical, as the 1659 response time of the overall system is slow, e.g. if the full equipment 1660 heat load is added instantaneously, the room temperature will rise 1661 slowly, not instantaneously, similarly the rate of change of external 1662 conditions is typically slow. 1663 1664 2.7.4 Instrumentation 1665 1666 It is important to consider the requirements for the instrumentation to 1667 be used, in order to select the most cost effective type, and to define 1668 the appropriate calibration/verification regime. There is a lot of 1669 difference between domestic and commercial building type sensors and 1670 industrial type units, the latter being in general more reliable, and 1671 certainly more robust – for this reason on this grade of instrument 1672 should be considered. 1673 1674 For some instruments accuracy and repeatability are important, e.g. 1675 measuring room temperature, for others accuracy is not important, but 1676 repeatability is, e.g. measuring a system flow rate in order to 1677 maintain constant flow through the control of a variable speed fan. 1678 1679 Thus three point calibration may be required, or single point 1680 verification may be justifiable. 1681 1682 The parameters usually requiring monitoring include: 1683 1684 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 43 2.7.4.1 Airflow 1685 1686 Measurement of airflow is typically done to allow control of airflow in 1687 a system. For classified spaces, airflow should be kept constant to 1688 assure that particle counts, recovery, and room pressure are in 1689 control. 1690 1691 This may be done using a flow grid – The Grid consists of a row of 1692 tubes with closed ends, some of the tubes are perforated with small 1693 holes facing upstream sensing total pressure, while others have holes 1694 facing downstream to sense throat sub-static pressure the tubes are 1695 connected by manifolds with the distribution designed to compensate for 1696 non uniform flow profile in the duct . The difference in pressure 1697 signal between the two sets of tubes is proportional to the square of 1698 the mean velocity in the airway. By connecting the output tubes to a 1699 suitable instrument, the pressure difference and hence the volume flow 1700 rate can be easily measured. In order to get an accurate reading the 1701 installation should have straight duct runs equivalent 2-3 times the 1702 duct diameter upstream and downstream of the flow grid. 1703 1704 A similar grid system uses hot wire anemometer elements. Because flow 1705 sensing is not dependent on the square root of pressure, better 1706 accuracy at low flows is possible. 1707 1708 Another system gaining popularity is the fan venturi meter, either 1709 retrofitted to or an integral part of the system fan inlet (evase) – 1710 with the advantage of established accuracy. Its performance is 1711 independent of the ductwork design - hence is a useful commissioning 1712 aid. The wiring is all local to the fan/AHU, simplifying installation. 1713 1714 It should be noted that the usual function of the grid is not to get an 1715 accurate reading, but to maintain a preset reading determined during 1716 system commissioning, whether actual flow or not. Due to the square law 1717 operating principle, differential pressure flow measurements have a 1718 limited turndown capability. 1719 1720 For specialized applications such as the monitoring of unidirectional 1721 air flow protection devices (laminar flow hoods) hot wire anemometers 1722 are used. Vane anemometers are commonly used for commissioning as they 1723 tend to have an averaging affect over the fan area compared to the spot 1724 reading from the hot wire unit. 1725 1726 2.7.4.2 Flow control 1727 1728 The most common form of flow control is the damper – these can be 1729 manually adjusted, or actuated, use a single blade, or be multi blade 1730 parallel or opposed blade 1731 1732 These items are fairly basic, and the relationship between air flow and 1733 position is non linear improved control is available using devices 1734 such as a ―pneumatic‖ damper – this uses a bladder inflated with low 1735 pressure compressed air to open aerodynamically shaped blades. These 1736 provide more linear control with better pressure recovery and turndown. 1737 1738 1739 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 44 1740 1741 1742 Figure 2-18 Pneumatic (“Bladder”) dampers 1743 1744 Another device that may be used to provide better control is a variable 1745 orifice, such as the item shown below: 1746 1747 Figure 2-19 Variable Orifice (Venturi) Damper GRAPHIC MISSING 1748 1749 2.7.4.3 Control Valves 1750 1751 The correct selection of fluid (liquids or steam) control valve is 1752 critical for good system performance, together with tuning of the 1753 control loop. 1754 1755 There are two types of control valve; the three port valve, which can 1756 be used as a mixing or diverting valve to supply the controlled 1757 equipment, or the two port valve, which directly controls flow to the 1758 equipment. 1759 1760 The three port valve was once the industry standard , however the use 1761 of two port valves with variable flow rate systems is becoming far more 1762 common, as a well designed system is as effective, and has a lower 1763 capital and operating cost. 1764 1765 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 45 Correct valve selection is important for the correct operation of a 1766 system, a brief over view of the process follows, but for readers who 1767 require more information references are given in the references 1768 section. 1769 1770 Valve characteristic 1771 1772 The valve characteristic is the ratio of flow through the valve to the 1773 valve lift (opening) at a constant differential pressure. 1774 1775 There are three main types of valve characteristic: 1776 1777 1778 1779 Figure 2-20 Valve Characteristics (Courtesy of _____________) 1780 1781 These are shown graphically as in a globe valve; 1782 1783 The fast opening valve is typically used for on / off control. 1784 The Linear valve has a flow rate directly proportional to the amount 1785 it is open, and is commonly used for diverting applications in HVAC 1786 supplying water to heating or cooling coils.. 1787 The equal percentage valve is more commonly used in two port 1788 applications. 1789 1790 The characteristic should be chosen with respect to the application of 1791 the valve. The installed characteristic is the relationship between the 1792 flow and valve lift in the system where it is installed. Where the 1793 pressure drop across the valve decreases with increasing flow the EP 1794 valve will produce a more desirable linear characteristic. 1795 1796 Simple Flow coefficient calculation or Cv for liquids 1797 1798 Cv= design flowrate (gpm) x sqrt (Specific Gravity of the fluid/ 1799 Allowable pressure drop1) 1800 1 Calculation should be based on the allowable pressure drop to determine the CV needed. Selected valve should have that CV at 90% opening or less.ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 46 1801 Select a valve where the required Cv is in the 10-80% range of the 1802 stroke – use of a valve that is too small (typically less than half the 1803 line size) or too large (line size or greater) would be wrong – the 1804 valve will not have the ability to control the flow accurately, i.e. 1805 not have adequate authority. If the valve normal operating condition 1806 results in operation in a near closed condition control can be erratic, 1807 particularly if installed where flow tends to close the valve. 1808 1809 Valve Authority 1810 1811 This is defined as the percentage of total system pressure drop 1812 assigned to the valve, i.e. in a circulation system the pump will 1813 deliver some head to overcome pipe and heat exchanger losses and some 1814 to overcome valve resistance. If the latter is small in comparison to 1815 the former the valve will have less ability to control effectively. 1816 1817 Differential Pressure 1818 1819 There are three applications for the measurement of differential 1820 pressure: 1821 1822 The use of a differential pressure monitor to interpret the readings 1823 from a flow measuring device. 1824 The use of a pressure switch to detect: 1825 1826 Flow failure of a fan (not usually necessary if the system has flow 1827 monitoring) 1828 Detection of high pressure across a filter or filter set, to 1829 provide an indication that the filters require changing. 1830 The detection of low differential pressure between rooms to provide 1831 an indication of the incorrect airflow direction (non sterile 1832 areas), or failure of a design differential pressure (sterile 1833 areas). 1834 1835 2.7.4.4 Differential Pressure sensing/Indication 1836 1837 There are a number of options here; 1838 1839 One of the most basic instruments is the Magnehelic gauge, a robust 1840 device based on the measurement of the deflection of a metal diaphragm 1841 which provides a visual indication of differential pressure. This 1842 device is also available with a switch output, or a variable output. 1843 1844 An alternative is a simple device using a colored ball mounted in an 1845 inclined tube, as shown below – this type of unit operates from first 1846 principles, so does not require calibration, the disadvantage is that 1847 there is airflow through the unit, so it requires routine cleaning. 1848 1849 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 47 1850 1851 Figure 2-21 Visual DP indicator (courtesy of _____) 1852 1853 Where greater sensitivity is required, or a control function based on a 1854 differential pressure an electronic pressure transducer can be used – 1855 these are available with or without indicator LEDs to allow an operator 1856 to see if conditions are acceptable or not. The most sophisticated DP 1857 sensors are pressure diaphragms with an accuracy of +/- 0.005‖ (0.25 1858 Pa). Output is commonly 4-20 mA. 1859 1860 When specifying these units be careful to consider the operating 1861 pressure range, and ensure that the device is robust enough to handle 1862 the occasional pressure spike. 1863 1864 2.7.4.5 Temperature sensor 1865 1866 The almost universal industrial sensor used to monitor temperature is 1867 the resistance thermometer (RTD). Liquid and gas expansion systems are 1868 used for self acting controllers and switches. 100 Ohm RTDs with a 38.5 1869 Ohm fundamental interval are the industry standard and are available 1870 with different accuracy standards, some as accurate as ________. Some 1871 HVAC systems may utilize 1000 Ohm sensors of a lower accuracy. 1872 1873 2.7.4.6 Humidity sensor 1874 1875 It is far more common to monitor relative humidity, though there are 1876 applications where it may be advantageous to monitor absolute humidity, 1877 for example in a system used to supply multiple areas, each equipped 1878 with a local branch re-heater, so that the moisture reading is 1879 independent of the temperature (in the example given the supply 1880 temperature would be reset to minimize the use of the re-heaters, thus 1881 each change in supply temperature would require the supply RH to be 1882 reset, whereas the humidity would be constant). 1883 1884 The sensors used industrially to monitor relative humidity now are 1885 generally units which measure the change in capacitance between two 1886 plates due to the variation in humidity. Accuracy is in the range of 1887 __________. 1888 1889 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 48 2.7.5 Environmental Monitoring 1890 1891 2.7.4.1 It is a regulatory requirement to monitor critical process 1892 parameters. These vary depending on the product, but commonly include; 1893 1894 Temperature 1895 Humidity 1896 Air flow direction / area differential pressure (as it is difficult 1897 to monitor air flow, differential pressure is the parameter 1898 typically monitored) 1899 And may include particle monitoring for classified areas or for 1900 airborne hazardous particles for worker protection 1901 1902 Viable particles (CFU - Colony Forming Units) for classified spaces 1903 1904 It is now common practice in the industry to validate the monitoring 1905 system (sensors, transmitters, indicators, recorders, alarms) for those 1906 parameters defined as critical (usually in the process monitoring 1907 computer system), and use GEP to ensure the development and maintenance 1908 of a robust control system (via the HVAC control system). 1909 1910 This approach provides the quality organization with a record of the 1911 conditions from a validated system, without the need for cumbersome 1912 quality change control process on the control system (an engineering 1913 change control system is still required, which typically is less 1914 cumbersome, and less extensive in its scope – e.g. may not include all 1915 set points). 1916 1917 2.7.5.1 With any monitoring system the main factors to consider are: 1918 1919 Accuracy & repeatability required 1920 Long term stability & failure modes 1921 Sensor location / locations 1922 Alarm requirements 1923 Record requirements 1924 1925 2.7.5.2 Accuracy required 1926 1927 The accuracy of the monitoring system should be subtracted from the 1928 defined limits, in order to ensure that the product requirements are 1929 met – thus it is cost effective to use a reliable high accuracy sensor, 1930 allowing the maximum latitude for the control system. 1931 1932 For example if the conditions are 18 – 25 degrees C, and the monitoring 1933 system has an accuracy of ± 0.5 degrees, the space can be maintained 1934 within the limits 18.5 – 24.4 degrees C; if the monitoring sensor has 1935 an accuracy of ± 2 degrees C, then the conditions need to be maintained 1936 between 20 and 23 degrees C. 1937 1938 2.7.5.3 Long term stability and failure modes 1939 1940 2.7.5.4 Sensor location / locations 1941 1942 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 49 This is an area of great discussion, let us consider temperature and 1943 humidity (typically Relative Humidity – the most important thing to 1944 remember is that conditions are very rarely uniform throughout a room – 1945 see fundamentals of HVAC systems. 1946 1947 The traditional location for the monitoring sensor was in the common 1948 return air duct – this is still a good location, giving an average of 1949 the conditions in the space, assuming that the supply diffusers are 1950 doing a good job of mixing the supply with the room air. 1951 1952 It may be necessary to study the relationship between worst case 1953 conditions inthe room and the mixed condition in the return duct. 1954 1955 If there are any significant heat or humidity gains then the local 1956 conditions near the source will be different. 1957 1958 When considering sensor locations also consider the process as seen by 1959 the product – for example consider a typical tablet compression room; 1960 1961 The raw material sits in a hopper typically near a supply register, so 1962 that the area is flushed with clean air, it is then fed into the dies, 1963 where it is compressed – the process generating a significant amount of 1964 heat – the compressed tablet is then released into a de-duster/metal 1965 detector, into a collection bin, where it is cooling and exposed to the 1966 room conditions – due to the localized heat, the local RH will be 1967 lower. 1968 1969 As the equipment generates a significant amount of heat the air change 1970 rate is high – typically around 20 times per hour, to keep the supply 1971 air temperature differential reasonable – circa 0.5 degrees. 1972 1973 The most critical area is the feed hopper, which is covered by the 1974 supply air – thus in this instance it could be argued that this would 1975 be the location to monitor. 1976 1977 There are also a number of options to consider for Differential 1978 Pressure, it is common practice to measure across the doors of the 1979 airlock, though the requirement it maintain the difference between the 1980 rooms, as it is usually desirable to maintain a positive pressure in 1981 the manufacturing area where there is any risk of ingress of outside 1982 air, hence some may prefer to monitor the room pressure compared to an 1983 external reference point. 1984 1985 2.7.5.5 Alarm requirements 1986 1987 It is important to consider the desired response to an alarm state. 1988 Many alarms will provide early warning to the facility engineering 1989 staff of an unusual state requiring some attention or adjustment, but 1990 not indicating any transgression of required operating conditions. 1991 Other alarms often for the same variable at a worse condition may 1992 indicate that operating conditions have exceeded the specified states 1993 and production need to take action with the process to ensure product 1994 quality is not compromised. These alarms need to be relayed to the 1995 appropriate business unit. 1996 1997 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 50 The regulatory requirement is for a local alarm, notifying the operator 1998 when the conditions are outside the defined limits. 1999 2000 This may be by an audible and or visual indication – e.g. a horn and 2001 flashing light mounted in a common area of the production suite, where 2002 it can be seen or heard from the whole suite. 2003 2004 It is a good practice to set this action alarm at the extreme 2005 conditions, and have an engineering ―alert‖ alarm at conditions just 2006 outside the normal operating range, to alert the engineering staff of a 2007 potentially unusual condition as soon as possible, so that action may 2008 be taken to prevent an action alarm. 2009 2010 This engineering alarm may come from the validated monitoring system, 2011 or the GEP control system. 2012 2013 2.7.5.6 Record requirements 2014 2015 Every company has its own standards – it may be acceptable to just have 2016 a record of any alarms during manufacturing – or lack thereof! – 2017 recorded on the batch record sheet. 2018 2019 It may be preferred to have an actual record. 2020 2021 With current data logging systems this may be in the form of a 2022 continuous chart, or a daily printout of min, max average, Standard 2023 Deviation. 2024 2025 2.7.6 Equipment monitoring 2026 2027 There are a number of ways that HVAC equipment can be monitored; 2028 consider a fan motor: 2029 2030 The control contactor can be wired so that an alarm is given if the 2031 unit goes into overload. 2032 The motor current can be monitored 2033 The motor temperature can be monitored 2034 Vibration or acoustic output may be monitored. 2035 The airflow from the fan can be monitored using an in duct device, 2036 or a in fan device 2037 2038 The unit which measures the flow is the unit which will detect all of 2039 the fan failure modes, the others have potential limitations, depending 2040 on the fan drive arrangement, this measurement is also likely to be the 2041 most sensitive. 2042 2043 With the new generation of accelerometers it is cost effective to 2044 monitor the performance of rotating equipment to ensure early detection 2045 of system wear (due to vibration). The sensors can be wired to a BMS, 2046 or be wireless, transmitting data to a base station for monitoring. 2047 2048 2.7.5.1 Other equipment parameters may also be monitored, primarily as 2049 part of GEP to ensure lowest life cycle cost: 2050 Fan speed (or current draw, to indicate added pressure drop due to 2051 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 51 filter loading) 2052 Supply duct pressure 2053 Damper actuator positions (to predict need for re-balancing of the 2054 HVAC) 2055 Filter pressure drop (where filters tend to load quickly) 2056 Cooling coil leaving temperature 2057 Other HVAC parameters, to aid in predicting maintenance and in 2058 troubleshooting performance problems 2059 2060 2.7.5.2 Sensor mounting considerations 2061 2062 The things to consider when selecting where to mount a sensor are: 2063 2064 The instrument needs to be mounted so that it is easy to calibrate. 2065 2066 The instrument specification and mounting need to consider any local 2067 cleaning required 2068 2069 It is best to keep pneumatic control lines as short as possible. 2070 2071 2.8 SYSTEM ECONOMICS 2072 2073 2.8.1 Introduction 2074 2075 The pharmaceutical industry is unusual in that the potential impact of 2076 an HVAC system failure could be financially very significant, for 2077 example causing loss of a batch of product, or the loss of control of 2078 the conditions in a research laboratory, potentially invalidating the 2079 results of a long term test. Thus the risk assessment of a system‘s 2080 failure must encompass the product quality issues as well as the 2081 potential business issues. The benefit of providing a clear definition 2082 of the potential impact of system failure is that it can influence and 2083 justify the allowable budget for the system. 2084 2085 If the cost and likelihood of failure is high, duplication of 2086 systems/equipment may be viable. But a better recourse is to redesign 2087 the system or process to reduce the risk. The potential impact of 2088 redundancy will not only influence the HVAC system design and 2089 maintenance but also the design requirements for the supporting 2090 utilities – for example, there may be no sense having duplex air 2091 conditioning systems if there is only one chiller and one circulating 2092 pump for the chilled water supply to the HVAC cooling coil. 2093 2094 There is another ―softer‖ consideration – appearance. The industry is 2095 open for audit, typically by internal as well as external agencies, and 2096 there is a strong desire to maintain the appearance of the facility. 2097 Thus the cost of the equipment installed may be higher than in 2098 equivalent plant in other industries. 2099 2100 These requirements present Engineers with a unique set of challenges 2101 which vary from system to system. The engineer needs to review the risk 2102 and potential impact of system failure considering all of the potential 2103 modes of failure, for example; 2104 2105 Airflow failure 2106 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 52 Filter failure (loss of control of airborne particles or cross-2107 contamination) 2108 Failure of temperature control 2109 Failure of humidity control 2110 2111 This risk analysis assessing the potential impact of system failure can 2112 significantly influence the HVAC system design, and maintenance, as 2113 well as the design of the supporting utilities. The scope of the 2114 analysis may include business as well as quality aspects – 2115 simplistically put if the system fails, and the qualified (verified) 2116 monitoring system advises quality that the area is not within 2117 specifications, there is no patient risk, but the coat to the business 2118 could be considerable. 2119 2120 These considerations are on top of the conventional economical 2121 considerations balancing capital and operating costs. 2122 2123 The user requirements have serious implications on the design, and need 2124 to be carefully considered and defined, they should include the 2125 following: 2126 2127 Internal conditions - How much variation is acceptable, - a wider 2128 operating range will mean a lower cost system, both to install and 2129 operate. Many believe that if they specify closer operating ranges, 2130 they will get a ―better‖ i.e. more robust system, this is not 2131 necessarily the case, in order to maintain closer tolerances the 2132 plant may be selected with greater capacity and faster responding 2133 sensors, and actuators, which are more sensitive and require careful 2134 tuning, and maintenance. Having specified these closer tolerances 2135 the system must be commissioned to operate to meet these 2136 specifications. The capital and operating costs of this more complex 2137 system are likely to be higher. 2138 External conditions - If the facility is to kept operable 365 days a 2139 year then the plant needs to be sized to handle the peak external 2140 design conditions. If it is acceptable to have a a few percent 2141 downtime during peak seasons, then the HVAC system and supporting 2142 utilities can be downsized to suit, or a system of load shedding 2143 incorporated into the design of the support utilities, with the HVAC 2144 system components being sized to suit the extremes. 2145 2146 Other factors will affect the system economics: 2147 2148 Building envelope - A low cost poorly insulated facility will mean a 2149 corresponding increase in the operating cost and capital cost of the 2150 HVAC system, for a given set of internal conditions. Similarly a 2151 review of the facility construction/insulation may be beneficial – 2152 for example improving the insulation may allow a warehouse facility 2153 to require only a heating system, rather than air conditioning. 2154 Internal layout/design - A well developed design will keep the 2155 influence of major heat loads outside the conditioned area, or use 2156 the other utilities required to minimize the internal loads, for 2157 example a dust extract unit can also extract heat from a motor in 2158 the room, reducing space heat gains. There may be benefits from 2159 grouping the environmentally critical areas within the building, 2160 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 53 keeping them away from the external walls, to reduce the external 2161 load variations. 2162 2163 2.8.2 Life Cycle Cost Analysis 2164 2165 Typical method – Evaluate payback against incremental cost of options 2166 e.g. design types – for dehumidification chemical dehumidification vs. 2167 chilled water or DX systems optimizing air distribution, use of 2168 Computational Fluid Dynamics (computer airflow modeling), allowing 2169 larger room supply air temperature differences, humidification using 2170 local electric boilers, water spray injection (ultrasonic or air 2171 blown.) Ductwork design based on static regain, requiring minimum 2172 balancing. Typical HVAC Economic Issues: 2173 2174 Availability 2175 Sizing 2176 Volume vs. temperature to achieve ―Q‖ 2177 Waterside vs. Airside energy reductions 2178 Energy Recovery 2179 2180 TABLE 2-5 WHAT IS IT? Table to go in!! 2181 2182 When reviewing potential solutions, the life cycle cost should be 2183 analyzed – the analysis will encompass the following aspects, 2184 considering capital cost and lifetime operating costs. 2185 2186 2.8.2.1 First Cost vs. life cycle cost 2187 2188 There is a balance between first cost and operating cost, as well as 2189 considering the factors described in this section, the designer must 2190 consider: 2191 2192 The system design life 2193 Labor costs and trends 2194 Energy costs and trends 2195 2196 The maximum capital spend that will make the project financially viable 2197 2198 2.8.2.2 The system design life 2199 2200 If the facility has a short life, then it may be possible to save money 2201 on the equipment, and not invest in plant of the quality that would be 2202 optimum for a facility with a long predicted operating life. 2203 Maintenance costs (as discussed below) extend over the entire facility 2204 life, becoming more cost-significant as the facility life increases. 2205 2206 2.8.2.3 Labor costs and trends 2207 2208 The decision to invest in performance monitoring and, for example 2209 centralized lubrication systems will similarly be influenced by the 2210 anticipated facility life and the cost of labor. 2211 2212 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 54 2.8.2.4 Energy costs and trends 2213 2214 The cost of energy must be considered not only from the system design 2215 concepts, but the perspective of component selection, for example: 2216 2217 AHU housing – low cost units may be made of pre-finished steel, and 2218 have minimal insulation. The unit may suffer from high air leakage, 2219 causing increased operating costs, and sweating, causing external 2220 corrosion and a shorter working life. 2221 Fan – the fan may be direct drive, with a variable frequency supply 2222 to vary the fan speed to maintain a constant supply volume. It may 2223 use a high efficiency flat belt drive instead of the traditional V-2224 belts to improve energy efficiency. 2225 Filter selection – the optimum selection of pre-filtration systems 2226 will balance labor cost, filter cost, the contaminants in the local 2227 environment, the capacity of the filter, energy costs and the cost 2228 of cleaning the AHU during changing of the filter – this may be the 2229 conventional panel / bag, or may be a bag / bag filter combination. 2230 Chillers cooled using cooling tower water rather than air cooled 2231 condensers. 2232 Chilled water cooling vs. direct expansion 2233 2234 Energy Recovery 2235 2236 The potential risk of cross contamination means that some of the 2237 simpler means of heat recovery, such as the rotating wheel are not 2238 acceptable, however other systems such as heat pipes, and run around 2239 coils are and should be reviewed to see if there is a payback. 2240 2241 Similarly systems which use the measurement of enthalpy to vat the 2242 amount of fresh air may be economic, though the design and sizing of 2243 the dampers needs to be more carefully considered for an application 2244 where it is important to maintain system volumes, and room pressure 2245 differentials. 2246 2247 2.8.2.5 Consumables Costs 2248 2249 The life and cost of each consumable component must be considered - 2250 filters are an obvious example – the optimum selection of pre-2251 filtration systems will balance labor cost (for the actual replacement 2252 and the cleaning required when a filter is removed prior to installing 2253 the new filter), filter cost, the contaminants in the local 2254 environment,the capacity of the filter, rate of change of pressure 2255 drop, energy costs in order to recommend an optimum selection – this 2256 may be the conventional panel / bag arrangement or may show a bag / bag 2257 filter combination to be more cost effective. 2258 2259 Another example would be the drive belt – V-belts have a significantly 2260 shorter life than a flat belt, but cost less. They are not as energy 2261 efficient as a flat belt though, thus the savings in maintaining a 2262 stock of spare belts, energy savings, and saving in labor costs to 2263 replace the belts, and re-tension them may make them cheaper over the 2264 plant operating life. 2265 2266 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 55 2.8.2.6 Impact of system failure 2267 2268 If the cost and likelihood of failure is very high, and product value 2269 and risk are also high, duplication of systems/equipment may be 2270 advisable. 2271 2272 The potential impact of system failure will not only potentially 2273 influence the HVAC system design and maintenance but affect design of 2274 the supporting utilities. 2275 2276 2.8.2.7 Appearance is another factor many believe influences plant 2277 room, system and equipment design and specification. The industry is 2278 open for audit, typically by internal as well as external agencies, and 2279 there is a strong desire to maintain the appearance of the facility – 2280 in addition to complying with the GMP requirements, ensuring that not 2281 only the equipment but the plant room area and is easily cleanable. 2282 2283 2.8.2.7 Reliability / Maintenance Costs 2284 2285 The life cycle cost analysis must also consider reliability / 2286 maintenance aspects. 2287 2288 Consider the lowest cost material used for a cooling coil, aluminum 2289 fins on copper tube. In a poor environment there will be corrosion on 2290 the fin material, reducing the efficiency of the unit, with the fins 2291 eventually corroding to the extent that the unit will not perform 2292 adequately. 2293 2294 There are options for the specification of this item, each increasing 2295 the first cost, but increasing the operating life: Copper tube with 2296 polyester coated aluminum fins or Copper tube with electro tinned 2297 copper fins 2298 2299 A fan specification with a long design bearing life will allow for 2300 extended operating periods without maintenance. Grouped lubrication 2301 points will minimize costs, and allow lubrication when the plant is in 2302 operation. 2303 2304 The cost of routinely calibrating instrumentation should not be 2305 overlooked – it may be cost effective to have one calibrated 2306 differential pressure switch across a bank of filters, with un-2307 calibrated ―engineering information‖ pressure gauges across each 2308 filter. 2309 2310 2.8.2.9 As well as the obvious factors there are other ―political‖ 2311 factors to consider to vary the ratio of direct (capital) vs. indirect 2312 (operating) cost; 2313 2314 There may be grants available to assist with capital costs 2315 There may be incentives to make the system more energy efficient 2316 2317 2.8.3 User Requirements Specification 2318 2319 As a project is considered justifiable, before the design details are 2320 developed the quality critical environmental requirements must be 2321 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 56 defined by the user, typically in a User Requirement Specification – 2322 this may include; 2323 2324 Temperature for product and for workers 2325 Humidity for product and for workers 2326 Air flow directions / differential pressures for contamination 2327 control 2328 Area classification (particles – viable and non-viable (classified 2329 spaces) 2330 Clean up times from in-sue to at-rest (classified spaces) 2331 2332 The user requirements can have a significant influence on system cost, 2333 and need to be carefully considered and defined. For example: 2334 2335 2.8.3.1 Air Change rates 2336 2337 There is a common misconception within the Pharmaceutical Industry of a 2338 regulatory requirement of a minimum air change rate for an area – 2339 typically held to be 20. This is generally not true, especially for 2340 non-classified areas. In the European regulations there is a 2341 requirement for a ―clean up‖ time of 15 to 20 minutes in a sterile 2342 product processing facility – calculating this based on a clean air 2343 supply to a room, completely uniform mixing from class 10,000 to class 2344 100 gives 14 minutes recovery time – in practice neither of these 2345 assumptions are realistic. 2346 2347 However, the 2004 FDA ―Guidance for Industry for Sterile Drug Products 2348 Produced by Aseptic Processing – Current Good Manufacturing Practice‖ 2349 gives the following guidance: 2350 2351 For Class 100,000 (ISO 8) supporting rooms, airflow sufficient to 2352 achieve at least 20 air changes per hour is typically acceptable. 2353 Significantly higher air change rates are normally needed for Class 2354 10,000 and Class 100 areas. 2355 2356 Some companies specify their own arbitrary air change rates – this is 2357 not a good practice; the designer should take responsibility for 2358 defining this based on a number of factors. 2359 2360 There may be a benefit in assuming air change rates to use as a basis 2361 for establishing an initial project concept cost used to determine the 2362 viability of a project. 2363 2364 In order to define the actual air change rate required the designer 2365 must consider the following interrelated factors: 2366 2367 Heat gain to the conditioned space due to external influences – e.g. 2368 solar gain 2369 Heat gain to the space due to internal influences – e.g. equipment 2370 Moisture gain to the conditioned space due to external influences – 2371 e.g. external humidity 2372 Moisture gain to the space due to internal influences – e.g. 2373 occupants 2374 The number and location of the occupants in the space 2375 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 57 The tasks the occupants are doing 2376 The clothing (gowning level) of the occupants 2377 The process 2378 The cleanliness of the supply air 2379 The means and efficiency of coverage of distributing the supply air 2380 The means and location of extracting the air from the conditioned 2381 space 2382 Where the control and monitoring sensors are located 2383 The locations where the specified conditions are critical – e.g. in 2384 a tablet compression room the process will add a considerable amount 2385 of heat to the product – the critical area is likely to be where the 2386 raw material is exposed. 2387 The cost of putting in a system capable of higher air change rates 2388 than those actually required is significant both in terms of the 2389 capital and system operating costs. As discussed earlier, a process 2390 that generates low volumes of particles, in a large room, may need 2391 fewer air changes to maintain desirable particle levels. 2392 2393 2.8.4 Life Time Operating Costs 2394 2395 These are the total costs of building and operating the installation, 2396 including design, purchasing, installing, commissioning, operating and 2397 maintaining (including labor, energy and spare parts) the system during 2398 the working life of the asset, and its dismantling. Cleaning and 2399 disposal cost. Refer to 2.8.2, and 2.8.4 for the factors affecting 2400 this. 2401 2402 2.8.5 Comparing Options 2403 2404 Most companies have internal accounting systems that will facilitate 2405 the evaluation of different design concepts, evaluating payback against 2406 the cost of the different designoptions, (investment analysis) 2407 considering the design life of the facility e.g. chemical 2408 dehumidification vs. chilled water or DX systems, humidification using 2409 suitably treated plant steam, local electric boilers, water spray 2410 injection (ultrasonic or air blown), or clean steam, water cooled vs. 2411 air cooled chillers. 2412 2413 Some of the areas to consider are provided below: 2414 2415 Energy sources 2416 Airflow management – through the use of flow measurement and fan 2417 speed control 2418 Energy efficient ductwork design based on low velocity static 2419 regain, requiring minimum balancing 2420 Night setback of temperature and or humidity, reduction in airflow 2421 if no production 2422 Fume hood velocity control and fume hood diversity 2423 Minimizing the use of local heating/cooling batteries 2424 Energy recovery systems – air to air or air to fluid to air (e.g. 2425 rotary wheels, heat pipes, run around coils). 2426 Recovery and use of cooling coil condensate 2427 Reuse of cooling tower blow down water 2428 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 58 Use of non storage water heater (calorifier) 2429 2430 2.9 SUSTAINABILITY (TO BE WRITTEN LATER) 2431 2432 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 59 3 THE DESIGN PROCESS 2433 2434 3.1 INTRODUCTION 2435 2436 The HVAC engineer is responsible for the development of a GMP compliant 2437 design for that particular application which also meets other key 2438 customer requirements such as reliability, maintainability, 2439 sustainability, flexibility, and safety and which complies with local 2440 codes and standards. In the pharmaceutical industry, the role of the 2441 HVAC design engineer requires not only an understanding of both basic 2442 and advanced HVAC system design, but also a thorough understanding of 2443 the most current requirements of the regulatory authorities which will 2444 govern that particular facility‘s operations. This includes cGMPs of 2445 the countries where the facility‘s product will be sold as well as 2446 where the facility is located. To be successful in delivering such a 2447 design, the HVAC engineer must also understand how those systems 2448 integrate into and are affected by other aspects of the facility design 2449 and operation. People, equipment and material flow patterns, 2450 architectural layout, finishes and tightness of room construction, air 2451 locks, spatial requirements for HVAC equipment an d ductwork, intake 2452 locations and exhaust locations are all examples of where the HVAC 2453 engineer must coordinate the HVAC design with other disciplines for a 2454 successful project. 2455 2456 3.1.1 System Design Process 2457 2458 The engineer responsible for HVAC system design follows a process that 2459 includes first defining and documenting the key requirements of the end 2460 user (process and quality criteria, maintainability, etc.). This will 2461 require collaboration with the user and the quality unit in determining 2462 which are the critical operating parameters and thus the environmental 2463 requirements which must be provided by the facility design, including 2464 the HVAC systems. This defining of user requirements is the most 2465 critical step in the design process and has the greatest impact on the 2466 size and complexity of the facility, and ultimately the cost to 2467 construct, commission, qualify, operate and maintain it. Even small 2468 incremental increases in the level of cleanliness and the amount of 2469 classified space can result in relatively large increases in the 2470 initial cost of the facility and ongoing operating costs. It is 2471 important to clearly establish the required levels of cleanliness for 2472 any particulate, biological and/or chemical contamination for the 2473 processes, equipment and personnel in the facility. The HVAC engineer 2474 plays a key role throughout the design process in helping the project 2475 team understand the implications of excessive requirements on the cost 2476 of the project and the ongoing operating costs of the facility. 2477 2478 Once user requirements are established, the HVAC engineer must use his 2479 knowledge of HVAC systems to work with other disciplines to develop a 2480 functional (or schematic) design. This includes a risk assessment of 2481 alternative engineering solutions that can meet the user requirements. 2482 The risk assessment can be combined with an economic analysis to arrive 2483 at a facility and HVAC system which will have the lowest total cost of 2484 ownership. In addition to the cGMP related user requirements, the 2485 following are some additional issues that the HVAC engineer and the 2486 project team need to address in order to develop the functional design 2487 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 60 for the facility: 2488 2489 Flow patterns of people, product, equipment and other materials 2490 Potential sources and risks of contamination 2491 Hierarchy of cleanliness classification to control contamination 2492 risks 2493 Procedures to control contamination (i.e., cleaning, sanitization) 2494 Requirements for redundancy of equipment and/or systems 2495 Requirements for flexibility of the facility and/or systems 2496 Economics of facility first cost and operational costs 2497 2498 In developing the functional design, the HVAC engineer must also 2499 consider the design in light of the need to construct, commission, 2500 qualify, operate and maintain the facility and its HVAC systems. 2501 2502 At certain points in the design process, often at the end of 2503 functional design and before detailed design begins, the HVAC engineer 2504 will be involved in a formal design review/design qualification which 2505 is intended to verify that the project as designed will deliver a 2506 facility, including an HVAC system, which will meet the user 2507 requirements. After detailed design is completed, the HVAC engineer 2508 will often remain involved in the project by helping to resolve 2509 construction questions from the field and performing on-site 2510 construction reviews. He/she may also be involved in activities related 2511 to the receipt and installation of equipment and systems intended to 2512 verify that they were delivered and installed in a manner consistent 2513 with the design. The HVAC engineer is also often involved in the 2514 commissioning and qualification of the HVAC systems to verify that they 2515 perform as designed. This could include involvement in developing the 2516 Commissioning and Qualification (C&Q) protocols and/or executing the 2517 C&Q verification activities. The HVAC engineer is often involved in 2518 Factory Acceptance Testing (FAT) and/or Site Acceptance Testing (SAT) 2519 of major HVAC equipment and systems. The engineer is well advised to 2520 include planning for C&Q activities on the project during the design 2521 phase. Multiple past projects have proven that failure to consider C&Q 2522 requirements during the design phase may have a negative impact to the 2523 project in scope, cost and schedule. 2524 2525 3.1.2 Regulatory Considerations 2526 2527 To be an effective member of the design team, the HVAC engineer needs 2528 an understanding of the regulatory requirements which will govern the 2529 facility and its processes. This requires an understanding of the cGMPs 2530 where the facility is located and those where the facility‘s products 2531 will be marketed, and the implications on the design of the facility 2532 and its HVAC systems. ISPE‘s Baseline Guide series provides practical 2533 advice for understanding and meeting regulatory requirementsfor 2534 various types of facilities (Parenteral, OSD, API, etc.) and their 2535 systems (maintenance, water & steam systems, etc.) and should be 2536 consulted in conjunction with this Good Practice Guide. 2537 2538 These regulatory requirements identified in the Baseline Guides from 2539 such governing bodies as the FDA, EMEA, USP, ASTM, ICH, ISO, WHO, etc. 2540 will impact the project design at the HVAC system design level in such 2541 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 61 areas as: 2542 2543 pressure differentials 2544 temperatures 2545 air change rates 2546 specific alert and alarm ranges 2547 facility layout (cleanliness classification hierarchy strategy, 2548 airlock strategy, etc) 2549 monitoring and control platforms (BMS, DCS, PLC, etc.) 2550 Commissioning & Qualification 2551 2552 In addition to the cGMP quality regulatory requirements, the HVAC 2553 engineer must also be knowledgeable about other compliance related 2554 codes and standards which apply to the design of facilities and HVAC 2555 systems where the facility is located. These include applicable local 2556 building, mechanical, electrical, fire and energy codes. Other 2557 compliance related requirements will usually apply which govern 2558 employee health & safety and process safety. The owner‘s insurance 2559 representative may also have additional requirements for their clients 2560 beyond those of the local codes. 2561 2562 3.2 DEVELOPING THE USER REQUIREMENTS SPECIFICATION (URS) 2563 2564 3.2.1 Introduction 2565 2566 User requirements provide key information that defines the processes, 2567 activities, and environments needed for an operating facility. 2568 Assembling programming data for a facility early in the design process 2569 is critical to the successful operation, not only in terms of 2570 production output and efficiency, but also in delivering the asset at 2571 the right time to maximize Return On Investment (ROI) and provide the 2572 lowest Total Cost of Ownership(TCO). 2573 2574 Decisions and commitments made in the early phase of project planning 2575 are often too costly to change as the project advances to final design 2576 and then to execution phase. Therefore, developing the user 2577 requirements that drive HVAC criteria early in the design process is 2578 critical in setting the overall HVAC strategy for the facility. HVAC 2579 costs, both operating and initial capital costs, can account for a 2580 significant portion of a facilities cost. 2581 2582 It is important to ensure that user requirements are well understood 2583 and properly applied. 2584 2585 For HVAC systems in a pharmaceutical environment, user requirements are 2586 developed as a result of gathering relevant data with regards to the 2587 following: 2588 2589 Process – Critical environmental parameters that must be achieved and 2590 maintained. 2591 2592 Quality – Regulatory guidance and quality principles to guide decision 2593 making on HVAC parameters that can have product impact. 2594 2595 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 62 Operations – Proper environment for the working conditions that impact 2596 the HVAC design. 2597 2598 Maintenance – Provide input on critical aspects of the HVAC design that 2599 would ensure a low TCO 2600 2601 User requirements have often been associated with qualification, that 2602 is, critical HVAC parameters (e.g., temperature, humidity, differential 2603 pressure, air quality) are segregated from non critical HVAC 2604 parameters. Critical HVAC parameters are part of direct impact systems 2605 while non-critical HVAC parameters are either indirect or no impact 2606 systems. In either case, all HVAC systems are commissioned following 2607 GEP while direct impact systems are further qualified. 2608 2609 User requirements can either be in the form of performance based 2610 information that describes an operation and sets expectations or strict 2611 criteria where critical HVAC parameters are well defined, e.g., 2612 Temperature, Relative Humidity, etc. 2613 2614 In the case of performance based information, the HVAC designer would 2615 gather relevant information and propose the necessary criteria that 2616 would meet the user requirements. It is accepted practice to copy HVAC 2617 criteria from one facility to another (similar) facility – as long as 2618 the rationale for the original criteria is well understood. For 2619 example, determining temperature and relative humidity criteria in an 2620 aseptic environment is dependent on, type of process (closed or open, 2621 powder or liquid), local regulatory expectations, gowning procedures, 2622 environmental monitoring procedures, the level and type of activity in 2623 the area, and alert and alarm limits,. The HVAC designer should 2624 carefully consider each of these variables when proposing criteria and 2625 avoid using "industry norms" or "accepted industry practices" without 2626 an understanding of the variables involved. 2627 2628 Once user requirements are established, the HVAC designer should begin 2629 to consider design strategies and impact. It is desirable to segregate 2630 HVAC parameters that are critical and non-critical under different HVAC 2631 systems rather than mix critical and non-critical HVAC parameters under 2632 the same system. Although there may not be any restrictions from a 2633 process viewpoint, segregating HVAC system components between direct 2634 and indirect impact adds to the complexity of commissioning and 2635 qualification. It could unnecessarily drive up qualification and on-2636 going maintenance costs. 2637 2638 The flow diagrams shown below are a simple model segregating critical 2639 HVAC parameters with separate HVAC systems versus combining critical 2640 and non-critical HVAC parameters, by virtue of a single HVAC system. 2641 Both design approaches would meet user requirements but it illustrates 2642 the potential complexity when using a single HVAC system to serve 2643 direct and indirect/no-impact areas. 2644 2645 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 63 The impact assessment methodology evaluates the HVAC system at the 2646 component level to separate out critical and non-critical components, 2647 thus making it possible to have a single HVAC system. Well defined and 2648 accepted procedures should be in-place or agreed upon when defining the 2649 user requirements that would allow the single HVAC system to have a 2650 lower total cost of ownership. If these concepts are not well 2651 understood or established procedures or practices do not recognize this 2652 methodology, the HVAC design may increase the total cost of ownership. 2653 2654 Figure 3-1 User Requirements drive HVAC critical parameters 2655 2656 3.2.2 References for User Requirements 2657 2658 ISPE Baseline Guides provide a framework to understand the different 2659 products and processes within pharmaceutical and biopharmaceutical 2660 manufacturing facility. The baseline guides that would apply to this 2661 section include the following: 2662 2663 Bulk Pharmaceutical Chemicals 2664 Oral Solid Dosage Forms 2665 Sterile Manufacturing Facilities 2666 Biopharmaceuticals 2667 Packaging, Labeling & Warehousing Operations (under development) 2668 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 64 Laboratories (draft) 2669 2670 (Include a chart with a timeline and activities to illustrate?.... no) 2671 2672 The following section describes HVAC parameters as covered in the 2673 Baseline Guides listed above and the importance of each parameter in 2674 eachtype of facility. 2675 2676 3.2.3 HVAC Parameters 2677 2678 HVAC parameters that may have impact on product generally include: 2679 2680 Temperature 2681 Relative Humidity 2682 Airborne contamination (viable and non-viable particles), which is 2683 affected by: 2684 2685 Room Relative Pressure 2686 Airflow patterns 2687 Air Changes 2688 Air Filtration 2689 2690 Within the context of the baseline guides listed, some parameters are 2691 common to all facility types while other parameters only apply to 2692 specific facilities. The following chart depicts at-a-glance the 2693 typical HVAC parameters that would generally apply to each facility 2694 type. 2695 2696 HVAC Parameter Facility Type Temperature Relative Humidity Room Relative Pressure Airborne Particles Air Changes Bulk Pharmaceutical Chemicals Oral Solid Dosage Forms Air direction Sterile Manufacturing Facilities Biopharmaceuticals Pack., Labeling & Warehousing Laboratories 2697 Table 3-1 Typical HVAC Critical Parameters by facility type 2698 2699 Hatched areas represent the HVAC parameter used to set criteria that 2700 normally would have product impact or is required for creature comfort. 2701 Non-shaded areas are HVAC parameters that do not normally have product 2702 impact and are not used to set criteria. However, there may be other 2703 requirements such as local codes or regulations that may require 2704 certain parameters be considered in the design. For example, room 2705 relative pressure may not have product impact in a Bulk Pharmaceutical 2706 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 65 facility, but due to governing codes, the design may implement room 2707 pressurization controls in order to sustain certain safety requirements 2708 due to the high presence of flammable liquids or vapors. 2709 2710 Individual HVAC parameters are discussed in the following section with 2711 an emphasis on establishing the minimum requirements to achieve 2712 "compliance", the importance of the parameter, the impact on design, 2713 and the challenges faced in determining these requirements. 2714 2715 3.2.3.1 Temperature 2716 2717 General 2718 2719 Temperature requirements will vary depending on the application, 2720 product impact, and operator comfort. …………… 2721 2722 This looks to be light… why discuss just temperature? 2723 2724 3.2.4 Critical Parameters 2725 2726 Provide typical critical HVAC parameters under a given process or 2727 classification; i.e., Product Type, Solvent Issues, Environmental 2728 Classification, Open/Closed processes, Terminally Sterilized, Oral 2729 Solid Dosage Forms. Discuss assumptions or clarifications 2730 2731 The risk assessment process is used to determine which HVAC system 2732 components are critical to the SISPQ of the product. These components 2733 will require additional attention via qualification and may require 2734 higher levels of redundancy to avoid business impact. 2735 2736 This logic could be extended to determine which components should be 2737 under cGMP change control, with the remainder of the system under GEP 2738 change control. 2739 2740 There are a number of ways to address this. One suggested method will 2741 be provided in the form of a matrix in which the individual components 2742 of the HVAC system (preheat coil, fan, temperature sensor, etc.) are 2743 listed on one axis and a series of challenge questions which will aid 2744 in determining the GMP-critical nature of that component are listed on 2745 the other axis. 2746 2747 Managing HVAC Parameters (Monitoring) – Accountability for alerts and 2748 alarms. Methodology in determining appropriate alarm delays. Guidance 2749 on how to monitor - BAS, procedural means or manual monitoring. 2750 Determining what should be monitored – every room or select rooms. 2751 2752 Table 3-2 (HVAC System Impact Matrix) See Appendix for graphic 2753 2754 3.2.5 Programming and Layout Considerations 2755 2756 The following is a listing of issues and considerations regarding HVAC 2757 systems and how they may affect the programming and layout of the 2758 facility design. These are areas in which the HVAC engineer and the 2759 project programmer must coordinate their knowledge and experience to 2760 avoid future problems in the construction, verification, operation and 2761 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 66 maintenance of the facility. The impact of HVAC on programming and 2762 layout will vary by the type of facility, generally increasing as the 2763 complexity of the facility increases from general administrative office 2764 areas to more complex facilities for aseptic and/or potent compound 2765 processing. 2766 2767 It is important to establish User Requirements before beginning layout 2768 and design. It is especially important to identify critical parameters 2769 versus controlled parameters, as this is a major factor determining 2770 environmental cleanliness classifications. In general, the larger the 2771 classified area and the more stringent the environmental cleanliness 2772 class the more complex and costly the HVAC system, both first cost and 2773 the ongoing operating cost. Determine if there are there special 2774 requirements for temperature or RH for specific rooms (freezers, chill 2775 rooms, stability storage chambers, R&D suites, etc.). 2776 2777 The flow of materials, equipment and people (unidirectional flow; 2778 gravity flow, etc.) must be understood by the HVAC engineer in 2779 determining area classifications, pressurization strategies, airlock 2780 strategies (the use of airlocks to separate areas of different 2781 requirements for cleanliness, pressure, temperature, and/or RH) and 2782 their classification, HVAC system zoning, etc. 2783 2784 Area functionalities and adjacencies (both horizontal and vertical) 2785 2786 Determine functional/relational adjacencies (i.e., don‘t put large air 2787 compressors adjacent to a laboratory with vibration-sensitive precision 2788 analytical equipment.) 2789 2790 There may be special considerations in the layout and adjacencies for 2791 projects employing prefabricated modular construction. 2792 2793 The locations and considerations for HVAC and utilities equipment, 2794 ducting/piping routing, supply/exhaust/return diffusers/grilles. 2795 Outside air intakes and exhaust stacks must be located to avoid 2796 entrainment/re-entrainment of noxious fumes and odors such as lab fume 2797 hood exhausts, process vents and diesel fumes from idling trucks near 2798 docks and other loading/unloading facilities. Will major equipment be 2799 located in basement, penthouse, roof or elsewhere? Building 2800 configuration (H x W x L) may affect the location of central services 2801 and how they are distributed. 2802 2803 Understand the requirements for maintenance, testing, repair and/or 2804 replacement. This includes the locations for access doors/panels for 2805 HVAC system inspection, testing and maintenance, including HEPA filter 2806 scan testing and maintenance. Access to field instruments for 2807 calibration, testing, and repair must also be considered. For AHU 2808 maintenance, consider how to remove/replace large motors & fans, DH 2809 wheels, coils, filters. You not only need access around the AHU for 2810 equipment removal, but must consider how large equipment will be 2811 removed from the area and replacements moved into the area (clear 2812 pathways, hoists/elevators, etc.). Identify the locations and need for 2813 access to BMS/EMS data and control, and what local indications and/or2814 control features are needed. What are the maintenance philosophies for 2815 the facility (i.e., maintain from inside or outside of room)? 2816 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 67 2817 What are the materials to be used in the process (i.e., potent, 2818 solvents, cytotoxic, sterile) and the approaches & technologies for 2819 product containment and for clean/sterile processing. The use of mini-2820 environments (barrier isolators, RABS, biosafety cabinets, etc.) will 2821 usually reduce both the required amount and grade of classified space 2822 compared to traditional ‗ballroom‘ cleanroom processing. The location 2823 of hazardous equipment & ductwork and the need to maintain them may 2824 affect the facility layout. 2825 2826 Issues related to codes and standards: 2827 2828 What codes and standard apply to this jurisdiction? (ADA, Fire, 2829 OSHA, Energy, IMC, etc.) 2830 Egress and other safety considerations 2831 Must understand risks associated with various layout and programming 2832 issues (i.e., area electrical classification, blowout panels, SISPQ 2833 risks…) 2834 Special considerations with hydrogen operations 2835 2836 The requirements of local codes and standards may need special 2837 attention in the design and construction of prefabricated modules. 2838 When facility modules are fabricated in a different jurisdiction than 2839 the location of the facility, this may become a major problem if not 2840 identified early in the design process. 2841 2842 Within the room: Consider the locations of people, processes and 2843 product with respect to HVAC supplies and exhaust/returns. Consider the 2844 equipment heat loads (where is heat generated and how is it cooled or 2845 extracted?) Consider the location of utilities connection with respect 2846 to the operations to be performed. Room HVAC system must be designed as 2847 an integrated system in rooms with fume hoods, BSCs, LEV systems and 2848 process equipment HVAC systems. The decision of whether to use a 2849 manifold exhaust system versus one fan per hood may affect facility 2850 layout. 2851 2852 3.2.6 Architectural Considerations 2853 2854 Similar to the previous section, the following is a listing of issues 2855 and considerations regarding HVAC and how they may affect the 2856 architectural portion of the project and vice versa. All of the 2857 previously identified issues for consideration in the programming and 2858 layout of the facility (Section 3.2.4) are areas in which the project 2859 HVAC engineer and project architect need to coordinate their designs. 2860 The following are additional areas in which the HVAC engineer and the 2861 project architect must also coordinate their knowledge and experience 2862 to avoid future problems in the construction, verification, operation 2863 and maintenance of the facility. 2864 2865 The materials of construction of the facility is a major area to 2866 address. 2867 2868 Room Finishes: Must be cleanable, resistant to cleaning and 2869 sanitization chemicals, suitable for the environment, and be 2870 wear/bump resistant. 2871 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 68 2872 Flooring: The same considerations as for Room Finishes. Selection of 2873 the flooring material for the application is important, but equally 2874 important is verifying the technique and skills of the flooring 2875 installer. Often, installing test patches of the materials and the 2876 techniques being considered is the best method to evaluate their 2877 performance in a specific application. 2878 2879 The construction methodology for the facility is another key area in 2880 which the architect and the HVAC design engineer must coordinate their 2881 designs. 2882 2883 Room tightness. Use floor to ceiling walls where pressure 2884 differential is important. If RH is important, then address reducing 2885 moisture migration through unsealed penetrations, door seals, and 2886 porous wall materials. Considerations in the door specifications 2887 need to address seals, windows, interlocks, construction of the 2888 door, actuation and hardware. 2889 2890 Consider a commissioning test to verify room tightness (i.e., room 2891 leakage test or room integrity test). 2892 2893 The use of prefabricated modular construction techniques might 2894 impose additional restrictions on the HVAC design (design might be 2895 limited to equipment vendors with which the module contractor has an 2896 established relationship; the size of AHUs might be limited to the 2897 size of a standard module; etc.) 2898 2899 Impact of HVAC on programming and layout will vary by the type of 2900 facility. (some of this is redundant) 2901 2902 Flow of materials, equipment and people (unidirectional flow; 2903 gravity flow, etc.) 2904 Area functionalities and adjacencies (both horizontal and vertical) 2905 Determine functional/relational adjacencies (i.e., don‘t put large 2906 air compressors adjacent to a laboratory with vibration-sensitive 2907 precision analytical equipment. 2908 Locations and considerations for HVAC and utilities equipment, 2909 ducting/piping routing, supply/exhaust/return diffusers/grilles. 2910 Major equipment in basement, penthouse, roof or ???? 2911 Requirements for testing, repair and/or replacement (i.e., HEPA 2912 filter scan testing and maintenance) 2913 Access doors/panels for HVAC system inspection, testing and 2914 maintenance 2915 For AHU maintenance- how to remove/replace large motors & fans, DH 2916 wheels, coils, filters, 2917 Environmental cleanliness classifications 2918 Materials to be used in the process: Potent, solvents, cytotoxic, 2919 sterile? 2920 Determining User Requirements (critical parameters versus controlled 2921 parameters) 2922 What codes and standard apply? (ADA, Fire, OSHA, ??) 2923 Egress and other safety considerations 2924 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 69 Building configuration (H x W x L) may affect the location of 2925 central services and how they are distributed. 2926 Approaches and technologies for product containment. 2927 Routing of ductwork & utilities 2928 Location of Hazardous equipment and ductwork 2929 Manifolded exhaust systems versus one fan per hood. 2930 In general, the larger the classified area and the higher the 2931 environmental cleanliness class, the more complex and costly the 2932 HVAC system, both first cost and the ongoing operating cost. 2933 Room HVAC system must be designed as an integrated system in rooms 2934 with fume hoods, biosafety cabinets (BSCs), LEV systems and process 2935 equipment HVAC systems. 2936 Must understand risks associated with various layout and programming 2937 issues (i.e., area electrical classification, blowout panels, SISPQ 2938 risks…) 2939 Special considerations with hydrogen operations 2940 Location of HVAC inlet air and exhaust stacks 2941 Special temperature (or RH) rooms (freezers, chill rooms, stability 2942 storage chambers, R&D suites, etc.) 2943 Use of airlocks to separate areas of different requirements 2944 (cleanliness, pressure, temperature, RH) and their classification 2945 Location and need for access to BMS/EMS data and control; what local 2946 indications and/or control features are needed 2947 Access to field instruments (calibration, testing, and repair) 2948 Special considerations for prefabricated modular construction 2949 Locations of people, processes and product within the space with 2950 respect to HVAC supplies and exhaust/returns 2951 Consideration of equipment heat loads (where is heat generated and 2952 how is it cooled or extracted?) 2953 Locationof utilities connection 2954 2955 3.3 HVAC SYSTEM RISK ASSESSMENT 2956 2957 3.3.1 Introduction 2958 2959 Risk assessment is a process for determining the impact of systems or 2960 components on product SISPQ. Risk assessment is performed by organizing 2961 or dividing the components into systems and evaluating the impact of 2962 those systems/components on Critical Quality Attributes and/or 2963 Parameters. As the components included within a system can 2964 significantly impact results, the definition of system boundaries is a 2965 critical step in a successful risk assessment. 2966 2967 The risk assessment process may be used to determine: 2968 2969 The testing requirements for the system and associated controls 2970 2971 The level of documentation that is appropriate 2972 The components that should be verified (commissioned/qualified) 2973 The necessary level of change control to apply for the system 2974 components 2975 2976 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 70 From a patient safety perspective the key data is typically kept in an 2977 environmental monitoring file to facilitate quality review: 2978 2979 The contents of this file would include as applicable: 2980 2981 Typical HVAC performance parameters that impact CQA/CQP are: 2982 HEPA filter test data 2983 Air change rates/airflow volumes 2984 Area differential pressures 2985 Temperature 2986 Relative humidity 2987 Particle count 2988 Typical HVAC-related room performance parameters which impact 2989 CQA/CQP are: 2990 Clean up & Room recovery time 2991 Total particle count (area classification) 2992 Microbial Viable particulate test results – in air 2993 Microbial Viable particulate test results – swab tests 2994 2995 The ―package‖ of data produced should be critiqued to ensure that it is 2996 adequate to minimize risk to quality. 2997 2998 There are a number of approaches to performing a risk assessment; one 2999 approach is described below: 3000 3001 1.0 Define the Critical Quality Attributes/Parameters (CQA/CQP) for the 3002 area served by the HVAC system, together with the supporting rationale. 3003 Some examples may be: 3004 3005 Humidity is not a critical factor for the product as it is an 3006 aqueous liquid. 3007 3008 Temperature is not a critical factor as the product is contained in 3009 temperature controlled vessels. 3010 3011 Air quality is considered a critical factor – the room supplied is 3012 categorized classified as ISPE Grade 8 because product is exposed 3013 3014 Room pressure differentials are considered a critical factor in 3015 order to maintain the room environment, minimizing the risk of 3016 contamination/cross contamination, because the room is classified 3017 ISPE Grade 8. 3018 3019 2.0 Define system boundaries for HVAC system: 3020 3021 Systems can be organized by components of like type (i.e., system 3022 that is all one type of components, such as only HEPA filters) 3023 3024 Systems can be organized geographically (i.e., at room level) 3025 3026 Systems can be organized by connected components (i.e., an AHU 3027 system) 3028 3029 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 71 Control and monitoring system can be either a separate system, or 3030 may be included as part of another system. 3031 3032 3.0 Define how the Critical Quality Attributes/Parameters (CQA/CQP) are 3033 monitored. Some examples may be: 3034 3035 Humidity is monitored by an independent SCADA based environmental 3036 monitoring system. 3037 3038 Temperature is monitored by an independent SCADA based environmental 3039 monitoring system. 3040 3041 Air quality is monitored by a routine test using a particle counter 3042 to per ISO CEN 14644 for all particles., and microbial 3043 3044 Microbial monitoring for viable particles is tested per local SOP. 3045 3046 Room pressure differentials are monitored by an independent SCADA 3047 based environmental monitoring system 3048 3049 4.0 Define how the Critical Quality Attributes/Parameters (CQA/CQP) are 3050 achieved, and any associated equipment risks of failure and the 3051 probability of detection of those failures. Some examples may be: 3052 3053 Humidity control is achieved by either dehumidifying the air through 3054 cooling below its dew point to remove moisture, or by adding 3055 moisture with a steam humidifier. As humidity is continuously 3056 monitored by a verified system it is considered adequate to 3057 commission the humidifier/dehumidifier system, and maintain it under 3058 engineering change control 3059 3060 Temperature control is obtained through the use of the heating or 3061 cooling coils. As temperature is continuously monitored by a 3062 verified system it is considered adequate to commission the heat 3063 system, and maintain it under engineering change control. 3064 3065 Air quality is obtained through the final HEPA grade filter which is 3066 leak tested annually, with a particle count conducted periodically. 3067 As the HEPA filter integrity is not continuously monitored, and is 3068 directly responsible for this aspect of the system performance it 3069 will be verified and maintained under quality change control. 3070 3071 Room pressure differentials are achieved through the leakage from 3072 and to the conditioned space from adjacent areas and via the HVAC 3073 system balance. As pressure is continuously monitored by a verified 3074 system it is considered adequate to commission the duct/damper 3075 system and maintain it under engineering change control. 3076 3077 Based on the above examples, the equipment to be verified and 3078 maintained under Quality Change Control is therefore shown is a shaded 3079 box in the system drawing shown below: 3080 3081 (Note: the editor has issues with the items shown as being under change 3082 control. Don‘t be surprised if the drawing below changes in the final 3083 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 72 version, as fans and control valves are usually NOT critical devices. 3084 The monitoring systems for airflow, DP, and temperature/RH are. The 3085 shading is in the wrong place, and I can‘t change it.) 3086 3087 3088 3089 3090 Figure 3-2 A Typical schematic of critical devices 3091 3092 Examples of other methods for performing an HVAC risk assessment, 3093 including some typical for risk assessments of HVAC components, are 3094 included in the appendix. 3095 3096 3097 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 73 4 HVAC APPLICATIONS BY PROCESS AND CLASSIFICATION 3098 3099 4.1 INTRODUCTION 3100 3101 There are many types of facilities, each with its own type of HVAC 3102 system, but design philosophies remain the same. The following are key 3103 design steps during the design: 3104 3105 Identify product and process critical HVAC parameters and acceptance 3106 criteria. 3107 Define the type of facility and the operational requirements of each 3108 area within the facility. 3109 Define the design criteria for each area within the facility. 3110 Identify potential paths of product/process contamination and 3111 evaluate risks. 3112 Develop a set of HVAC systems that meets the design criteria with an 3113 appropriate balance of cost and risk. 3114 Provide a means to control the systems so that design criteria are 3115 met. 3116 Assure that the systems meet the design criteria. 3117 3118 Certain parts of a facility may be subject to regulatory compliance. It 3119 is imperative that HVAC systems that affect regulated operations are 3120 designed to an end result that repeatedlymeets the expectations of the 3121 regulatory body. 3122 3123 Air handling systems should be designed to achieve physical separation 3124 in order to prevent cross contamination. Product separation guidelines 3125 should be consulted when determining the boundaries of air handling 3126 systems. Separate air handling units are often used to segregate 3127 different building functions such as production, production support, 3128 warehouse, administration, mechanical areas, etc. Within production 3129 areas, further segregation is often advisable for various unit 3130 operations, e.g., upstream cell culture vs. downstream purification, 3131 pre- vs. post-viral, filling, etc. Manufacturing areas supporting key 3132 unit operations require maximum on-stream reliability. The air handling 3133 units supporting these areas may be configured for partial operation 3134 during routine maintenance operations to support this requirement for 3135 areas still in production. Shutdowns for routine maintenance are 3136 permissible for certain product forms, with classified spaces requiring 3137 continuous service. Therefore, air handling units serving these less 3138 rigorous spaces may be designed accordingly. 3139 3140 4.2 SYSTEM APPLICATIONS 3141 3142 Typical AF&ID (air flow and Instrument diagrams) are included in the 3143 Appendix and referenced in this section. 3144 3145 4.2.1 ISPE Grade 7 or ISPE Grade 8 With local protection or ISPE grade 3146 5 3147 3148 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 74 3149 3150 Figure 4-1 GRAPHIC 3151 3152 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 75 4.2.2 ISPE Grade CNC (Controlled Not Classified) or unclassified 3153 3154 3155 3156 Figure 4-2 Typical Controlled space AF&ID 3157 3158 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 76 4.2.3 LAB 3159 3160 3161 3162 Figure 4-3 Typical Lab AF&ID 3163 3164 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 77 4.2.4 Warehouse: 3165 3166 3167 3168 Figure 4-4 Typical Warehouse AF&ID 3169 3170 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 78 4.2.5 Administrative: 3171 3172 3173 3174 Figure 4-5 Typical Admin area AF&ID 3175 3176 4.3 ROOM LEVEL EXAMPLES 3177 3178 3179 Facility Type System Type Notes Product and Process Requirements API - Wet end Once Through If solvents are present - consider erc EHS Central Station Economics Fixed Balance Airflow Tracking or pressure control are possible Economics Central Filtration Merv 7, 13/14 Economics Draw Through Unless load requires air near dew point Humidification In cold climates for static control EHS 3180 3181 Facility System Type Notes ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 79 Type API - Dry end Once Through If solvents are present - consider erc Recirc is possible with LEL detection, or if no solvents Central Station Fixed Balance Airflow Tracking or pressure control are possible Central Filtration Merv 7, 13/14 Final Filtration HEPA or ULPA for final API steps or potent compound containment Draw Through Unless load requires air near dew point Humidification In cold climates for static control Return or Exh Filtration For potent compounds, cross contamination control or as a dust stop for equip/personnel Grade must be appropriate to paricle size and risk 3182 3183 Facility Type System Type Notes OSD Recirculated Once through may be used for Multi-product or solvent use Central Station Distributed units Distributed units work well for multi-product concurrent Makeup / Recirc Excellent for multi-product concurrent Fixed Balance Airflow Tracking or pressure control are possible Central Filtration Merv 7, 13/14 Draw Through Unless load requires air near dew point Humidification In cold climates for static control Return or Exh Filtration For cross-contamination Control 3184 3185 Facility Type System Type Notes Biologics Recirculated Once through may be used for Multi-product or solvent use Central Station Distributed units Distributed units work well for multi-product concurrent Makeup / Recirc Excellent for multi-product concurrent Fixed Balance Airflow Tracking or pressure control are ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 80 possible Central Filtration Merv 7, 13/14 Final Filtration May be used if CNC / Grade D / ISO 8 or 9 Draw Through Unless load requires air near dew point Humidification /Dehumidificat ion In cold climates for static control / Is common, especially for hygroscopic products. Return or Exh Filtration For cross-contamination Control 3186 3187 Facility Type System Type Notes Aseptic Processing Recirculated Once through may be used for Multi-product or solvent use Central Station Distributed units Distributed units work well for multi-product concurrent Makeup / Recirc Excellent for multi-product concurrent Fixed Balance active pressure control is common Central Filtration Merv 7, 13/14 Final Filtration May be used if CNC / Grade D / ISO 8 or 9. Double for A&B (AHU and Terminal) are not uncommon. Draw Through Unless load requires air near dew point Humidification /Dehumidificat ion In cold climates for static control / Is common, especially for hygroscopic products and micro control, operator comfort and condensation control Return or Exh Filtration For cross-contamination Control 3188 3189 Facility Type System Type Notes Packaging / Labeling Recirculated Once through may be used for Multi-product or solvent use Central Station Distributed units Distributed units work well for multi-product concurrent Makeup / Recirc Excellent for multi-product concurrent Fixed Balance Airflow Tracking or pressure control are possible Central Filtration Merv 7, 13/14 Final Filtration May be used if CNC / Grade D / ISO 8 or 9 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 81 Draw Through Unless load requires air near dew point Humidification In cold climates for static control Return or Exh Filtration For cross-contamination Control 3190 3191 Facility Type System Type Notes Labs Once through may be used for Multi-product or solvent use Central Station Distributed units Distributed units work well for multi-product concurrent Makeup / Recirc Excellent for multi-product concurrent Fixed Balance Airflow Tracking or pressure control are possible Central Filtration Merv 7, 13/14 Final Filtration May be used if CNC / Grade D / ISO 8 or 9 Draw Through Unless load requires air near dew point Humidification In cold climates for static control Return or Exh Filtration For cross-contamination Control 3192 3193 Facility Type System Type Notes sampling and subdivisio n Recirculated Once through may be used for Multi-product or solvent use Central Station Distributed units Distributed units work well for multi-product concurrent Makeup / Recirc Excellent for multi-product concurrent Fixed Balance Airflow Tracking or pressure control are possible Central Filtration Merv 7, 13/14 Final Filtration May be used if CNC / Grade D / ISO 8 or 9 Draw Through Unless load requires air near dew point Humidification In cold climates for static control Return or Exh Filtration For cross-contaminationControl 3194 3195 Facility Type System Type Notes ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 82 Pressure Control Room level active control of supply and/or exh/return to maintain pressure differential Volumetric Airflow Control Room level active control of supply and/or exh/return to maintain flow differential Active Fixed Balance Fixed Balance 3196 3197 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 83 3198 4.4 ACTIVE PHARMACEUTICAL INGREDIENTS (API) - (WET END) 3199 3200 4.4.1 System Schematic (Sample) 3201 3202 3203 3204 4.4.2 System Design Considerations 3205 3206 Bulk biotech products may require area classification (see the 3207 Biopharmaceutical Baseline Guide for requirements) 3208 Air systems should be once through where solvents or potent 3209 compounds are handled. 3210 Air systems may recirculate with the OA necessary to maintain 3211 pressure relationships, in support areas, where no solvents or 3212 potent compounds are handled. 3213 Manufacturing rooms should be fitted with low or combination 3214 high/low returns. 3215 Manufacturing rooms should be protected from migration of 3216 contaminants or solvent vapors via the use of pressure or tracking 3217 differentials. 3218 Where solvents are handled, closed processing or capture exhaust 3219 systems are strongly recommended. Oxygen depletion and LEL monitors 3220 may be employed as appropriate to assure that dangerous conditions 3221 do not occur, especially when recirculated air is used, in 3222 accordance with fire and building codes. 3223 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 84 Provide LEV for dry product addition; drum handling, manways and 3224 spills in wet areas. 3225 Provide LEV for containment devices. 3226 Provide all spark-proof exhaust equipment serving process areas. 3227 Provide explosion proof or intrinsically safe electrical components 3228 in the exhaust air stream. 3229 Heating coils may not be required for systems in warm climates. 3230 Dehumidification and post cooling coils should be considered for low 3231 humidity room control or for facilities with limited cooling 3232 capacity. 3233 Humidification should be considered for cold climates where static 3234 control is a concern. 3235 Risk assessment should be performed to determine need for fan 3236 redundancy (parallel fans or fan walls) 3237 If required, Unidirectional flow hoods (UFH) that have recirculation 3238 should be supplied with a small percentage of fresh air to offset 3239 fan heat. 3240 3241 4.5 ACTIVE PHARMACEUTICAL INGREDIENTS (API) - (DRY END) 3242 3243 4.5.1 System Schematic (Sample) 3244 3245 3246 3247 3248 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 85 4.5.2 System Design Considerations 3249 3250 Oral dosage (―dry‖) product handling areas (i.e. centrifuge, dryer, 3251 blender, mill, pack-off rooms) do not require classified cleanrooms; 3252 however, they should be designed in a manner consistent with ISPE 3253 CNC practices. Areas serving bulk product that will be sterile 3254 products (including bulk Biopharm) should meet ISPE Grade 8. This 3255 corresponds to: HEPA filtration on the inlet air, low returns with 3256 local filtration on the outlet, high-pressure airlock, 3257 instrumentation for verification of room conditions. When in doubt, 3258 final bulk API areas should meet the requirements for dispensing of 3259 API in the finishing facility. 3260 Air systems should be once through where solvents or potent 3261 compounds are handled. 3262 Air systems may recirculate with the minimum Outdoor Air necessary 3263 to maintain pressure relationships, in support areas, where no 3264 solvents or potent compounds are handled. 3265 Manufacturing rooms should be fitted with low or combination 3266 high/low returns. 3267 Manufacturing rooms should be protected from migration of 3268 contaminants or solvent vapors via the use of pressure or tracking 3269 differentials. 3270 Where solvents are handled, 100% exhaust (once-through) systems are 3271 strongly recommended. Oxygen depletion and LEL monitors may be 3272 employed as appropriate to assure that dangerous conditions do not 3273 occur, especially when using recirculated systems. Such systems 3274 should also comply with fire and building codes. 3275 Provide LEV for dry product addition; drum handling, manways and 3276 spills in wet areas. 3277 Provide LEV for any containment devices. 3278 Provide spark-proof exhaust equipment serving process areas. 3279 Provide explosion proof or intrinsically safe electrical components 3280 in the exhaust air stream. 3281 Heating coils may not be required for systems in warm climates. 3282 Dehumidification and post cooling coils should be considered for low 3283 humidity room control or for facilities with limited cooling 3284 capacity. 3285 Humidification should be considered for cold climates where static 3286 control is a concern. 3287 Risk assessment should be performed to determine fan redundancy 3288 (parallel fans or fan walls) 3289 Unidirectional flow modules (LFU) that have recirculation should be 3290 supplied with a small percentage of fresh air to offset fan heat. 3291 3292 4.6 BIOLOGICS 3293 3294 4.6.1 System Schematic (Sample) 3295 3296 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 86 3297 3298 4.6.2 System Design Considerations 3299 3300 See requirements for API above. Also refer to the ISPE 3301 Biopharmaceutical Facility Baseline Guide for area classification 3302 requirements. 3303 3304 4.7 ORAL SOLID DOSAGE (NON-POTENT COMPOUNDING) 3305 3306 4.7.1 System Schematic (Sample) 3307 3308 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 87 3309 3310 4.7.2 System Design Considerations 3311 3312 Further discussion for Oral Solids Dosage facilities is covered in 3313 the ISPE Baseline Guide for OSD. 3314 Oral dosage facilities do not require areas with assigned 3315 cleanliness classifications. 3316 Process and process support areas, however, require critical 3317 parameters to be controlled and maintained to protect the product 3318 from contamination, whether from another product in a multi-product 3319 facility or from external or personnel contamination. 3320 Low returns in CNC (w/local monitoring) areas are recommended and 3321 should be located behind process equipment where applicable and 3322 where clearance is sufficient to allow proper air extraction from 3323 the space. CNC (airflow filtration with access control) areas do not 3324 require low level returns but can be used if deemed necessary by the 3325 design team. 3326 AHU filtration – min 30% followed by 85% filtration is recommended. 3327 Final filtration - 95% DOP efficiency is recommended in exposed Oral 3328 Solid Dose and dry bulk (non-Aseptic) product areas, but terminal 3329 HEPA filters may be more practical. Where terminal HEPA filters are 3330 employed for cross-contamination control, 95% pre-filtration will 3331 maximize terminal filter life. 3332 HEPA filtration may be considered to prevent cross-contamination and 3333 limit operator exposure in all recirculation systems. 3334 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 88 Non-recirculation systems do not require HEPA filtration for cross-3335 contamination control. 3336 All return or exhaust air grilles should be equipped with 30% ―dust 3337 stop‖ filters. 3338 Recirculation systems may be applied in multi-product areas, where 3339 solvents are not present. 3340 Recirculation of room air is not recommended whensolvents are 3341 present. Recirculation of room air is not allowed when solvents may 3342 be present above 25% of LEL.. Where solvents are occasional and in 3343 small volume, return air duct should be equipped with hydrocarbon 3344 sensors to switch the system to 100% outdoor air in the event of a 3345 spill. 3346 Recirculation of return air from production areas to supply non-3347 production areas without treatment is not acceptable. 3348 Cleanliness of open processing areas should be maintained via 3349 control of airflow between product handling area or airlock and 3350 surrounding spaces. 3351 Isolation via airflow from a clean airlock (pressure bubble or 3352 pressure sink) or corridor into the area of highest contamination is 3353 strongly recommended. Where solvents are used, this configuration is 3354 required. 3355 Monitoring and alarming of direction of airflow (through 3356 differential pressure, hotwire velocity sensors, or flow tracking) 3357 to surrounding rooms is strongly recommended. 3358 Airflow and makeup air delivery should be directed to flow from the 3359 operator‘s breathing zone and the room entrance, toward the source 3360 of airborne dust. 3361 Non-aspirating diffusers are recommended to minimize air 3362 disturbances, eddies and re-entrainment of dust. 3363 Provide LEV for control of fugitive emissions at open operation or 3364 equipment break point. 3365 LEV for open operation should be designed and engineered according 3366 to ACGIH standards. 3367 Recirculation of LEV exhaust within a production room requires HEPA 3368 filtration. Consult the ACGIH Ventilation Manual decision analysis 3369 and design criteria for guidance on when recirculation is 3370 acceptable. 3371 Recirculation of LEV exhaust to the AHU is not acceptable. 3372 Filtration of LEV through HEPA filters, scrubbers, or other 3373 equivalent treatment methods prior to release outdoors is required. 3374 For operations that generate or have the potential to generate 3375 active dusts or aerosols – LEV must be provided at all emission 3376 points. Leak free connections are recommended. 3377 A testing and preventative maintenance program will ensure the 3378 integrity of HEPA filtration system and LEV performance. 3379 Dust collection systems designed to allow removal of contaminated 3380 media without contact or exposure with these compounds (e.g. bag 3381 in/bag out HEPA filters) should be considered. 3382 Heating coils may be required for systems in cold climates with 3383 higher percentages of outside air. 3384 Dehumidification and post cooling coils should be considered for low 3385 humidity room control or for facilities with limited cooling 3386 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 89 capacity. 3387 Humidification should be considered for cold climates where static 3388 control is a concern. 3389 Risk assessment should be performed to determine the need for fan 3390 redundancy (parallel fans or fan walls) 3391 Unidirectional flow hoods (UFH) that have recirculation should be 3392 supplied with a small percentage of fresh air to offset fan heat. 3393 3394 4.8 ORAL SOLID DOSAGE (POTENT COMPOUNDING) 3395 3396 4.8.1 System Schematic (Sample) 3397 3398 3399 3400 4.8.2 System Design Considerations 3401 3402 Potent OSD facilities should follow the guides above for OSD, with the 3403 following exceptions 3404 3405 A minimum, filtration of ASHRAE 85% (MERV 13 or 14) shall be 3406 provided to the Supply Air if 100% once-through. 3407 Closed containment is the primary means of control for this class of 3408 material. If processes are proven closed, recirculated air should 3409 include HEPA filtration. 3410 Local Exhaust Vents (LEV) should be provided at points in which 3411 containment is broken and as needed, in conjunction with other 3412 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 90 technologies. 3413 LEV should be used for solvent extraction only where containment is 3414 not technically feasible (i.e. maintenance activities, etc.). Where 3415 LEV is used with any possibility of duct contamination, HEPA filters 3416 should be installed near the room, before the AHU. 3417 Isolation via active control of direction of airflow (using 3418 differential pressure, hotwire velocity sensor, or flow tracking) 3419 into the area of highest contamination from surrounding areas is 3420 strongly recommended. 3421 Monitoring and alarm of direction of airflow is required. Alarms 3422 should be recorded at a manned workstation (control room or 3423 maintenance center). 3424 Audio and visual alert on loss of airflow containment should be 3425 transmitted to the controlled space 3426 Room air locks/anterooms are recommended for powder handling areas 3427 to provide a barrier that maintains a positive airflow differential 3428 with respect to the corridor and the processing room (this may also 3429 serve as a gowning area). 3430 Airflow into de-gowning areas should be negative with respect to the 3431 corridor and processing area to contain particles shed from 3432 clothing. 3433 A secondary control against the spread of active materials is 3434 direction of airflow within the room. Supply air should be directed 3435 to flow across the operator‘s breathing zone before crossing the 3436 source of dust. Wherever possible, supply air should be directed to 3437 flow from a location near the room entrance toward the source of 3438 dust and finally out low returns mounted on the far wall. 3439 A dedicated HVAC system is recommended for the controlled area. 3440 It is strongly recommended that any air leaving the processing room 3441 boundary NOT be recirculated. Design main air systems for 100% 3442 exhaust, once-through supply. However if air recirculation within 3443 the controlled area is required, – employ double HEPA filtration 3444 (supply and return) combined with semiannual filter integrity test. 3445 Recirculation of air from the controlled space into other areas is 3446 not acceptable. 3447 Recirculation of local exhaust (LEV) from equipment is not 3448 acceptable. 3449 Filtration of exhaust from dry product handling areas and LEV 3450 through HEPA filters, scrubbers, or other equivalent treatment 3451 methods prior to release outdoors is required. 3452 It is recommended that exhaust/return filters be located as near to 3453 processing area as possible to reduce length of potentially 3454 contaminated air ducts. 3455 Where containment equipment is provided and PPE is not required, 3456 HEPA filters are intended to protect the AHU and facility in case of 3457 an accidental release. These should be a room-accessible type – Bag-3458 In/Bag-Out is not required, PPE can be used for change-out if 3459 needed. 3460 Exhaust/Return HEPA filters not located within the room, or where 3461 airborne powders are expected, should be safe-change type with BI/BO 3462 housing and bubble tight dampers. 3463 Terminal HEPA supply filters are required for protection against 3464 backflow if product containment should fail during AHU failure. 3465 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 91 A testing and preventative maintenance program to ensure the 3466 integrity of HEPA filtration systems is required, on no less than an 3467 annual basis. Filters on processes requiring PPE should be tested 3468 more frequently. 3469 Appropriate monitoring and interlocking with process equipment 3470 should be considered to maintain containment integrity and to 3471 control cross contamination and emissions. 3472 3473 4.9 ASEPTIC PROCESSING FACILITY 3474 3475 4.9.1 System Schematic (Sample) 3476 3477 3478 3479 4.9.2 System Design Considerations3480 3481 Considerable background on the design of HVAC systems is covered in 3482 the ISPE Baseline Guide for Sterile Manufacturing Facilities. 3483 Eliminate contamination introduced through the air conditioning 3484 supply system by utilizing properly installed and integrity tested 3485 ceiling mounted terminal HEPA filters. 3486 Minimize infiltration of contamination from uncontrolled areas by 3487 the use of room pressure differentials and airlocks between air 3488 classes. 3489 Continuous room pressure monitoring with alarms and recording 3490 devices that indicate out of spec conditions are recommended. 3491 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 92 Consider automatic pressure controls to keep the spaces within 3492 specified pressure limits where process exhausts change, or where 3493 door and hatch are frequently opened or door seal integrity varies. 3494 Dehumidification and post cooling coils should be considered for low 3495 humidity room control. 3496 A dedicated air handling system is recommended, serving only the 3497 aseptic area and remaining operational for required pressure control 3498 when the main building systems are shut down during unoccupied 3499 periods. 3500 HVAC systems for classified spaces should operate 24hours/day – 7 3501 days/week. 3502 Risk assessment should be performed to determine the need for fan 3503 redundancy (parallel fans or fan walls) Consider utilizing standby 3504 electric power generating systems to maintain fans and design 3505 pressure differentials in the event of local power failures. 3506 The air handling system should be of the constant volume terminal 3507 reheat type utilizing industrial grade equipment. 3508 Ductwork should be designed per SMACNA standards but in no case 3509 should it be constructed for less than 4" water gauge duct static 3510 pressure and seal Class "A". 3511 Ductwork should be galvanized steel except where exposed (to a 3512 minimum extent) in production areas or subject to moisture, in which 3513 case it should be a minimum 304 stainless steel with cleanable 3514 finish. Cleaning materials used in the room should be considered. 3515 Silencers are not recommended as they can harbor contaminants and 3516 viable organisms. 3517 The supply fan should be equipped with dampers, vanes or speed 3518 controls which can be reset in order to maintain design airflow for 3519 the life of the air filters (whose pressure drop increases with 3520 time). 3521 Air to an aseptic area should be supplied through ceiling mounted 3522 terminal HEPA filters. These terminal HEPA filters become part of 3523 the aseptic boundary and protect the room from outside 3524 contamination. The use of only remote bank mounted HEPA filters in 3525 the supply duct is not recommended. Access ports to introduce and 3526 monitor PAO (aerosol) challenge materials upstream on the non-3527 aseptic side of the HEPA diffusers are suggested for filter 3528 integrity testing. 3529 Air supplied through ceiling mounted terminal HEPA filters should be 3530 returned at floor level through multiple return duct drops. Return 3531 air to the recirculation unit should be filtered through 30% ASHRAE 3532 pleated and 85% or 95% ASHRAE bag filters to extend HEPA filter 3533 life. Recirculation HEPA/fan units mounted below the ceiling are not 3534 recommended as they require service within the aseptic area, do not 3535 normally utilize low returns, and lack adequate pre-filtration. 3536 The return air openings in the aseptic area should be located near 3537 the floor, preferably on at least two (2) walls and along the long 3538 dimensions of the room to ensure maximum uniformity of airflow. More 3539 return openings are better than too few. 3540 Differential air pressure should be employed to minimize 3541 infiltration of contaminants from outside the controlled area. The 3542 aseptic area should be designed for a positive pressure with all 3543 doors closed in relation to less clean adjacent areas outside the 3544 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 93 controlled area (refer to latest issue of Federal Standard 209). 3545 Gowning areas should be supplied with air and maintained at a 3546 negative pressure relative to the controlled aseptic area and at a 3547 positive pressure relative to the outside and uncontrolled areas. 3548 Differential pressures are measured ACROSS airlocks (see the ISPE 3549 Baseline Guides for Sterile and Biopharm Facilities.) 3550 Each area should have an air supply and return with dampers to 3551 permit proper balancing. The room layout of the aseptic suite will 3552 dictate the pressure relationships to be maintained. The room with 3553 exposed product is to be maintained most positive; while ante rooms 3554 leading to this room are to be maintained successively less positive 3555 down to the zero reference level of uncontrolled areas (the general 3556 building). Only high-pressure Grade 7airlocks that have HEPA 3557 filtered supply air may have pressures higher than the aseptic 3558 filling room. A control range should be established for each room 3559 pressure level such that the pressure can float within the range and 3560 still satisfy the specified differentials. 3561 A remotely operated or automatic damper may be provided in the 3562 return air duct from each room as a means of obtaining and setting 3563 the established pressure differentials. Simple facilities may be 3564 successfully balanced using only manual dampers, especially if 3565 terminal HEPA filters do not load quickly. 3566 If manual / remotely operated dampers are used, the remote damper 3567 controls should be tamper-proof or concealed in a lockable cabinet 3568 accessible to authorized personnel only. A differential pressure 3569 gauge should be provided for each room adjacent to the remote damper 3570 controls. 3571 The manual/remote gauges and controls or automatic controls should 3572 be mounted in a common panel outside the controlled area. An audible 3573 alarm may be provided to indicate loss of area pressure control. 3574 This alarm may be manual reset type and equipped with a hard copy 3575 printout that indicates the out-of-range alarm. 3576 Unidirectional airflow serves as a barrier between product and 3577 microbial and particulate contamination generated by the equipment 3578 and personnel within the aseptic area. Where possible, terminal HEPA 3579 filters should be located directly over the exposed product, 3580 components and equipment that are not protected by UFH. 3581 When the central system air conditioning air quantity required to 3582 maintain room conditions is not sufficient to provide protection 3583 over the product, components, and equipment, a supplemental HEPA 3584 filtered air recirculating system may be employed. Because all of 3585 the cooler central system conditioned air is not supplied over the 3586 equipment, it may be distributed to the area in a checkerboard 3587 fashion or into the local recirculating fan inlet to maintain room 3588 temperature. The engineer should consider the heat generated from 3589 the local recirculating system fan motor. This particular oversight 3590 is quite common and can lead to serious temperature stratification 3591 and overheating in the aseptic area. 3592 Airflow patterns within the work space may be uniform with minimum 3593 turbulence. Ambient air may not aspirate into the work areas along 3594 the perimeter of the unidirectional airflow barrier. The heights and 3595 filter area should deliver Class 100 air at a velocity of 90 feet 3596 (27.5 meters) per minute, with uniformity within plus or minus 20%, 3597 measured at the filter face. Velocity at the work height shouldalso 3598 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 94 be measured. The optimal filter face velocity should be determined 3599 during qualification of the UFH using airflow visualization (―smoke 3600 testing‖). See the ISPE Sterile Baseline Guide. 3601 Room temperatures should be controlled by maintaining constant 3602 airflow and modulating a heating coil. Systems in which varying flow 3603 is used as a means of controlling room temperatures are unacceptable 3604 because of their adverse effects on room pressures. 3605 Where low relative humidity is required, special attention may be 3606 given to sealing the return duct systems to prevent inward air 3607 leakage from uncontrolled areas and resultant high humidity. 3608 3609 4.9.3 Aseptic Potent Compounds: 3610 3611 Processes should be contained in isolators, with dedicated HVAC for 3612 the containment enclosure. 3613 Where the process leaks into the room, protect the HVAC system and 3614 other rooms on the system from hazardous compounds by utilizing non-3615 recirculating primary air conditioning systems. 3616 The exhaust or return air ducts must be fitted with HEPA filters 3617 protected from physical damage with a pre-filter or equivalent. 3618 These filters should be located within the room where they can be 3619 serviced by properly gowned and protected personnel. 3620 If filters are located remote from the room where open processing 3621 occurs, they should be housed in a high containment bag-in/bag-out 3622 filter housing and identified as such. These filters contain the 3623 potentially hazardous compounds and minimize particulate "fall back" 3624 during fan failure. 3625 Gowning areas shall be supplied with air and maintained at a 3626 negative pressure relative to the controlled aseptic area and at a 3627 positive pressure relative to the uncontrolled areas. The gowning 3628 area should be separated from the aseptic filling room by a high 3629 pressure airlock. 3630 The de-gowning area must be separated from the aseptic filling room 3631 by a low pressure airlock. The de-gowning room shall be maintained 3632 negative relative to adjacent spaces on the uncontrolled side. 3633 Material entering the aseptic filling room must be transferred via a 3634 HEPA filtered, high pressure tunnel, box or sterilizer. Material 3635 leaving the aseptic filling room must be transferred via a low 3636 pressure tunnel or box. 3637 3638 4.10 PACKAGING/LABELING 3639 3640 4.10.1 System Schematic (Sample) 3641 3642 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 95 3643 3644 4.10.2 System Design Considerations 3645 3646 See the PACLAW Baseline Guide for product requirements. 3647 Most products require a clean area for packaging, with HVAC meeting 3648 CNC. 3649 Heating coils may be required for systems in cold climates with 3650 higher percentages of outside air. 3651 Dehumidification and post cooling coils should be considered for low 3652 humidity room control. 3653 Humidification should be considered for cold climates where static 3654 control is a concern. 3655 Return fan and mixing sections may not be required for areas with no 3656 pressure requirements, small local exhaust fans may be considered. 3657 3658 4.11 LABS 3659 3660 4.11.1 System Schematic (Sample) 3661 3662 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 96 AMD HOOD AMD Infiltration + Supply = Exhaust Infiltration ExhaustSupply LAB NOTE: An arbitrary value for INFILTRATION is chosen, then SUPPLY is adjusted to track exhaust. If supply is insufficient to satisfy room heat load, more exhaust (EX2) may be needed. AMD=Airflow Monitor EX2 Hood flow control 3663 3664 Figure 4-12 Typical Lab HVAC schematic 3665 3666 4.11.2 System Design Considerations 3667 3668 Further information on Labs for Quality Control is included in the 3669 ISPE Baseline Guide for Quality Labs. 3670 Laboratories using volatile solvents or radioisotopes should be 3671 negative (commonly via airflow tracking) relative to corridors, 3672 offices and adjacent occupied space. Air from offices or technical 3673 spaces adjacent to laboratories should transfer into the laboratory. 3674 Classified clean lab spaces should be positive (via airflow 3675 tracking) relative to corridors, offices and adjacent occupied 3676 space. Provide a high pressure airlock where activities in 3677 positively pressurized spaces pose a threat to corridor air quality. 3678 Where chemicals or other hazardous materials are handled, air 3679 systems should be one hundred percent (100%) exhaust. Recirculation 3680 of this laboratory air is not acceptable. 3681 Variable Volume Airflow Control Systems are recommended for 3682 increased safety through monitoring capabilities and decreased 3683 energy usage (using hood diversity and variable flow). 3684 Where the minimum ventilation rate (for building or fire code) is 3685 greater than the total exhaust from hoods, VAV is NOT recommended. 3686 Diffusers should be non-aspirating type selected and located to 3687 minimize velocity & turbulence near the hood face; design cross 3688 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 97 drafts should not exceed 30 FPM within 24 inches of the hood 3689 opening. 3690 100% outside air handling units are prone to stratification; use 3691 variable temperature constant internal flow volume pumped preheat 3692 coils or blenders to limit this effect. Provide propylene glycol 3693 solution, IFB coils or a reliable, alarmed, pumped chilled water 3694 coil to prevent freeze-ups. 3695 Silencers can help decrease noise from properly sized exhaust 3696 manifold valves. Use packless type for chemical exhaust applications 3697 located between the box and hood. 3698 Do not oversize VAV boxes. Oversized boxes yield poor airflow 3699 control and have a limited range. 3700 As a minimum exhaust fans should be AMCA Type B spark resistant 3701 construction. 3702 Galvanized exhaust ducts, boxes and attenuators should be used 3703 except where process or research activity requires special corrosion 3704 resistance. Laboratory hood exhaust ducts and accessories which are 3705 inaccessible should be stainless steel (304). Laboratory hood 3706 exhaust ducts which handle large quantities of acids should be high 3707 grade stainless steel, Hastelloy, FRP or other suitable material 3708 (stainless steel will corrode rapidly in the presence of high molar 3709 concentrations of Hydrochloric Acid). 3710 The use of dilution air to maintain stack velocity is not 3711 recommended. The exhaust from most chemical laboratories is 3712 primarily composed of air. Maintain 10'-0" minimum stack height 3713 above building roof; although a stack height equal to 30% of the 3714 building height is preferred. If necessary, use variable geometry 3715 stacks (not Strobic fans) to maintain velocity at reduced airflows. 3716 Locate stacks to avoid re-entrainment of air into HVAC (considering 3717 the prevailing winds). 3718 VAV systems should be sized with a diversity factor to allow for 3719 savings in airflow and first cost of central heating and cooling 3720 equipment. A factor of 70% of installed load is common; however, the 3721 diversity factor must take in to account the anticipated hood use. 3722 If 50% sash height is considered as full flow, do not use a further 3723 diversity factor. 3724 Hard connect exhaust wherever possible. Provide positionable arms 3725 (such as Plymovent or Alsident) for point exhaust sources which do 3726 not support hard duct connections. These supplemental point exhausts 3727 should be served by an independent exhaust box (where possible) or 3728 connecteddirectly to the main (with a volume damper or blast gate). 3729 A general room exhaust should only be provided when the hood flows 3730 at minimum sash position provides an air change rate less than that 3731 required to meet heat loads or the specified minimum air change 3732 rate. 3733 Air change rate or exhaust quantity will usually dictate the supply 3734 air quantity. Exhaust quantities should be reset upward when 3735 additional cooling is required. 3736 Mount VAV lab controls in accessible panels either flush in alcove 3737 outside lab, or in dedicated room. 3738 Manifolded exhaust systems are preferred except for perchloric acid 3739 hoods. 3740 Use of energy conserving enclosures such as glove boxes is 3741 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 98 encouraged. 3742 Exhaust ductwork does not normally require insulation. 3743 Approved exhausted chemical storage cabinets should be provided for 3744 solvents and hazardous materials. 3745 Recover heat from laboratory utility equipment wherever possible. 3746 Provide temperature alarms on refrigerators or freezers. Where 3747 critical, connect these to the BAS. 3748 Where laboratory offices are on the exterior wall, heating at the 3749 perimeter wall is recommended. 3750 The use of emergency power for exhaust systems should be considered 3751 on a case-by-case basis. In multi-fan manifolded systems the use of 3752 emergency power for at least one fan should be considered. 3753 Where emergency power is not provided for exhaust fan(s) the hood 3754 alarms should be connected to emergency power or furnished with UPS 3755 to signal exhaust failure. 3756 Supply Air Filtration - 30% ASHRAE and 85% ASHRAE (in series) 3757 Exhaust Air Filtration - None (where energy recovery is employed 30% 3758 ASHRAE filters are required). Scrubbers may be required for some 3759 dedicated hoods. 3760 3761 4.11.3 Vivarium: 3762 3763 Vivarium facilities should consist of individual suites, each 3764 capable of maintaining its own "microenvironment", for the duration 3765 of the product study. 3766 A system for control of room airflows and relative pressurization 3767 should be provided. Actual set points and directions of flow are 3768 dependent upon the operating plan of the space and must be 3769 determined on a case-by-case basis. 3770 Ceiling-mounted non-aspirating diffusers, coupled with a minimum of 3771 two (2) low returns on opposite walls with hinged stainless steel 3772 grilles fitted with dust stop filters behind the grille, should be 3773 employed and should be arranged so as to minimize cross- 3774 contamination between subjects and between researchers and subjects. 3775 The axis of the non-aspirating diffuser radial fins should be 3776 parallel with the wall containing the low exhaust registers. 3777 Slope exhaust air grille back box and provide weep holes so that 3778 wash down water that might be sprayed into the system will drain 3779 back to the room. 3780 Humidity control should be provided for each room adjustable to a 3781 set point between fifty and sixty percent (50-60%), plus or minus 3782 ten percent (+/- 10%) RH of set point. Humidifiers utilizing clean 3783 steam should be provided centrally to maintain forty percent (40%) 3784 RH with ―trim‖ humidifiers capable of an additional thirty percent 3785 (30%) at each room. In colder climates, provide humidifiers in two 3786 locations within the AHU to allow the large amount of moisture to be 3787 added gradually, i.e., two thirds / one third. 3788 Temperature regulation should be provided for each room adjustable 3789 to set point using terminal individual reheat. 3790 Temperature, humidity and airflow transmitters should be located 3791 outside the room, in exhaust ductwork whenever possible. Edstrom and 3792 ATC sensors should be located adjacent to one another if possible. 3793 HEPA filtration of room supply and exhaust air may be required, 3794 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 99 subject to researcher and CDC/NIH requirements. 3795 Air systems should employ one hundred percent (100%) OA supply and 3796 one hundred percent (100%) exhaust. 3797 Supply systems should employ 95% PAO final filtration (minimum MERV 3798 Rating = 15) at the AHU to minimize contamination entering the 3799 building. 3800 Exhaust systems should employ a minimum of 30% ASHRAE certified 3801 filters (minimum MERV Rating = 8) in room with provisions for carbon 3802 and HEPA filters to be provided in the future at a central location, 3803 if required. 3804 Duct construction within rooms should be cleanable and concealed 3805 wherever possible. Exposed ductwork should be Type 304 stainless 3806 steel with Type 4 finish (Owner approval required). Concealed 3807 exhaust ductwork from grille to above the ceiling should be 304 3808 stainless steel. 3809 Air systems should have back up capacity to provide required room 3810 conditions and air change rates in the event of a power or equipment 3811 failure. 3812 Back-up refrigeration capacity may also be required and is 3813 contingent upon research requirements. (Risk assessment) 3814 Room airflow and temperature/RH set points should default to minimum 3815 when the room is vacant (no animals in residence), however, room 3816 differential flows must remain intact even when a room is 3817 unoccupied. 3818 Air filtration must be accessible for replacement without shutdown 3819 of HVAC. Secondary filters should be installed prior to the reheat 3820 coil, to be replaceable with minimum disturbances to the space. 3821 If furnished with HEPA filters, provide a means for introducing PAO 3822 and performing filter integrity testing on a room-by-room basis. 3823 3824 4.12 SAMPLING/DISPENSING 3825 3826 4.12.1 System Schematic (Sample) 3827 3828 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 100 3829 3830 4.12.2 System Design Considerations 3831 3832 Specific product requirements are in the appropriate Baseline Guide. 3833 Once through air may be used for multi-product or solvent use. 3834 Heating coils may be required for systems in cold climates with 3835 higher percentages of outside air. 3836 Dehumidification and post cooling coils should be considered for low 3837 humidity room control. 3838 Humidification should be considered for cold climates where static 3839 discharge control is a concern. 3840 Risk assessment should be performed to determine the need for fan 3841 redundancy (parallel fans or fan walls) 3842 Unidirectional flow modules (LUFH) that have recirculation should be 3843 supplied with a small percentage of fresh (or cooled) air to offset 3844 fan heat. 3845 Return fan and AHU mixing sections may not be required for areas 3846 with no pressure requirements, small local exhaust fans may be 3847 considered. 3848 3849 4.13 ADMINISTRATIVE AND GENERAL BUILDING 3850 3851 4.13.1 System Schematic (Sample) 3852 3853 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 101 3854 3855 4.13.2 System Design Considerations 3856 3857 Heating coils may be required for systems in cold climates with 3858 higher percentages of outside air. 3859 Humidification should be considered for cold climates where static 3860 control is a concern. 3861 Return fan and mixing sections may not be required for areas with no 3862 pressure, small local exhaust fans may be considered. 3863 3864 4.14 WAREHOUSE 3865 3866 4.14.1 System Schematic (Sample) 3867 3868 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 102 3869 3870 4.14.2 System Design Considerations 3871 3872 See the PACLAW Baseline Guide for furtherinformation. 3873 Many warehouse facilities do not have central air handling, using 3874 only unit heaters. Be sure that air outlets do not overheat high 3875 stacked material. 3876 Heating coils may be required for systems in cold climates with 3877 higher percentages of outside air. 3878 Humidification should be considered for cold climates where static 3879 control is a concern. 3880 Return fan and mixing sections may not be required for areas with no 3881 pressure, small local exhaust fans may be considered. 3882 Mapping of temperature extremes in high bay warehouses is 3883 recommended. 3884 3885 4.15 PROCESS EQUIPMENT CONSIDERATIONS 3886 3887 In many cases there are specific requirements for equipment, or aspects 3888 to consider when looking at the HVAC design for the area containing 3889 equipment. 3890 3891 4.15.1 Dust extract systems 3892 3893 Where there is a common dust extract system there are a number of 3894 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 103 aspects to consider in the design: 3895 3896 What happens if the unit fails? 3897 3898 Does the unit have a damper that closes, preventing air leaving the 3899 system – is the pressure difference between the rooms served by the 3900 system adequate to obtain flow – with a consequential risk of cross 3901 contamination? 3902 3903 How does the unit clean? 3904 3905 Some units are cleaned by a shaker mechanism, others use a pulse of 3906 compressed air – during this pulse, which is in the opposite 3907 direction to the normal airflow the extract air flow can halt , or 3908 even reverse for a short period, - is this acceptable? 3909 3910 It should be noted that one of the advantages of a remote system (be 3911 it a common or dedicated system) is that the system heat gain is 3912 outside the room, also the extract is often located near an area 3913 where the equipment heat gain is high, so those gains are extracted 3914 from the room, reducing the load on the area HVAC system. 3915 3916 4.15.2 Granulators/Coaters/Fluid Bed Dryers 3917 3918 These units typically have dedicated air handling systems that are 3919 independent of the area HVAC. The design should consider what happens 3920 during periods of non use – is there potential for moisture to migrate 3921 from the outside environment into the system, if the outside is high 3922 humidity. 3923 3924 What are the risks of corrosion during use – what ductwork materials 3925 should be used? 3926 3927 What areas of the duct are pressurized - what is the risk of drawing 3928 in untreated air – what is the risk of potentially contaminated (with 3929 product) air leaking out? 3930 3931 4.15.3 Glassware depyrogenation tunnels 3932 3933 These units present a challenge to the HVAC system designer, as they 3934 are generally located between rooms with different area classifications 3935 (grades) and they operate intermittently, yet area pressure 3936 differentials are typically help at a consistent level – this usually 3937 means some type of active pressure control. (it should be noted that 3938 with the increasing use of risk analysis to determine areas of 3939 patient/product risk, there may be opportunities to reduce the room 3940 differential pressures during periods of no production). 3941 3942 As the units are started up, and the temperatures /volumes stabilize 3943 there is a dynamic period in terms of changing airflow. 3944 3945 4.15.4 Isolator systems 3946 3947 Barrier-isolator technology may be applied to certain processes where 3948 aseptic processing and/or containment of hazardous materials are 3949 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 104 required. 3950 3951 Using Isolator technology for aseptic processing and/or containment of 3952 hazardous material will reduce the exposure of operators and product to 3953 the operators to disinfection and fogging chemicals that would normally 3954 be used in the aseptic processing suite of a conventional cleanroom. 3955 3956 Isolators should be automatically decontaminated by Vapor Phase 3957 Hydrogen Peroxide and then aerated to achieve concentrations of VHP 3958 that are less than one part per million. This operation should take 3959 place within the isolator so that there is no operator exposure to the 3960 VHP. The outside room should be monitored by VHP sensors as a further 3961 safety measure. 3962 3963 Monitoring for particulate and viable particles should be done within 3964 the isolator. The isolator air handling unit obtains supply air from 3965 the surrounding room and during different modes of operation returns to 3966 either the room or exhausts to the roof. 3967 3968 For aseptic processing of non-potent products, intake air during 3969 production mode should be taken from the room and returned back to the 3970 room, while during aeration mode air should be taken from the room and 3971 exhausted through an independent exhaust air system. For potent 3972 compounding, intake air during production and aeration should be taken 3973 from the room and exhausted through an independent exhaust air system. 3974 3975 Air velocity during production is maintained to +/-20% of the average 3976 airflow, and is delivered from the HEPA air filter at a rate of 90 fpm 3977 (0.45 meters/sec) (measured at 12‖ or 300mm (nominal) below air filter 3978 face or air inlet diffuser (CG membrane or equivalent). Reduced air 3979 speed may be used during H2O2 bio-decontamination. 3980 3981 Fresh air is provided to the inlet of the HEPA filter. Air is 3982 recirculated from isolators chamber back to isolators plenum should be 3983 ducted by internal double glass windows or doors. A differential 3984 pressure device with display and alarming capabilities monitors the 3985 differential pressure between the internal zone (filter plenum) and the 3986 outside room pressure. 3987 3988 The air classification required for the background environment depends 3989 on the design of the isolator and the application. Room cooling loads 3990 for spaces in which isolators are located must take into account the 3991 heat generation by the isolator fan system(s). The most common agent 3992 for decontamination of isolators is vaporized hydrogen peroxide (VHP). 3993 Consideration should be given to treatment, e.g., catalytic converter, 3994 etc., of VHP gas prior to discharging to ambient at the end of the 3995 sterilization cycle. 3996 3997 Fresh air make-up from the surrounding room should pass through HEPA 3998 filters via the isolator. Exhaust air from VHP sterilization should 3999 have a scrubber or VHP neutralization. HEPA filters should be readily 4000 changeable from outside the Isolators. 4001 4002 Each zone will have access ports upstream the HEPA filtration to allow 4003 for introduction of DEHStest aerosol for filter integrity testing. 4004 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 105 Filter faces shall be accessible with the fans operational forfilter 4005 integrity scanning. 4006 4007 The temperature control of all zones is provided by a cooling system of 4008 the intake air taken out of the room. A temperature measuring 4009 transmitter with display and alarming capabilities will control and 4010 monitor temperature. 4011 4012 4013 4014 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 106 5 DESIGN QUALIFICATION / DESIGN REVIEW (DQ/DR) 4015 4016 5.1 DESIGN REVIEW/ DESIGN VERIFICATION/DESIGN QUALIFICATION 4017 4018 There is one important thing to remember about design reviews – it is 4019 far easier and cheaper to change a design before it is constructed, 4020 than during or after construction. 4021 4022The process of reviewing a design (drawings and specifications) as it 4023 develops from concept to issue for construction status has a number of 4024 objectives: 4025 4026 To ensure that the design follows the clients preferred custom and 4027 practice 4028 To ensure that the design will perform to meet client expectations 4029 To ensure that the concepts proposed are capable of performing to 4030 meet the requirements defined in the User Requirement Specification 4031 (URS) in the clients opinion. 4032 To ensure that the design minimizes risk to product quality / 4033 patient. 4034 To ensure that the design is robust and will perform reliably 4035 To ensure that the design proposed is cost effective. 4036 4037 For systems able to affect product quality it is common practice to 4038 split these design reviews into two categories – (although this is not 4039 mandatory): 4040 4041 Engineering reviews 4042 4043 Quality (or GMP) focused reviews 4044 4045 Similarly it is common to perform a final specific ―quality‖ review to 4046 confirm that the system (and the specified related conditions for area 4047 it serves – Temperature, Humidity, Particle Classification, 4048 Differential Pressures etc.) comply with GMP regulations/company 4049 standards – this review may be called ―Design Qualification‘, or 4050 ―Design Verification‖, allowing the statement to be formally made that 4051 –―the design is fit for its intended purpose‖, as well as confirming 4052 that the requirements defined in the URS are compliant. 4053 4054 It should be noted that there is not a mandatory requirement to perform 4055 this review – the process of approving the design to be released for 4056 construction or the overall review process may also be considered a 4057 verification or qualification of the design, because it confirms that 4058 all client comments have been adequately addressed, and the client 4059 agrees with releasing the design for use. 4060 4061 An overview of a typical design /design review process is shown 4062 diagrammatically below: 4063 4064 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 107 Yes – then write system URS Project Initiation / & Concept Design Divide the scope into systems Ability to impact product Quality No – then no specific URS is generally required. Design Development Design Reviews Issue for Construction Design Change control Approve Design 4065 4066 Figure 5-1 Diagram of Design Review Process (Arrows missing) 4067 4068 An effective design review is dependant on the people conducting it, 4069 although most companies are now trying to develop knowledge capture 4070 systems such as: 4071 4072 Design review checklists (An example is included as an attachment) 4073 Design guides – defining the preferred way of designing a given 4074 system 4075 4076 These approaches have a common objective of trying not to be too 4077 prescriptive, losing the ability to consider novel concepts, but 4078 ensuring that company experience is captured and considered. 4079 4080 In order to make the process as effective as possible it is important 4081 to pre-define the method to be used, and agree the review participants. 4082 4083 A preferred approach is to use a multi–disciplinary team to ensure all 4084 view points are considered, with Subject Matter Experts in HVAC, 4085 Controls and regulatory requirements. 4086 4087 For areas where high system reliability is required, e.g. Vivarium, a 4088 formal review may be conducted, such as a FMEA, to ensure that the 4089 design is adequately robust. A simplified version of this approach may 4090 be beneficial even for simple manufacturing facilities considering the 4091 impact of system failures on adjacent areas, to ensure that the design 4092 is robust. 4093 4094 Notes taken from the review will be implemented through 4095 drawing/specification changes; if the revision cross references the 4096 notes it is not necessary to formally close out all actions in this GEP 4097 environment – the SME who will sign off the drawing is expected to 4098 check that all necessary changes have been incorporated. 4099 4100 In practice where there is a large project there will be multiple 4101 reviews at key stages – for example a review at the concept stage to 4102 ensure that the client team agrees with the proposals from the A&E 4103 design company – these may focus on individual systems, or on overall 4104 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 108 areas of the design, e.g. HVAC controls.. 4105 4106 For smaller projects with perhaps only one system, there may be less 4107 reviews – the project team should agree the approach to be applied to a 4108 specific project. 4109 4110 5.2 INTRODUCTION 4111 4112 As the design is developed it will evolve, with input from all 4113 interested parties. 4114 4115 Typically the process is formalized to make it more efficient. 4116 4117 An example of the approach is shown below: 4118 4119 Client URS Concept design developed by A&E consultant Design reviewed Design revised to suit review comments Design concept developed to detail level Detail design reviewed Design revised to suit review comments Completed design 4120 4121 Figure 5-2 The Design Process 4122 4123 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 109 The design review process is intended to ensure that: 4124 4125 original ideas from the design team are captured and reviewed 4126 company specific requirements / standards are incorporated in the 4127 design (after an evaluation of potential benefits/drawbacks to 4128 ensure company requirements are ―best practices‖) 4129 the design will perform to meet the requirements defined in the URS 4130 the design is robust and will perform reliably 4131 4132 The review may be structured to cover all design aspects, or divided 4133 into two: 4134 4135 A GEP review - to ensure that engineering best practices are 4136 incorporated 4137 A cGMP review - to ensure that all compliance requirements are 4138 adequately addressed by the proposed design. 4139 4140 The cGMP review is typically straight forward and consistent - it is 4141 expected that any resultant observations are tracked to ensure that 4142 they are addressed, with an audit trail created. 4143 4144 The GEP review may be more involved, (a lot of knowledge and experience 4145 within a company can be captured and used in the review process) also a 4146 formal audit trail is not usually required for GEP observations – 4147 typically the reviewer ensures that comments have been addressed, hence 4148 there may be a benefit in keeping independent reviews. 4149 4150 This suggestion is developed into a series of categorized design 4151 challenges shown below: 4152 4153 Table 5-1 Design concept stage cGMP review 4154 4155 Design Challenge Response Action Are the units and associated controllers located in a controlled access space? Maintainability (Consider accessibility to key components of the system, filter maintenance requirements, filter integrity testing (if required), regeneration requirements, emissions, etc.) Review and evaluate the AHU service distribution drawing and consider the following: How many AHU units (zones) are proposed, is the zoning based on the process requirements?(.) ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 110 Are the airflow directions / differential pressures correct to control product exposure / cross contamination? Are the temperature and humidity design and operating conditions defined? Are anyarea classifications required / defined? Are the systems once through or recirculating? (Are there provisions to handle solvents, high potent compounds or high particle generating operations, as required by the product/process operations?) Is the control scheme clearly defined, including monitoring and alarm requirements? 4156 4157 Figure 5-2 Detail Design or IFC stage cGMP review 4158 4159 Design Challenge Response Action Have the peak external design conditions been established from a reliable source, which considers local geographical features/ meteorological factors – lakes, prevailing wind direction etc? Has the user defined availability requirements for the products to allow the design external conditions to be defined? (i.e. the percentage of time that the facility will be able to maintain the manufacturing conditions) Are the internal requirements specified: Temperature / humidity / airflow direction – area differential pressures/classification. Review location of outside air intake and exhaust. Is the prevailing wind direction defined for the site, with the HVAC inlet and outlet locations defined to demonstrate no risk of recirculation? Is the facility divided into ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 111 Design Challenge Response Action manufacturing zones (areas)? What rationale is used to divide the facility into zones? Is the location of the monitoring sensors specified such that they will give representative readings of the space conditions: are they easily accessible for maintenance and calibration activities? (For large areas, such as a warehouse multi-point mapping and monitoring may be required, for smaller areas, 1 or 2 points is generally adequate, with the reading demonstrated as representative of the areas where product is susceptible to conditions during qualification using sensors. Consider the size of the room and the location of key process operations (e.g. product exposure) in establishing the location and number of monitored points.) If there area multiple air handling units servicing the manufacturing area, how will failure modes affect the intended operation? Will failure of one unit increase the risk of cross contamination? Is there a site drawing /component numbering system which has been used? Are airflow directions / differential pressures (from clean to less clean) appropriate to provide the minimum risk of product contamination / cross contamination, considering potential system failure modes? 4160 4161 Design Challenge Response Action Are there airlocks which separate areas of different classifications, with a target design DP of 15 Pa across the airlock? ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 112 Design Challenge Response Action The design airlock classification should be same as the area served when measured at rest. Are the airlocks specified with interlocked doors? (It is recommended that the design differential pressure is a minimum of 15 Pa to allow for construction issues.) Does the process require containment; if so is exhaust air filtered using safe change high efficiency filters with suitable re-filters (bag-in, bag-out)? Are there any provisions to handle solvents, high potency drugs, and/or high particle generating materials? If so, are the provisions in line with the area GMP operational requirements? (Airflow should be designed to contain high potency compounds. For biotech facilities design shall conform to the Center for Disease Control biosafety control levels.) Are the air handling systems designed for re-circulation where appropriate, and with suitable return air filtration? What assumptions have been made to specify the position of the temperature sensor to ensure that it is representative of room conditions? What assumptions have been made to specify the position of the humidity sensor to ensure that it is representative of room conditions? Is there a qualified system for manufacturing areas to monitor and maintain records of temperature, humidity, and airflow direction? (Define what will be the system ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 113 Design Challenge Response Action of record and what will be the system of control.) Is there a locally mounted alarm indicator for any out of limit environmental condition - temperature, humidity, airflow direction? Have alarm limits been defined based on product and process requirements Has the position of inlet/outlet grilles been specified where necessary? (If the area is classified, it is common practice to design with ceiling mounted supply grilles and return air taken at low level in the room? Is the area served a Laboratory, if so what considerations have been made for; fume hoods microenvironments, e.g. low humidity rooms Sensitive scales? Does humidification use plant steam, if so does it use approved additives (21 CFR 173.310) or chemical free steam? (If so it should be injected before the final HEPA filter - where one is used.) Is the ductwork specified using an appropriate allowance for leakage – is it shown on the design? Are the AHUs mounted inside, if not what provision is there to protect them and the staff from the weather during maintenance? Does the specification for the AHUs include access panels and test ports to facilitate maintenance, and HEPA filter testing if required? Are AHUs designed for constant volume, and low leakage of conditioned air? ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 114 Design Challenge Response Action How does the specification of the AHU ensure that it will not degrade or corrode during its working life, to affect its performance? Are progressive pre-filters specified – what is the basis for their selection? What final stage filters are specified? Are all classified areas served via 99.97 % efficient HEPA filters? (Note terminal filtration is preferred). (H13 specified for in situ leakage testing, or H 14) . Are lockable dampers specified, and is there a requirement to record the as balanced setting in the commissioning records? Confirm that the specification permits no interior lining of ductwork, with any sound attenuators specified using non shedding lining. What Security arrangements are there for controls? What happens in the event of power failure? Is the ductwork made of Galvanized steel, or are there special requirements, for non classified areas does the specification limit the use of flexible ductwork to 4 feet long? Confirm that for classified areas the use of flexible ductwork is not permitted. What are the leakage allowances – are they appropriate? (The use of flexible hosing must be carefully evaluated. Maintenance requirements must be discussed as part of the review process.) 4162 4163 Figure 5-3 Design concept stage GEP review 4164 4165 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 115 Challenge Response Action What considerations are made for reliability/robustness? Does the design proposed demonstrate current best practices? How are maintenance / calibration requirements addressed? How are failure modes considered? Are ceiling plenum returns proposed – if so how would the ceiling void be cleaned? 4166 4167 Figure 5-4Detail Design or IFC stage GEP review 4168 4169 Cleanability Challenge Response Action What arrangements are made to facilitate cleaning the system internally? How does the design consider the risk of building sickness syndrome? Operability Challenge Response Action Are airflow directions proposed for any catering areas, to contain odor? Are there arrangements to extract from copier rooms? Is the AHU construction specified to avoid risk of external condensation? If not are the air handling systems designed for re-circulation where appropriate, and with suitable return air filtration? What assumptions have been made to specify the position of the temperature sensor to ensure that it is representative of room conditions ? What assumptions have been made to specify the position of the humidity sensor to ensure that it is representative of room conditions? How does the design allow for future changes in the room layout in terms of sensor locations and zoning? Maintainability Challenge Response Resolution Are the site specific requirements defined in terms of preferred suppliers? ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 116 Are AHUs located in an area suitable for easy maintenance, suitably protected from the external environment to facilitate maintenance? Does the specification for the AHUs include access panels and test ports to facilitate maintenance? Is the system designed with progressive filtration? How have filter grades been decided – are they a site standard? Are lockable dampers specified, and is there a requirement to record the as balanced setting in the commissioning records? What Security arrangements are there for controls? What happens in the event of power failure? Is the fan drive external or a high efficiency/low loss design e.g. flat belt? What is the bearing design life at the maximum rated fan speed? Constructability Challenge Response Resolution Is the ductwork made of Galvanized steel, how is the internal finish specified, to ensure that the galvanizing is of good quality and finish? Does the ductwork specification limit the use of flexible ductwork to 4 feet long? 4170 4171 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 117 6 EQUIPMENT FUNCTION, INSTALLATION, AND OPERATION 4172 4173 6.1 EQUIPMENT FUNCTION AND MANUFACTURE 4174 4175 6.1.1 Introduction 4176 4177 The HVAC equipment section is geared around those items that deliver 4178 conditioned air to GMP spaces. The design and construction of the 4179 equipment is intended to meet safety, product and regulatory 4180 requirements while providing environmental comfort and protection to 4181 employees. They should have robust capabilities for achieving initial, 4182 continuous, and long-term operation, ease of maintenance, and low 4183 energy use. 4184 4185 HVAC equipment serving GMP areas are intended to work in conjunction 4186 with associated controls and sequences of operation systems to: 4187 4188 Maintain room temperature and relative humidity 4189 Maintain room pressurization and differential pressure cascades 4190 Provide make up (fresh) air for ventilation and room pressurization 4191 Minimize airborne contamination delivered to the conditioned space 4192 Provide required air flow rates to maintain room cleanliness 4193 classification when required 4194 4195 6.1.2 Air Handler Unit (AHU) 4196 4197 GMP air-handlers should be constructed to meet the more stringent 4198 performance, improved reliability, and maintenance requirements for 4199 critical areas being served. Air handler components such as coils, 4200 humidifiers, dehumidifiers, dampers, fans, motors, and filters should 4201 be designed and constructed so that the system can operate at 115% of 4202 anticipated design due to the potential for increased demand or future 4203 expansion. 4204 4205 6.1.2.1 Cabinet Construction 4206 4207 In geographic regions of moderate to high humidity levels, 4208 consideration should be given to have no through metal (a thermal 4209 break) on all wall, floor, doorframe, ceiling sections and doors. 4210 Potential for exterior condensation is possible if thermal breaks are 4211 not properly designed and implemented. AHU designated to operate at 4212 locations with high temperature and humidity conditions should have a 4213 true thermal break construction. 4214 4215 Total air leakage rate shall be no greater than ½% at 150% of the 4216 design positive/negative in total pressures or 50 cfm (1.42 m3/min), 4217 which ever is greater, or the requirements stated in the EN 1886 4218 standard, for the most sever ―leakage class‖ operation. 4219 4220 6.1.2.2 Panel Insulating Materials 4221 4222 It is recommended that roof, floor and ceiling panels be insulated with 4223 foam (polyisocyanurate) that is FM approved and meets NFPA fire rating. 4224 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 118 Foam should not be exposed to the air stream nor surrounding area. 4225 Where required by special conditions, panels may optionally be 4226 insulated with rock wool if the qualified vendor meets all minimum 4227 criteria herein. Panels should be constructed to be no less than 2‖ 4228 (51mm) thick and that the equipment manufacturer should guarantee that 4229 sweating will not occur anywhere on the AHU at the operating 4230 environmental conditions, in which the cabinet will be exposed. 4231 4232 6.1.2.3 Panel Lining 4233 4234 The interior wall and ceiling panel surfaces and joints should be 4235 ripple free, smooth, and continuous, constructed of a material such as 4236 aluminum or stainless steel, that can be wiped clean and will not 4237 easily rust or corrode. In compartments serving cooling coils or steam 4238 humidification injection, it is recommended to line this section with 4239 304L SS. It is unacceptable for exposed insulation or lining be 4240 exposed inside an air handling system serving a GMP area due to the 4241 potential of providing an area for mold propagation. 4242 4243 6.1.2.4 Panel Joints 4244 4245 All interior joints should be sealed with RTV silicon sealant caulk, 4246 compliant with appropriate regulations for food grade applications, 4247 with all exterior joints sealed with caulking having at least a 25-year 4248 life with mold inhibitor. 4249 4250 6.1.2.5 Duct Connections 4251 4252 Cabinet duct connections, which are of reduced size, can significantly 4253 reduce systems delivery capacity if selected to match ductwork mains. 4254 It is recommended that the return and supply duct connections be sized 4255 large enough to ensure air velocity is no-greater-than 1,100 fpm. 4256 Suitable transitions should then be connected to the main ductwork to 4257 ensure smooth and turbulent free transfer of air to duct mains. 4258 4259 6.1.2.6 Removable Wall Panels 4260 4261 Removable panels provide a means to remove large components such as fan 4262 assemblies and coils that would not fit through the man door. The 4263 removable panel allows removal of panel using simple hand tools and 4264 avoid cutting or sawing through thermal breaks and cabinet constructed 4265 walls making removal and subsequent sealing possible. 4266 4267 6.1.2.7 Flooring 4268 4269 Flooring should be of a sufficient thickness to prevent oil caning or 4270 deformation when walked upon. Flooring should be of diamond faced 4271 aluminum plate with a minimum 3/16‖ (4.76mm) thickness. Floor seams 4272 should be fully welded and the perimeter edge should have a minimum 2‖ 4273 (51 mm) lip turned up and sealed to the wall fora watertight floor 4274 system. Floor should be designed to have a capacity of 100-psf live 4275 load, to accommodate a service mechanic working inside unit. 4276 4277 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 119 6.1.2.8 Condensate Pan 4278 4279 The cooling coil condensate drain pans (up and downstream) shall be of 4280 smooth 304L SS. The pan shall be double or triple sloping as to enhance 4281 total drainage. Its length shall extend beyond its downstream face, a 4282 minimum of 12‖ (30 cm) or ½ the height of the coil, whichever is 4283 greater, and a minimum of 6‖ (15 cm) beyond its upstream face. (Refer 4284 to the ASHRAE – Systems & Equipment Handbook, Chapter 21.4.) Stacked 4285 cooling coils shall have their own drain pan, with drainage into the 4286 lower coil section(s). Its length shall extend beyond its downstream 4287 face, a minimum of 12‖ (30 cm) or ½ the height of the coil, whichever 4288 is greater, and a minimum of 4‖ (10 cm) beyond its upstream face. Drain 4289 pans shall slope a minimum 1:50 towards drain outlet. Connections 4290 shall be piped to exterior of unit casing. 4291 4292 Condensate drain traps shall be sufficiently designed and constructed 4293 so as to not cause puddles (which can lead to biological growth) and 4294 air movement into or out of the air handler during operating 4295 conditions. 4296 4297 6.1.2.9 Wash Down Capability 4298 4299 In certain applications, the interior of the air handler is cleaned and 4300 washed down. In these applications, all AHU sections (excluding 4301 condensate pans) requiring drainage capability for wash down should 4302 have a 2‖ (51mm) minimum diameter opening fully welded around the 4303 perimeter. The opening shall be fitted with a secured/removable, 4304 flush-mounted, airtight 304 SS cover plate or plug. 4305 4306 6.1.2.10 Roof 4307 4308 Air handling units located outdoors should be provided with roof panels 4309 sloped to a centerline peak or to one side as required while 4310 maintaining a flat ceiling inside. Entire panel shape should be fully 4311 insulated without gaps at the peak. Roof should have a minimum slope of 4312 1:50 for drainage. All exterior AHUs should have perimeter roof gutter 4313 with appropriate down spouts and rain guards above all exterior access 4314 doors constructed of same materials as casings. 4315 4316 6.1.2.11 Hardware 4317 4318 All hardware (i.e., screws, nuts, washers, etc.) should be 304 SS. 4319 Other materials, which oxidize or promote rust, should not be used in 4320 the construction of equipment. 4321 4322 6.1.2.12 Doors 4323 4324 Access doors should be installed on all sections of the AHU (i.e., 4325 coils, filters, fan, humidifier, etc.), wide enough (minimum width 24‖ 4326 (610 mm)) to allow entry by an operator for cleaning and inspection. 4327 All coils should have an access door on each side (up/downstream). 4328 Access doors shall be arranged to open against the direction of higher 4329 relative pressure for safe use and positive air seal. Positive pressure 4330 sections of the air handler shall have doors labeled as such. Doors 4331 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 120 should be of a double gasket compression design. All access doors 4332 should have an instrument test port to allow temperature and pressure 4333 readings to be collected without drilling into cabinet during air 4334 balancing commissioning. 4335 4336 All doors should have impact, mar-resistant, clear view ports (double 4337 pane wire, Mylar-backed glass or polycarbonate (Lexan)), minimum 12‖ x 4338 12‖ (305 mm x 305 mm) or 12‖ (305 mm) diameter. 4339 4340 All doors shall have handles located on the inside of the AHU for 4341 safety. Interior door handles will prevent someone from being trapped 4342 inside of the unit. 4343 4344 6.1.2.13 Mixing Plenum 4345 4346 Mixing plenum is a chamber within an HVAC system where outdoor air is 4347 mixed with return air. The mixed air becomes the supply air for the 4348 space after passing thru filtration, heating or cooling steps within 4349 the air handler. 4350 4351 6.1.2.14 Electrical 4352 4353 All lighting should consist of vapor tight fluorescent fixtures 4354 (typically 4 ft (1200 mm)) with two T8 lamps and electronic ballasts. 4355 All sections should have at least one fixture. There should be a 4356 minimum of two waterproof 6-hour maximum timer light switches per AHU, 4357 one per end. 4358 4359 Junction boxes should be weatherproof and all conduit penetrations 4360 should be sealed airtight. 4361 4362 All electrical components, wiring, and terminals shall be tagged. High 4363 voltage terminals shall be labeled as such. Internal power cabling 4364 shall be shielded. 4365 4366 All materials and installation methods shall be in compliance with NFPA 4367 and NEC. 4368 4369 Sections with fans and moving parts shall have warning signs ―ISOLATE 4370 BEFORE ENTRY‖ affixed to doors. AHUs manufactured for Europe should 4371 have a CE mark (Conformite Europenne). A CSA (Canadian Standards 4372 Association) rating should be placed on all electrical devices. 4373 4374 6.1.3 Fans 4375 4376 Fan selection is critical for generating the proper quantity of air 4377 (supply, return, exhaust/extract) and required pressure to overcome 4378 losses due to dampers, coils, filters, silencers, and ductwork. It is 4379 important to consider a number of items when selecting fans so they can 4380 operate smoothly over their intended life. This includes, materials of 4381 construction (rigidity, weight, corrosion, cleanability) determined for 4382 the type of operation (clean/contaminated air, humidity, temperature, 4383 severity), bearing, lubrication, direct vs. belt driven, static 4384 pressure flow sensing, and safety guards. 4385 4386 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 121 Air handlers are configured as either a draw-thru or blow-thru 4387 operation, with the former most typically used. Draw-thru units have 4388 the fan located downstream of the pre-filters, coils, and humidifier. 4389 Their advantages include a shorter unit length, negative pressure on 4390 all access doors except the fan discharge section, and reheating of air 4391 leaving the fan section, which will reduce reheat coil requirements. 4392 4393 Fan pressure performance and construction are identified as Class I, 4394 II, III, or IV by AMCA, based on certain minimum operating criteria. A 4395 Class I fan offered by any particular manufacturer has a lower 4396 allowable minimum operating range than its Class II counterpart. As a 4397 result, a Class I fan with less mechanical design strength and with 4398 less expense than a Class II fan. Typically, Class II & III fan 4399 performances are sufficient to handle pharmaceutical applications. 4400 4401 Fans typically used for air handlers on the supply side are either a 4402 direct driven plug/plenum fan or a belt driven centrifugal fan. 4403 Exhaust/extract operations typically use direct or belt driven vane 4404 axial or a belt driven centrifugal fan 4405 4406 Plenum fans are limited to approximately 12‖ static pressure and 4407 roughly 75,000 cfm of air, while centrifugal fans can produce 20‖ of 4408 static pressure and greater than 200,000 cfm of air. Vane axial fans 4409 can typically produce up to 10‖ static pressure and 100,000 cfm of air. 4410 4411 Plenum fans should be designed for high efficiency, with non-4412 overloading airfoil aluminum wheels. They should include inlet cones 4413 matched to the wheel intake rim to ensure efficient and quiet 4414 operation. 4415 4416 Vane Axial fans are designed where large volumes of air arerequired at 4417 moderate to high pressures. The tubular design, high efficiency rotor 4418 and integral straightening vanes provide high performance using minimal 4419 space. These fans are an excellent choice for HVAC systems using 4420 variable air volumes, clean rooms, and exhaust/extract. They are most 4421 efficient as return to air handlers and for exhaust/extract 4422 applications (fume hoods, bio-safety cabinets.) These units should be 4423 configured for direct drive though belt driven could be used. 4424 4425 Another variation of the direct drive fan configuration is an array of 4426 smaller plug fans (commonly called a fan wall) to replace a traditional 4427 single large fan. This arrangement reduces the overall footprint of the 4428 air handler, allows design flexibility, simplifies maintenance, reduces 4429 downtime, reduces low-frequency noise (rumble) within the air handler, 4430 and usually saves energy, The use of multiple direct-drive fans 4431 operating in parallel improves reliability by providing redundancy. 4432 4433 Direct driven fans eliminate belt replacement, guards, and belt 4434 shedding and alignment. In addition, there are no shaft bearings 4435 present, which eliminates lubrication. 4436 4437 All belt-driven fans should have their motor and fan belt/sheave 4438 assemblies completely enclosed (front and rear) in a rigid, 304 SS or 4439 painted steel guard that protects personnel from injury and have an 4440 access for measuring tachometer readings. These guards are to be 4441 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 122 removable without the use of any tools but should include a warning 4442 label to notify the operator to secure the equipment prior to opening. 4443 Motor base shall automatically control belt tension and be of 4444 permanently aligned type to allow belt changes without realigning. For 4445 multiple belt systems, belts provided should be matched sets. Entire 4446 fan assembly shall be centered in the air stream both vertically and 4447 horizontally to assure proper airflow. All fan inlets and discharges 4448 should have 304 SS operator protective screens. 4449 4450 Belt driven fans should be laser aligned to decrease the chance of 4451 failure to bearing, shaft and belts and energy consumption. Fan belt 4452 tension is extremely important during their entire life. Special 4453 attention should be incorporated, especially when installing new V-4454 belts. Once the new belt(s) have operated for a short time, they most 4455 likely will need to be readjusted due to belt wear-in. Improper under-4456 tensioning will result in premature failure and increased energy usage. 4457 Over-tensioning can reduce bearing life. Synchronous belts reduce 4458 energy consumption since they don‘t slip during start-up and operation. 4459 4460 All fan housings shall be continuously welded to provide strength and 4461 durability for extended service life. They should have a primer with at 4462 least one coat of industrial strength or epoxy paint finish to 4463 eliminate rusting. For centrifugal fans a drain connection should be 4464 included, located at the bottom of the fan housing for draining any 4465 fluids that may accumulate. 4466 4467 Fan wheels should be of aluminum construction where possible to reduce 4468 weight and rusting and be fully welded and non-overloading. All wheels 4469 are both statically and dynamically balanced. Fan shafts should be 4470 precision ground, polished and sized so that the first critical speed 4471 is at least 25% over the maximum operating speed. A shaft seal should 4472 be included to reduce leakage and protects the bearings from a 4473 contaminated air stream. 4474 4475 Fan shaft bearings shall be selected for a minimum average life of ABMA 4476 L10 200,000 hours. Automatic bearing lubricators should be installed 4477 to increase bearing life and reduce maintenance. This will eliminate 4478 the possibility of over/under lubrication, resulting in premature 4479 bearing failure. Recommend lubricator installed directly to bearing 4480 housing. Lubricators should be sized to supply lubricant for a minimum 4481 of 6 months without refill or replacement. The vendor needs to work 4482 closely with the lubricator supplier to provide the proper lubricant 4483 and device for the intended operation of the air handler. Note: The 4484 lubricator should not be mounted or activated until the fan is put into 4485 full operation, to eliminate automatic, excessive lubrication and 4486 damage. 4487 4488 Include removable inlet and outlet fan guards to provide protection for 4489 personnel and equipment meeting OSHA standards. 4490 4491 Center the fan inlets in both the horizontal and vertical planes within 4492 the air handler. 4493 4494 For measuring fan airflow without impeding air movement in or near the 4495 fan inlet, which would increase system static pressure, it is 4496 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 123 recommended to install, a combination piezometer ring and static 4497 pressure tap, integrated into the inlet cone. The inlet cone of the fan 4498 is used as the flow nozzle. 4499 4500 Vibration shall conform to ANSI/AMCA Standard 204, ―Balance Quality and 4501 Vibration Levels for Fans‖ and have a maximum balance and vibration BV-4502 4 category. The vibration limits shall be 2.5 mm/s (0.10 ips) for 4503 rigid mounted (direct driven) fans and 3.8 mm/s (0.15 ips) for 4504 flexibility mounted (belt driven) fans. The balance quality grade for 4505 impellers shall be no greater than G2.5 mm/s (0.10 ips), ANSI S 2.19 4506 (ISO 1940) ―Balance Quality for Rigid Bodies‖. Balance readings shall 4507 be taken by electronic type equipment in the axial, vertical, and 4508 horizontal directions on each of the bearings. 4509 4510 Fans and motors should be provided with vibration sensors with signal 4511 wiring brought out to a vibration interface enclosure mounted on the 4512 outside of the AHU to provide early warning and trending of bearing 4513 performance. 4514 4515 6.1.3.1 Motors & Drives 4516 4517 All motors that are anticipated to operate at various loads should be 4518 inverter duty, rated NEMA premium efficiency and should comply with 4519 NEMA MG1, Part 31. A shaft grounding system or isolated bearings 4520 should be installed to prevent bearing failures caused by induced 4521 electrical current. 4522 4523 Motor bearings shall be selected for a minimum average life of ABMA L10 4524 200,000 hours. Automatic bearing lubricators should be installed to 4525 increase bearing life and reduce maintenance. This will eliminate the 4526 possibility of over/under lubrication, resulting in premature bearing 4527 failure. Recommend lubricator installed directly to bearing housing. 4528 Lubricators should be sized to supply lubricant for a minimum of 6 4529 months without refill or replacement. The vendor needs to work closely 4530 with the lubricator supplier to provide the proper lubricant and device 4531 for the intended operation of the air handler. Note: The lubricator 4532 should not be mounted or activated until the fan is put into full 4533 operation, to eliminate automatic, excessive lubrication and damage. 4534 4535 It is recommended to include variable frequency drives (VFD) to control 4536 the volume of air delivered to the various spaces. The advantage of the 4537 VFD in lieu of variable inlet guide vanes include better volume 4538 control, energy usage, less maintenance, soft start of fan motor 4539 reducing the in-rush of electrical current and stress on the fan, and 4540 positive control feedback to the building automation. Invertors should 4541 include line and load reactors to eliminate motorfailure. 4542 4543 It is recommended fans with belt drives use a synchronous belt with 4544 matching sprocket in lieu of V-belts and sheave. The advantages include 4545 non-slip operation, longer life, less maintenance, little to no belt 4546 shedding, single sync. belt vs. multiple V-belts for same operation and 4547 reduced energy consumption. The one disadvantage is that it will 4548 possibly produce higher noise levels. 4549 4550 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 124 6.1.4 Fume Exhaust/Extract Systems 4551 4552 Laboratory and process fumes shall be directly exhausted to a safe 4553 location outside the building. To maximize the intent of exhausting 4554 unwanted contaminants, the inlets to the exhaust system should be as 4555 close to the point of generation as possible. The exhaust plume height 4556 shall be great enough to avoid re-entrainment of exhaust air into air 4557 inlets or onto roof and to disperse the exhaust. The effective stack 4558 height should be used when analyzing design issues. 4559 4560 Wherever an occupational or environmental risk may exist attributed to 4561 a HVAC or local exhaust ventilation (LEV) system installation, a 4562 building airflow wake simulation shall be performed. This simulation 4563 shall to verify the effective mitigation of aerosol contaminant re-4564 entrainment to meet current ACGIH TLV® country-specific level, the 4565 company OEG for APIs, and/or biohazardous agent safety level. Factors 4566 impacting the wake flow requirements include: toxicity of the material, 4567 quantities and frequency of generation, inlet and exhaust placement, 4568 discharge filtration and velocities, prevailing wind directions and 4569 velocities, existence of adjoining buildings or structures, and area 4570 topography. 4571 4572 Discharge velocities from exhaust stacks should be no less than 3,000 4573 fpm (15.24 m/s). Exhaust from the hoods, BSC, or process equipment can 4574 be accomplished by ducting each piece of equipment to a dedicated fan 4575 or by manifolding the ducts to a centralized fan system. The 4576 manifolded system is preferred due to its 100% redundancy and reduced 4577 energy and maintenance costs. However, when only a few hoods exist or 4578 hood locations are remote from one another or for specific 4579 applications, then individual dedicated fans will probably be more 4580 applicable. 4581 4582 Fans should be located exterior to the building so as to establish a 4583 negative pressure within the entire length of the exhaust ductwork. 4584 Where external location is not possible, the ductwork on the discharge 4585 of the fan, which will be under positive pressure, shall be welded pipe 4586 and pressure tested for zero leakage. Automatic dampers shall be 4587 strategically installed so as to not cause exhaust air to be drawn back 4588 down into the building or short cycled from an idled companion fan. 4589 4590 Care must be taken to address noise sensitive areas and aesthetics in 4591 the location of the fans and their operation. This may include 4592 acoustical silencer nozzles and roof sound barriers. 4593 4594 Two fan types are considered acceptable for this application. These 4595 include the preferred mixed-flow impeller (combines the benefits of 4596 axial flow and centrifugal flow fans) or the centrifugal fan. 4597 Whichever fan application is chosen during project development, it 4598 should provide for safe, easy inspection and maintenance of the fan 4599 drive components. Fans shall meet AMCA type B or C spark-resistant 4600 construction. All metal surfaces shall be coated with an epoxy for 4601 protection against weather, UV, and chemical vapors. Fans and 4602 accessories shall have internal drain systems to prevent rainwater from 4603 entering building duct system. 4604 4605 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 125 The motor, belt drive, and bearings shall all be located outside the 4606 contaminated air stream. Replacement of any of these components shall 4607 not require removal of the fan from the system or exposing maintenance, 4608 service personnel to the potentially contaminated interior of the fan. 4609 4610 Electric motors should be TEFC chemical duty, with a 1.15 service 4611 factor for continuous duty operation, NEMA Design B with class F 4612 insulation, and sealed bearings with a minimum bearing life of L10 4613 100,000 hours. A NEMA 3R non-fused disconnect switch shall be 4614 provided, mounted, and wired to the motor. 4615 4616 Fans shall be tested under ANSI/ASHRAE 51 or British Standard 848-I. 4617 Sound testing shall be in accordance with AMCA 300. Fans shall be UL 4618 and CUL listed per UL 705 safety standard or ENEC (European Norms 4619 Electrical Certification), or country-specific requirements, and shall 4620 meet the criteria of NFPA-45 and ANSI/AIHA Z9.5. 4621 4622 6.1.5 Heating and Cooling Coils 4623 4624 Coils should be fully drainable with vent and connections extending 4625 external to the AHU or ductwork. All steam coils should be fitted with 4626 vacuum breakers. Water system velocities should be kept between 2 and 6 4627 fps (0.61 and 1.83 m/s) to provide for proper turbulence and to 4628 minimize erosion. Water velocity through a coil needs to be > 1 ft/sec 4629 to ensure heat transfer ability of coil. Should fluid speed reduce 4630 toward laminarity, this can result in reduced sensible and latent heat 4631 transfer capacity. 4632 4633 Coils, which are exposed to salt or corrosive conditions may be 4634 beneficial to select a fin material of copper rather than aluminum due 4635 to degradation of the aluminum material exposed to corrosive 4636 atmospheres. All coil performances should be designed and achieve 4637 rating in accordance with ARI Std. 410. 4638 4639 Coils sizing, configuration, and installation will have an impact on 4640 their performance to meet the delivery of conditioned air. Peak 4641 moisture load should be considered for coil design using the climatic 4642 data from the ASHRAE Fundamentals Handbook or CIBSE Guide A. 4643 4644 Air handler cooling coils should have a maximum average face velocity 4645 of 450 fpm (2.29 m/s) to eliminate condensate carry over. Cooling coil 4646 face velocities shall be fairly uniform with actual velocity hot spots 4647 being no greater than 525 fpm (2.67 m/s). Steam and hot water coils 4648 should have a maximum face velocity of 600 fpm (3.0 m/s), to reduce 4649 static pressure resulting in a lower (coil to energy) cost ratio, when 4650 compared with coils having velocities of 800 fpm (4.06 m/s) and higher. 4651 4652 Air handler cooling coil tubing should be of nominal 5/8‖ (15 mm) O.D., 4653 0.035‖ (0.89 mm) thick seamless copper, with aluminum fins of at least 4654 0.0095‖ (0.24 mm) thickness. Coil casings and frames should be 304L SS 4655 for better longevity and elimination of rust with a center tube support 4656 for coils greater than 48‖ (1.2 m) in width. Cooling coils should be 4657 no more than 10 rows deep and 10 fins/inch to enhance cleaning and 4658 better heat transfer. 4659 4660 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 126 Air handler heating coil tubing should be of nominal 5/8‖ (15 mm) O.D., 4661 0.035‖ (0.89 mm) thick seamless cupro-nickel for better corrosion 4662 resistance, with aluminum fins of at least 0.0095‖ (0.24 mm) thickness. 4663 Coil casings and frames should be 304L SS with a center tube support 4664 for coils greater than 48‖ (1.2 m) in width. Preheat steam and hot 4665 water coils should consist of no less than 2 rows to provide lower 4666 downstream face temperature variation. 4667 4668 Duct mounted coil tubing shouldbe a minimum nominal 1/2‖ (13 mm) O.D., 4669 0.025‖ (0.64 mm) thick seamless copper, with aluminum fins of at least 4670 0.008‖ (0.20 mm) thickness. 4671 4672 Coils should be fully drainable with vent and connections extending 4673 external to the AHU or ductwork. Include full port shut-off valves 4674 with hose connection with cap and chain. All steam coils should be 4675 fitted with vacuum breakers. 4676 4677 All coils, which are exposed to salt or corrosive conditions, should 4678 have corrosion resistant coating. All cooling coils should be coated 4679 to enhance heat transfer and reduce biological growth. 4680 4681 All coils shall be fitted onto 304L SS tracks for ease of removal. 4682 4683 6.1.6 Humidifiers 4684 4685 Humidifiers should be comprised of steam injection dispersion/sparge 4686 tubes and accessories to provide drip-free steam absorption without 4687 downstream condensate. When clean steam is required for 4688 humidification, sanitary tri-clamp connection control valves and 4689 thermostatic steam traps, along with other components made of 316L SS, 4690 should be used. Modulating steam control valves should be included to 4691 provide accurate control. A wye strainer should be installed upstream 4692 of the control valve to provide it from dirt. 4693 4694 When located in the air-handling unit, the humidifier section should be 4695 located directly upstream of the cooling coil section to ensure 4696 efficient absorption of vapor into the air stream. The humidifier 4697 condensate drain pans (up and downstream) should be 12 gauge 304L SS, 4698 and at least 2‖ (5 cm) deep. Its length should extend beyond its 4699 downstream face to the upstream side cooling coil section and a minimum 4700 of 6‖ (15 cm) beyond its upstream face. Connections should be piped to 4701 exterior of unit casing. 4702 4703 When the humidifier is located within ductwork, the ductwork shall be 4704 constructed of fully welded 304L SS, 2 ft (0.6 m) upstream and 5 ft 4705 (1.5 m) downstream of the humidifier. Humidifier ductwork sections 4706 shall be pitched downstream of the humidifier to a drain. 4707 4708 6.1.7 Dehumidification 4709 4710 When standard chilled/glycol systems are unable to sufficiently reduce 4711 relative humidity levels, several dehumidification systems are 4712 available to handle lower relative humidity limits. 4713 4714 These include: 4715 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 127 4716 Run-around coil systems 4717 Heat pipe systems 4718 Dual-path systems 4719 Desiccant systems 4720 4721 Because they are capable of delivering air at much lower dew points 4722 than coils, desiccant systems have been the most widely used method for 4723 dehumidification in the pharmaceutical industry. 4724 4725 Proper layout of equipment should include filters upstream of the coils 4726 and fans downstream of coils (draw-through mode) to provide a small 4727 amount of reheat. Select low face velocity coils to reduce air pressure 4728 drop and improve dehumidification performance. 4729 4730 When dehumidification is integrated into a cooling system, pay special 4731 attention to these issues: 4732 4733 Select and size HVAC equipment (coils, fan, pump, damper, etc.) for 4734 sensible and latent cooling at peak load conditions. These usually 4735 don‘t occur simultaneously. 4736 4737 Design for energy efficiency at part-load conditions because peak load 4738 usually occurs for only about 2% of the operating time. 4739 4740 A run-around coil system is a simple piping loop with an upstream pre-4741 cooling coil and a downstream reheating coil that sandwiches the main 4742 cooling coil. The circulating fluid is pumped to transfer heat from the 4743 warm mixed air to the off coil cold supply air. The run-around system 4744 reduces the cooling load on the main cooling coil; reheat is provided 4745 by the heat picked up by the circulating fluid in pre-cooling coil 4746 instead of by an external source of expensive energy. 4747 4748 The run-around loop requires a fractional horsepower pump and a three-4749 way valve or a variable-speed drive (VSD) for the pump. For bigger 4750 systems, an expansion tank with air vent may be needed. 4751 4752 4753 4754 Figure 6-1 Run-around cooling loop 4755 4756 Heat pipes increase the effectiveness of air conditioning systems by 4757 helping to decrease the total cooling load of the air. The typical 4758 design consists of a refrigerant loop with two connected heat 4759 exchangers placed upstream (evaporator coil section) and downstream 4760 (condenser coil section) from the cooling coil. As the air passes 4761 through the first heat exchanger it vaporizes the refrigerant and is 4762 pre-cooled. This allows the coil to more effectively cool the air to a 4763 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 128 point below the dew-point temperature and to extract more moisture. The 4764 air then passes through the second heat exchanger and is reheated, 4765 which liquefies the refrigerant, causing it to flow back to the first 4766 heat exchanger. The heat pipe system is hermetically sealed, uses a 4767 wicking action, and requires no pump. The increased dehumidification 4768 capacity provided by heat pipes allows for a smaller cooling system. 4769 However, the addition of heat pipes will increase the pressure drop, 4770 and fan power must be adjusted accordingly. 4771 4772 4773 4774 Figure 6-2 Heat Pipe System 4775 4776 A dual-path system uses two coils (either chilled water or DX) to 4777 separately cool the incoming outside air and return air. The hot and 4778 humid outdoor air is cooled by a primary coil to 42°F to 45°F for 4779 dehumidification. The secondary coil furnishes the sensible cooling of 4780 part of the relatively cool and dry return air. A portion of the return 4781 air may bypass the secondary coil and mix with the cooled return air 4782 stream. These two air streams are then mixed into supply air with 4783 appropriate temperature and humidity. 4784 4785 Dual-path systems offer competitive energy efficiency with run-around 4786 loop systems, and provide better control of the outside air ventilation 4787 rate. Dual-path systems decouple sensible cooling and latent cooling 4788 for easy control of the supply air temperature and humidity. Dual-path 4789 systems can be installed separately or integrated with additional 4790 HVAC/R equipment. The OA cooling coil should be sized for peak latent 4791 load, while the RA cooling coil should be sized for peak sensible load. 4792 The OA path controls the humidity of the supply air by modulating the 4793 chilled water flow, while the RA path controls the supply air 4794 temperature by adjusting the bypass damper position. 4795 4796 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 129 4797 4798 Figure 6-3 Dual Path Cooling 4799 4800 Desiccant Systems are applicable and the most prevalent when operations 4801 require large dehumidification and low space humidity levels that would 4802 be difficult to achieve with cooling-type dehumidification. They can be 4803 configured to condition part or all of the incoming air. The main 4804 factors, which influence this, include percentage of outside air, 4805 outside and space relative humidity levels, and the quantity of air 4806 flow for the conditioned spaces. 4807 4808 Desiccant materials possess the affinity for water vapor greater than 4809 that of air. They can either be solid or liquid as absorbents & 4810 adsorbents. Both solid and liquid desiccants are used in cooling 4811 systems, but solid desiccants are the most widely used for HVAC 4812 operations. 4813 4814Absorbents are generally liquids or solids, which become liquid as they 4815 absorb moisture, i.e. they undergo a physical or a chemical change as 4816 they collect moisture. Typical absorbents include Lithium Chloride 4817 (LiCl) and Sodium Chloride (NaCl). 4818 4819 Adsorbents are mostly solids and do not under go any physical or 4820 chemical change when they come in contact with moisture. Water is 4821 adsorbed or held on the surface of the material and in the pores. 4822 Typical adsorbents include Silica Gel, Molecular Sieve and Activation 4823 Alumina, with Silica Gel being the most widely used. 4824 4825 The choice of desiccant material must be evaluated taking into account 4826 the amount of moisture to be removed, exposure to open product (some 4827 desiccants may not have regulatory (FDA and EU) approval when used in 4828 airstreams with direct contact with consumable items), and operating 4829 and maintenance costs. 4830 4831 The choice of a desiccant system affects the selection and sizing of 4832 the cooling coil, because the cooling coil only needs to handle the 4833 sensible load of the supply air, which allows for higher chilled water 4834 temperature and efficient operation. The sensible cooling load will be 4835 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 130 higher because of the hot dry air leaving from the desiccant wheel (due 4836 to heat of adsorption). However, the addition of a desiccant wheel will 4837 increase the pressure drop, fan power and maintenance, and an 4838 additional motor is required to rotate the wheel. This extra energy 4839 usage must be counted accordingly. Desiccant systems should use low-4840 cost surplus heat, waste heat or solar heat for desiccant reactivation. 4841 Dampers or VSD for fans should be installed to control airflow through 4842 the wheel. Side access for wheel and filter replacement and maintenance 4843 should be provided. Energy recovery and direct/indirect evaporative 4844 cooling are frequently incorporated in desiccant systems to reduce the 4845 cooling and heating energy. 4846 4847 Units should be capable of sustained operation without damage to the 4848 humidity transfer media. The dehumidifier should be a fully factory 4849 assembled package unit, complete with desiccant rotor, desiccant rotor 4850 drive assembly, reactivation heat source, filters, motors, fan(s), 4851 access panels, volume dampers, dust-tight electrical enclosure, and all 4852 component auxiliaries as recommended by the manufacturer for safe, 4853 unattended automatic operation. The unit should be fully automated and 4854 equipped with differential pressure gauges and temperature 4855 transmitters, which measure and display the pressure drop across the 4856 desiccant wheel and the reactivation and pre-cooling air discharge 4857 temperatures. 4858 4859 The unit casing should be fabricated of strain-hardened aluminum for 4860 torsional rigidity and corrosion resistance. The casing should be 4861 welded, gasketed, and sealed to be air and vapor tight at design 4862 pressures and airflows. Air seals and internal partitions should 4863 separate the process and reactivation air streams at operating pressure 4864 differentials of up to 8‖ w.g. (1.993 kPa). The dehumidifier should 4865 have full-face seals on both the process air entering and the process 4866 air leaving sides of the wheel. These should seal the entire perimeter 4867 of both air streams as they enter and leave the wheel. The seals 4868 should have a minimum working life of 25,000 hours of normal operation. 4869 4870 The desiccant wheel media shall be adsorbent, bacteriostatic, non-4871 toxic, non-corrosive, and nonflammable, and fabricated entirely of 4872 inert, inorganic binders and glass fibers with the desiccant uniformly 4873 and permanently dispersed throughout the matrix structure to create a 4874 homogenous media. The desiccant wheel should have the capability of 4875 delivering nearly 100% of its drying capability for a minimum of 5 4876 years. 4877 4878 Desiccant systems are more competitive when a low supply air dew-point 4879 temperature is required, latent load fraction is high, low- or no-cost 4880 reactivation heat from steam, hot water or waste heat is available, and 4881 electricity costs are high when compared to gas costs. 4882 4883 There are several circumstances that may favor desiccant systems rather 4884 than cooling-based dehumidification systems. These include: 4885 4886 Economic benefit from low humidity 4887 High moisture loads with low sensible load 4888 Need for more fresh air 4889 Exhaust air available for desiccant post cooling 4890 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 131 Low thermal energy cost with high electrical demand 4891 Economic benefit to dry duct work 4892 Low-cost heat available for desiccant regeneration 4893 4894 4895 4896 Figure 6-4 A package desiccant HVAC system (courtesy of ___________) 4897 4898 6.1.8 Air Filtration 4899 4900 Air filtration is one of the important HVAC components that affects the 4901 cleanliness of air delivered to the use point. The following is 4902 intended to be an overview of various filtration levels. It does not 4903 discuss in detail the construction of the filters themselves, since 4904 extensive detailed technical information is readily available from 4905 filter manufacturers. 4906 4907 Air filtration is performed at various locations within the HVAC system 4908 to attain the air cleanliness needed to protect the process (room 4909 airborne particles), occupants, and the air handling equipment and 4910 ductwork. Initial filtration/pre-filtration (Level I & II Filtration) 4911 is performed within the air-handling unit where outside and return air 4912 streams enter. The efficiency of the filters should be sufficient to 4913 keep the internal components (coils, fan) and the AHU itself relatively 4914 clean over an extended period of time, so they can perform as intended. 4915 Final filtration (Level III Filtration) occurs at the discharge section 4916 of the air handling unit after the air stream has been conditioned and 4917 is intended to protect the ductwork, terminal filtration (when 4918 provided), personnel and the work space from airborne particles that 4919 may have been generated by the coils and supply fan. Terminal 4920 filtration, which is located at the room perimeter (ceilings and walls) 4921 is intended to provide both the cleanest air possible supplied into the 4922 room and when required, to capture air particulates generated by the 4923 processes served by the air handler and carried through the return 4924 ductwork. 4925 4926 The cleanliness of the filtered air will be influenced by several 4927 factors including the quantity and quality of the outside air 4928 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 132 introduced into the system for ventilation/pressurization, the ratio of 4929 outside air to return air, and any introduction of particles within the 4930 air handler and ductwork. 4931 4932 All Pre- and Final-filtration grid systems should be of rigid 4933 construction, usually aluminum or 304 SS. Consideration should be made 4934 to make sure that all the air travels through the filters and does not 4935 bypass around the filters or the grid. Filters should be front-loaded 4936 to eliminate air bypass. Filter frames should have closed cell 4937 rubberized/neoprene-type gaskets only to prevent shedding. A separation 4938 of at least 2‖ (51 mm) should exist between the pre and post filters in 4939 the pre-filter section to reduce static pressure and increase the 4940 performance of the filters. 4941 4942 ASHRAE typefilters should be designed at a maximum air velocity of 450 4943 fpm (2.3 m/s) when they are located in the air handler filter banks. 4944 Many designers choose to lower the design specification by 10 - 20% to 4945 provide future capacity. 4946 4947 HEPA filter air velocities should be designed at a maximum of 100 fpm 4948 (0.51 m/s) when positioned as terminal supply air filters, and 450 fpm 4949 (2.3 m/s) when positioned as a terminal return, in an exhaust/extract 4950 air filter housing, or in the air handler. 4951 4952 Filters should be of standardized sizes so as to limit inventory and 4953 simplify ordering and replacements. 4954 4955 Filter classifications and ratings- (Editor‘s Note: We have yet to 4956 reconcile this table with additional detail to add to clarify the 4957 ASHRAE/MERV ratings, but I want to retain the existing details of the 4958 EN1822 and IEST ratings. I haven‘t yet been able to get all that on the 4959 same chart. attached below is this draft on 27June2008….Don Moore) 4960 4961 4962 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 133 4963 Table 6-1 ASHRAE vs. EU/EN filter ratings 4964 4965 ASHRAE MERV Size Efficie ncy, Composit e % in Size Range, Average Particle m ASHRAE 52.2 EU type (approx .) EN 779 (approx .) (Note: These comparisons of filter rating systems are only approximate as the test methods are different. ) IEST Type (RP-CC001.4) E1 - Range 1 0.30 - 1.0 E2 - Range 2 1.0 - 3.0 E3 - Range 3 3.0 - 10.0 MERV n/a n/a E3 < 20 1 EU 1 G 1 n/a n/a E3 < 20 2 EU 2 G 2 n/a n/a E3 < 20 3 EU 2 G 2 n/a n/a E3 < 20 4 EU 2 G 2 n/a n/a 20 ≤ E3 < 35 5 EU 3 G 3 n/a n/a 35 ≤ E3 < 50 6 EU 4 G 4 n/a n/a 50 ≤ E3 < 70 7 EU 4 G 4 n/a n/a 70 ≤ E3 8 EU 5 F 5 n/a E2 < 50 85 ≤ E3 9 EU 5 F 5 n/a 50 ≤ E2 < 65 85 ≤ E3 10 EU 5 F 5 n/a 65 ≤ E2 85 ≤ E3 11 EU 6 F 6 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 134 < 80 n/a 80 ≤ E2 90 ≤ E3 12 EU 6 F 6 E1 < 75 90 ≤ E2 90 ≤ E3 13 EU 7 F 7 75 ≤ E1 < 85 90 ≤ E2 90 ≤ E3 14 EU 8 F 8 85 ≤ E1 < 95 90 ≤ E2 90 ≤ E3 15 EU 9 F 9 95 ≤ E1 95 ≤ E2 95 ≤ E3 16 EU 9 F 9 EN 1822 (approx .) * EU 10 H10 HEPA 85% @MPPS EU 11 H11 HEPA 95% @MPPS EU 12 H12 HEPA 99.5% @MPPS HEPA 99.97% @0.3m** A, B, E EU 13 H13 HEPA 99.95% @MPPS 99.99% @0.3 m** C EU 14 H14 HEPA 99.995%@MPPS 99.999% @0.3 m** D, K U15 HEPA 99.9995% @MPPS 99.999 @0.1-0.2 m** F U16 HEPA 99.99995% @MPPS 99.9999 @0.1-0.2 m** G U17 ULPA 99.999995 @MPPS ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 135 * All EN 1822 tests at MPPS ** All tested with thermally generated DOP aerosol (0.3 m MMD; ie, CMD is near MPPS) F, G & K type filters are tested at either 0.1-0.2 or 0.2-0.3 m. K type filters are 99.995%. Refer to IEST-RP- CC001.4 for ratings perfilter type 4966 4967 4968 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 136 4969 Filters are typically classified by either IEST Recommended Practice 4970 RP-CC001, ASHRAE Standard 52.2 or EN 779/1822 (European standards for, 4971 respectively, general ventilation filters/HEPA & ULPA filters). Since 4972 the different grading systems are based on different challenge 4973 materials and sizes and use different measurement methods, comparisons 4974 between the different grading systems are not exact. While the 4975 following table is an approximate comparison between filters classified 4976 by the different systems and is helpful in understanding relative 4977 performance of the various filter classes, the specific standard 4978 relevant to the requirements for your application must be quoted to 4979 avoid confusion. 4980 4981 4982 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 137 Table 6-2 ASHRAE vs. IEST and CEN filter ratings 4983 4984 Filter options and comparisons ASHRAE ASHRAE (MERV) IEST Type (RP- CC001.4) <65 <20 1 " EU 1 G 1 65+ <20 2 " 70+ <20 3 " EU 2 G 2 >10 micron 75+ <20 4 80+ <20 5 " EU 3 G 3 85+ <20 6 " EU 4 G 4 90 25-30 7 " 3-10 micron 90+ 30-35 8 Pleated, throwaway, cartridge. Cotton poly, synthetic 1-3 micron 90+ 40-45 9 " 1-3 micron 95+ 50-55 10 " EU 5 F 5 1-3 micron 95+ 60-65 11 " EU 6 F 6 1-3 micron 95+ 70-75 12 " 0.3-1 micron 98+ 80-90 13 " EU 7 F 7 0.3-1 micron 98+ 90-95 14 Bag filters & rigid frame filters, fiberglass or synthetic EU 8 F 8 0.3-1 micron <100 95 15 EU 9 F 9 0.3-1 micron ~100 NA EN 1822 16 HEPA 95%+ @ 0.3 um** H10 HEPA 98% @ 0.3 um** EU 11 H 11 0 -0.3 micron ~100 NA 17 HEPA 99.97% @ 0.3um** A EU 12 H 12, H13 0 -0.3 micron ~100 NA 18 HEPA 99.99@0.3 um** C EU 14 H 14 0 -0.3 micron ~100 NA 19 HEPA 99.999@0.3 um** D U 15 0 -0.3 micron ~100 NA 20 ULPA 99.999 @0.12 um F U15 ULPA 99.9999 @ 0.12 um G U16 ULPA 99.999995 @ 0.12um U 17 ** All tested with thermally generated DOP aerosol (0.3 um MMD; ie, CMD is near MPPS) * All EN 1822 tests at MPPS (~0.12 um) Disposable fiberglass, washable aluminum or foam rubber Dust Spot % Arrestance weight % Particle Size ASHRAE 52.2 (Note: These comparisons of filter rating systems are only approximate as the test methods are different. ) EU type (approx.) EN 779 (approx.) 4985 4986 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 138 4987 The following outlines Level I thru III and Terminal Filtration 4988 parameters. 4989 4990 6.1.8.1 Level I Filtration (initial) 4991 4992 This is the lowest efficiency (and lowest cost) filtration level used 4993 for pre-filtration. Its intent to capture larger (3 microns and larger) 4994 particulates (insects, vegetation) typically introduced into an air 4995 handler from the outside air. It is also used as a pre-filtration to 4996 extend the life of Level II filtration. MERV 7 (EN G4) efficient 4997 filter is recommended. 4998 4999 6.1.8.2 Level II Filtration (initial) 5000 5001 This more expensive filtration is typically located directly downstream 5002 of Level I filtration to capture smaller sized (0.3 microns and larger) 5003 particles to protect the coils and fan in air handling units, ductwork 5004 and occupants. A MERV 14 (EN F7/8) efficient filter is recommended. 5005 5006 6.1.8.3 Level III Filtration (Final) 5007 5008 This filtration is located at the discharge section of the air-handling 5009 unit downstream of Level I & II Filtration and fans/coils, and could 5010 use either ASHRAE or HEPA type filters. 5011 5012 ASHRAE Type - captures released mold and other growth which could be 5013 generated on the condensing (wet) cooling coils and then travel through 5014 the ductwork and to personnel. A MERV 14 (EN F7/8) efficient filter is 5015 recommended. 5016 5017 HEPA Type - is used when the controlled space requires a clean room 5018 classification (typically limited to Grade 8 if used without terminal 5019 filtration), when redundancy (with a terminal HEPA) is deemed 5020 necessary, or an as an additional layer of protection to extend the 5021 life of the downstream terminal HEPA filters. These filters should have 5022 a seamless sealing gasket (preferred) or a silicon gel seal on the 5023 downstream side of the filter to form a positive seal to eliminate air 5024 bypass around the filter perimeter. Permanent upstream and downstream 5025 media protective screens (media guards) should be included to prevent 5026 physicaldamage to the filter media. Individual HEPA filters should be 5027 able to be replaced without disruption of adjacent filters. H14 5028 (99.995% @MPPS) efficient filter I recommended. 5029 5030 6.1.8.4 Terminal Filtration 5031 5032 This level of filtration uses HEPA filters typically at the supply air 5033 terminal, and associated with cleanrooms classified as cleaner than ISO 5034 8. A terminal filter may also be used on return/exhaust air when 5035 process room air is contaminated with environmentally sensitive 5036 particulates (hazardous airborne materials). These filters should have 5037 a silicone gel seal on the downstream side of the filter to form a 5038 positive seal to eliminate air bypass around the filter perimeter. 5039 Permanent upstream and downstream media protective screens (media 5040 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 139 guards) should be included to prevent physical damage to the media. 5041 Individual HEPA filters in filter banks should be able to be replaced 5042 without disruption of adjacent filters. H14 (99.995% @MPPS) efficient 5043 filter is recommended. 5044 5045 Terminal Air Filter Modules are constructed as either a single or 5046 multiple HEPA filter housing structure. They are positioned at the 5047 entry (ceiling) of the room and provide clean air into the space. 5048 5049 A terminal module is usually intended to house a single filter. 5050 The module should be complete with insulated housing (if ambient 5051 conditions surrounding the module would result in condensation), 5052 filter, test ports, grille, trim, and hardware. The body of the 5053 module is solidly constructed of cleanable rigid material (such as 5054 stainless steel or aluminum ) with the exposed trim being stainless 5055 steel. It should be designed for room side filter replacement. 5056 5057 A terminal plenum module or unidirectional air flow unit (UDF or 5058 UAF) is intended to house at least 2 filters to distribute 5059 unidirectional airflow over a specific area (typically an ISO 5 5060 classification space). They are fabricated structural plenums that 5061 house the air inlet opening, filters, dampers, challenge dispersion 5062 manifold, test ports, optional sprinkler system, and an integral 5063 grid for support of gel seal filled framed filters, flush mounted 5064 lighting and perforated grill. 5065 5066 Bag-in/Bag-out Housing is a side serviced filter housing designed to 5067 meet the air filtration needs of handling dangerous or toxic 5068 biological, radiological, cytotoxic or carcinogenic materials. It 5069 prevents hazardous airborne materials from escaping into the 5070 surrounding atmosphere. It is typically positioned at the perimeter 5071 (near floor) of the room where the material is generated. 5072 5073 The housing is constructed of stainless steel, should have zero 5074 leakage, and uses a control barrier to isolates personnel from 5075 hazardous materials when change-out of the HEPA filter is needed. 5076 The housing should have a silicon gel seal and be adequately 5077 reinforced to withstand a negative or positive pressure of 15" w.g. 5078 (3.75 kPa). 5079 5080 6.1.8.5 Avoiding problems with HEPA filter performance: 5081 5082 There are some specific issues with HEPA filters that have been 5083 observed in recent years in pharmaceutical cleanrooms which require 5084 some attention to detail in order to avoid. Two of these are 5085 5086 HEPA filter gel seal degradation, and 5087 HEPA filter bleedthrough. 5088 5089 HEPA filter gel seal degradation- 5090 5091 Degradation of gel seals has been observed in cleanroom applications as 5092 silicone (siloxane) gel which appears to revert to a liquid state and 5093 begins dripping out of the gel track. This is sometimes accompanied by 5094 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 140 a color change, such as fading to a clear or translucent appearance. 5095 This most often does not result in an observed integrity failure of the 5096 filter, but does present obvious sterility and safety issues. Studies 5097 problem have determined that this failure is due to the migration of 5098 unbonded polymer components out of the gel matrix, forming a slimy 5099 liquid on the surface of the gel. Factors which contribute to this 5100 include: 5101 5102 Crosslinking of the gel components 5103 5104 The more complete the crosslinking, the less unbonded polymer 5105 to migrate to the surface 5106 The specific gel type and the mixing (ratio of components, 5107 environmental conditions, time to complete the reaction, etc.) 5108 are key to amount of crosslinking. 5109 5110 Molecular weight of the gel 5111 5112 Higher molecular weight reduces the diffusion and migration of 5113 unbonded polymers 5114 Narrow weight distribution is desired at the higher molecular 5115 weights 5116 5117 Certain challenge aerosols (PAO, DOP, etc.) accelerate the rate of 5118 unbonded polymer diffusion 5119 5120 Acts as a solvent, increasing migration of unbonded polymers 5121 to the surface 5122 It does not appear that typical pharma cleanroom cleaning and 5123 sanitizing agents (such as bleach, hydrogen peroxide, etc.) 5124 affect the rate of unbonded polymer diffusion. 5125 5126 It is also recommended that miter joints and penetrations of the filter 5127 gel track be sealed with a material proven to be impervious to the 5128 silicone gel components (i.e., silicone gel components will penetrate 5129 silicone caulk). Urethane gels are not recommended as replacements for 5130 silicone gels in pharma cleanroom applications that will be exposed to 5131 cleaning and sanitizing chemicals, since their performance is affected 5132 by those chemicals as well as being affected by aerosol challenge 5133 materials such as PAO and DOP.* The filter manufacturer can help 5134 determine the appropriate silicon gel that maximizes crosslinking and 5135 molecular weight and provides satisfactory sealing characteristics 5136 (resiliency, adhesion, etc.). Reducing the amount of aerosol challenge 5137 to which the filters are exposed will also reduce the risk of gel 5138 degradation. 5139 5140 * Note on urethane gel seals; Urethane gel can fail in a mode similar 5141 to that of silicone gel failure, reverting to a liquid state. It may 5142 also form a tough skin on its upstream side, leading to poor bonding at 5143 the gel/knife edge interface. Fading of color does not appear to affect 5144 seal integrity. 5145 5146 Since urethane gels are hydrophilic, high humidity can affect the 5147 ability of the gel to cure. 5148 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 141 5149 HEPA filter bleedthrough 5150 5151 HEPA filter bleed-through is a phenomenon in which a filter fails a 5152 field integrity (leak) scan test using an aerosol challenge and a 5153 photometer with an observed leakage across the entire face of the 5154 filter media (not localized). This often occurs with filters that had 5155 previously passed a factory efficiency and scan test. It has been 5156 observed worldwide and is not limited to one filter or paper 5157 manufacturer. Further, it appears to be limited to HEPA (not ULPA) 5158 filters and to applications in which thermo-pneumatic (hot-block) 5159 aerosol generators were used for testing. Studies into the nature of 5160 this problem have resulted in determining that the following factors 5161 are crucial to understanding and avoiding the bleed-through problem: 5162 5163 - Particle size distribution of the challenge aerosol from the 5164 generator 5165 5166 - Impact of velocity on filter efficiency and bleed-through. 5167 5168 - Methods for specifyingand testing HEPA filters 5169 5170 Particle size distribution of the challenge aerosol from the generator- 5171 5172 Aerosol particle sizes generated from Laskin-nozzle type generators are 5173 larger than those from hot-block generators (MMD size of 0.5 to 0.7 5174 microns versus 0.2 to 0.3 microns). Although HEPA filters are often 5175 efficiency tested at 0.3 microns, the filters' actual Most Penetrating 5176 Particle Size (MPPS) is less than 0.3 microns, often in the 0.12 to 5177 0.25 micron range. Thus, HEPA filters which may pass an integrity scan 5178 test in the factory with a Laskin nozzle generator (at 0.5 to 0.7 5179 microns) may well fail a scan test in the field with a hot-block 5180 generator due to bleed-through. It is important the filter supplier 5181 know the field test challenge method to be used so the appropriate 5182 filter paper can be provided. Many issues can be avoided by simply 5183 stating the efficiency of the filter at the filter's MPPS. 5184 5185 Impact of velocity on filter efficiency and bleed-through- 5186 5187 Air velocity has a significant impact on filter performance. Increasing 5188 the velocity will decrease both the filter efficiency and the MPPS for 5189 that filter. Fr example, testing a specific filter for efficiency and 5190 integrity at 100 fpm face velocity and then field integrity testing at 5191 150 fpm will likely result in different results, Filter performance 5192 should be specified for the intended face velocity. 5193 5194 Methods for specifying and testing HEPA filters- 5195 5196 Bleed-through problems have been noted in filters that are integrity 5197 tested with hot-block generated aerosols up through commercially 5198 available filter classes Class C (Class J) and standard EN-1822 H14 5199 filters. 5200 5201 In summary, bleed-through of HEPA filters occurs when they are 5202 subjected to field testing conditions which are more stringent than 5203 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 142 their factory test conditions. This may occur when: 5204 5205 - Actual field velocities are higher than factory tests 5206 5207 - Actual field aerosol challenge particle sizes are smaller than 5208 factory tests 5209 5210 - HEPA filter is not specified appropriately for actual field 5211 conditions 5212 5213 Recommended practices to avoid the bleed-through problem would be to: 5214 5215 - Specify the filter for the velocity it will see in the installation 5216 5217 - Factory test for efficiency and leakage at that velocity at the 5218 filter's MPPS 5219 5220 - If the filter will be field integrity tested with a hot-block 5221 generator, the filter should meet (as a minimum) the requirements for 5222 an IEST Type K or an EN-1822 Type H14 with a local penetration limit of 5223 two times the global penetration (i.e. 0.01%) instead of the standard 5224 five times (0.025%) as called for in EN-1822. 5225 5226 6.1.9 Ductwork 5227 5228 Ductwork construction and testing should be in accordance with Sheet 5229 Metal and Air Conditioning Contractors‘ National Association (SMACNA) 5230 and Heating and Ventilating Contractor‘s Association (HVCA) standards. 5231 Ductwork should be constructed of galvanized sheet metal. Stainless 5232 steel should be used when corrosion and continual cleaning occur. There 5233 shall be no interior insulation. Ductwork needs to be adequately 5234 supported so as to easily carry the weight of ductwork and insulation 5235 along with in-line equipment and controls. If noise is a concern in-5236 line silencers should be installed. If vibration is an issue, flexible 5237 support and connections should be considered. When flexible ductwork is 5238 required to tie the branch into the terminal air device, its length 5239 should be keep to a minimum and should not exceed 10 feet (3 m). 5240 5241 Abrupt changes in the size and direction of the ductwork should be 5242 avoided otherwise increased noise, vibration, and pressure drop will 5243 result. Provide sufficiently sized duct access doors at appropriate 5244 locations to equipment (e.g. coils, humidifiers, control boxes, 5245 dampers). To preclude air leakage all ductwork shall be sealed with 5246 approved fire and smoke rated sealant in accordance with NFPA 255 or UL 5247 723 or equivalent. Ductwork leak testing percentages will vary from 5248 site-to-site, air system, and areas served. Recommendations include 5249 the following performances for various applications. Ductwork should 5250 have 1% leakage with 0% leakage on positive pressure exhaust, 4‖ w.g 5251 (0.996 kPa) minimum static pressure class, and a maximum seal class A. 5252 5253 6.1.10 Dampers and Louvers 5254 5255 Dampers are used to redirect, stop and vary the amount of air traveling 5256 within an HVAC System. Damper blade movement can be either parallel or 5257 opposed. Parallel blade dampers rotate in the same direction so that 5258 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 143 they stay parallel to each other throughout their travel from full open 5259 to full closed. Opposed blade dampers operate such that adjacent 5260 blades rotate in the opposite direction from each other. 5261 5262 Opposed blade dampers are preferred for their smooth throttling flow 5263 for they have a more linear performance due to less turbulence. 5264 5265 For mixing applications it is preferred to use parallel blade dampers 5266 since they deflect air streams that can encourage mixing. It is 5267 preferred to orientate the physical location of the outdoor air and 5268 return air entry points into the mixing plenum to direct the air 5269 streams into each other. 5270 5271 Louvers are typically constructed to have no moving parts and are 5272 typically used for outside air intake. Outside air inlet velocities 5273 shall prevent drawing in of rain (recommended maximum of 3.05 m/s (500 5274 fpm) through the free area). For areas that experience significant 5275 snow, openings shall be equipped with a 90-degree gooseneck inlet sized 5276 for a maximum of 1.02 m/s (200 FPM) and shall be equipped with an inlet 5277 louver sized for the same velocities. All louvers shall be drainable 5278 and be constructed of anodized aluminum or stainless steel with 304 SS 5279 hardware, and include 304 SS bird screens. 5280 5281 Wind driven rain can be forced into outside air intakes with such force 5282 the rain can be pulled thru the air handling sections and sent down the 5283 supply ductwork. It is advisable to select a storm louver for outside 5284 air intakes that meet those rare occasions for unseasonable weather to 5285 avoided pulling moisture into system. 5286 5287 It is preferred that the outdoor air intake, return and exhaust and/or 5288 relief dampers to be rated for low leakage to prevent the infiltration 5289 or infiltration of air when the systems are off or in hostile 5290 conditions. Low leakage dampers should have vinyl seals that are 5291 mechanically attached (not glued) to the damper blade and jamb seals to 5292 prevent leakage around the ends of the damper blades. 5293 5294 Sufficient space should be provided to remove and install actuators 5295 without the need to remove dampers or other equipment. Dampers should 5296 be made of corrosion-resistant materials of aluminum or 304 SS. Damper 5297 jackshaft should be extended to the exterior of the AHU for actuator 5298 mounting for interior AHUs. 5299 5300 The placement of outside air intake louvers for an air handler must 5301 take into account the location of fume and exhaust stacks, sewer vent 5302 pipe and cooling towers, which can have a negative effect on indoor air 5303 quality. There are local and regional codes thatprovide minimum 5304 distances and these requirements must be followed. 5305 5306 6.1.11 Diffusers and Registers 5307 5308 These devices are critical to the air distribution in and out of 5309 spaces. Proper positioning is vital for providing good distribution and 5310 a sweeping action of the air from the supply to the return side of the 5311 space to deliver uniform air patterns to cleanse the environment and 5312 displace contaminants. Poor positioning can result in either dead 5313 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 144 zones, which can cause an increase in particulates levels, or excessive 5314 airflow, which can cause unwanted air turbulence. 5315 5316 Since these devices are located at the perimeter of the space (ceilings 5317 and walls), the choice of materials must be evaluated for compatibility 5318 of the room‘s function. For clean room operation, stainless steel is 5319 preferred to eliminate corrosion and rusting, which can occur to other 5320 materials and finishes that can occur during wash downs using 5321 aggressive cleaning agents. 5322 5323 Terminal filtration modules are used with room side HEPA filters to 5324 supply clean air operation and to retain contaminated air from leaving 5325 the room. Refer to the Filtration section for more detail. 5326 5327 6.1.12 Ultraviolet (UV) Light 5328 5329 Ultraviolet light is an engineering control that may be used to 5330 supplement the existing filtration device(s) in a building‘s HVAC 5331 system. They can be mounted inside air ducts and placed adjacent to 5332 cooling coils and condensate drip pans where biological growth can 5333 easily occur and lead to energy losses due to heat transfer reduction 5334 caused by fouling. 5335 5336 UV light has a wavelength of 100 – 400 nm, with the UVC (200 – 280 nm) 5337 wavelength considered the germicidal killing range, since it 5338 effectively inactivates bacteria and viruses. When microbes (bacteria, 5339 bacterial spores, viruses, yeast, mold and mold spores) are exposed to 5340 sufficient doses of UVC light, their DNA is destroyed, causing cell 5341 death or making replication (cell division) impossible. The optimal 5342 microorganism frequency killing occurs at the 253.7 nm wavelengths of 5343 UVC. To achieve the microbial inactivation the UV radiation exposure 5344 must be at least 400 J/m2. Many variables (air flow, humidity, 5345 distance of microorganism to the UV light and time) take place in a 5346 real world environment that will influence the dosage needed to cause 5347 microbial inactivation when exposed to the UV radiation. However, it is 5348 proven that UV light will kill any DNA-based organism given enough 5349 dosage and that UV light breaks down DNA over a cumulative basis. 5350 Therefore, as air circulates through the HVAC system containing a UV 5351 light, the UV light continuously cleanses the air. Extensive testing 5352 has been completed, which establishes the minimum UV exposure 5353 intensity/dosage needed to inactivate the microorganisms you are 5354 looking to control. 5355 5356 Ultraviolet germicidal irradiation (UVGI) systems are typically 5357 comprised of a series of lamps and ballasts. The recommended 5358 construction should include stainless steel lamp holding assembly and a 5359 remote NEMA 12/13 control panel equipped with an electronic ballast, 5360 power supply, indicating lights, and a manual UV output control. 5361 Reflective polished aluminum paneling should be included to offer an 5362 economic means of boosting the average intensity field without 5363 additional power consumption. The system shall be safeguarded against 5364 accidental UV exposure. Air temperature is a consideration when 5365 specifying a cooling coil irradiation UV system, as the temperature 5366 inside the lamp is directly related to the UV output obtained. 5367 5368 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 145 Since accumulation of dirt will decrease both the effect and life of 5369 the UV lamps, high efficiency upstream filtration is needed. 5370 5371 6.1.13 Reliability and Maintenance Enhancements 5372 5373 The reliability and maintenance of equipment is of utmost importance 5374 within the pharmaceutical industry. Robust design and construction of 5375 HVAC equipment will increase their reliability and maintainability to 5376 perform properly from the start up of the operation and will continue 5377 beyond their normal anticipated life when they are properly maintained. 5378 Good maintenance procedures performed in a timely manner will over the 5379 life of the equipment, reduce costs and will have a positive impact on 5380 the outcome of the production process. Vivariums are extremely 5381 sensitive operations with long-term studies that require reliable and 5382 redundant systems, so as to achieve steady environmental conditions. 5383 5384 The following are some of the reliability and maintenance items that 5385 should be included: 5386 5387 Redundant fans 5388 Direct driven fans 5389 Vibration monitoring of blower and motor bearings 5390 Automated lubrication 5391 Bearing life of ABMA L10 200,000 hours 5392 Lower rotation speeds of motors and fan wheels 5393 High efficiency filters 5394 5395 6.1.14 Energy Reduction 5396 5397 Designers are urged to find the simplest, effective solution for an 5398 HVAC system. Ideally the fan power should be reduced with load 5399 (variable air flow). If this is not possible, then the systems should 5400 be designed to reduce airflow during unoccupied periods for all or part 5401 of the system. 5402 5403 Designers are urged to fully investigate the required internal design 5404 criteria to avoid unnecessary energy use, to meet excessive high or low 5405 temperature or humidity requirements. This is also relevant for values 5406 of air change rates and pressure differentials. Similarly the external 5407 design conditions should also be investigated, to avoid over sizing of 5408 systems resulting in less than optimal performance and added project 5409 and operational costs. 5410 5411 Dedicated units for areas with specific requirements (i.e., longer 5412 hours of operation, lower or higher temperature and humidity, specific 5413 processing equipment, etc.) should be specified that would allow for 5414 the shut down or set back of central systems. 5415 5416 The control and use of outside air should be carefully evaluated to 5417 avoid additional air quality conditioning, resulting in a substantial 5418 energy penalty. The guidelines established in ASHRAE 62.1, Ventilation 5419 for Acceptable Indoor Air Quality, should be followed to ensure a 5420 healthy indoor environment. 5421 5422 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 146 Designers are urged to increase air handling coil area, distribution 5423 duct and piping sizes as much as practical to reduce friction losses 5424 affecting fan and pump sizes. As previously indicated, reduced energy 5425 costs should be significantly greater than that, which would occur from 5426 the increased capital costs over the life of the building. 5427 5428 Avoid over sizing equipment for future needs unless it is deemed a 5429 likely probability to occur, as this could mean that a fan or pump will 5430 be operating at an inefficient part load condition. If this is 5431 unavoidable, use VFD control of the fan or pump. 5432 5433 6.1.14.1 Air Filtration Systems 5434 5435 Use filters with good filtration efficiency with a comparatively low 5436 average pressure drop. The low average pressure drop translates into 5437 reduced fan power and then into energy savings. Also good filtration 5438 results in cleanercoils and equipment to optimize heat transfer and 5439 reduced frequency of equipment wash down. 5440 5441 6.1.14.2 Drive Belts 5442 5443 Up to 7% efficiency can be lost with traditional v-belt drives due to 5444 belt slippage from worn and improper tensioning. This can be reduced 5445 dramatically by using direct driven fans when possible. Cogged or 5446 synchronous belt drives should be considered which could improve the 5447 drive efficiency by 2% In addition to saving energy, synchronous belts 5448 run cooler and tend to last longer then v-belts 5449 5450 6.1.14.3 Economizer 5451 5452 The outside air economizer saves on cooling energy when outside ambient 5453 conditions (sensible & latent heat) are favorable (typically in the 5454 shoulder months of the year) rather than using warmer return air to 5455 reduce the load on the cooling section. When the outside ambient 5456 temperature conditions are lower than the inside space temperature, 5457 increased draw of the cooler and less humid outside air will reduce 5458 cooling energy that would otherwise come from mechanical cooling. An 5459 outside air economizer is a collection of air dampers and controls that 5460 allows the outside air to be drawn into the air handler. Typically, 5461 this is setup as an all or no situation, meaning that when comparing 5462 the inside to outside conditions, the condition that is most favorable 5463 to cause the lower energy usage would apply. 5464 5465 Since the supply, return, outside and exhaust air quantities can change 5466 during the function of the economizer cycle; this can lead to changes 5467 in the facility room pressurization. If another air handler is serving 5468 an adjacent area, it is possible for room pressure excursions to occur 5469 due to the changing air quantities as a result of varying positions of 5470 dampers in the HVAC system. The use of the economizer in areas that 5471 require pressurization control must be carefully evaluated to adopt. 5472 This operation is typically limited to non-classified operations. 5473 Additionally, the use of additional outside air can shorten filter life 5474 due to filtering of less cleaner outside air. The control and use of 5475 outside air should be carefully evaluated to avoid additional air 5476 quality conditioning, resulting in a substantial energy penalty. The 5477 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 147 guidelines established in ASHRAE 62.1, Ventilation for Acceptable 5478 Indoor Air Quality, should be followed to ensure a healthy indoor 5479 environment. 5480 5481 6.1.14.4 6Heat Recovery – Desiccant Wheel 5482 5483 Desiccant heat recovery wheel recovers total energy (sensible as well 5484 as latent heat). Supply and exhaust ducting configuration is important 5485 and needs to be routed to be adjacent at the heat recovery device. 5486 Purge section and labyrinth sealing system limit cross contamination to 5487 0.04% of the exhaust air concentration by volume. Certain vapors in the 5488 exhaust stream may be retained in the wheel, to be released into 5489 entering fresh air. 5490 5491 6.1.14.5 6Heat Recovery – Air-to-Air Plate Exchangers 5492 5493 Air-to-Air plate exchangers normally used to recover sensible heat from 5494 general and toilet exhausts and transfers it to the incoming outside 5495 air. Supply and exhaust ducting configuration is important and needs to 5496 be routed to be adjacent. Reduced heating demand will reduce mechanical 5497 heating equipment sizing and operating costs. 5498 5499 6.1.14.6 Heat Recovery – Run Around Coil 5500 5501 Run around coil, normally used on 100% outside air units by 5502 transferring sensible heat only from an exhaust air stream to a make up 5503 air stream via coils and piping normally filled with a glycol solution 5504 to avoid freezing. Is best applied where heating requirements are 5505 dominant. Additional fan power is required due to increased airside 5506 static pressure. The recovered heat will reduce demand from mechanical 5507 heating equipment resulting in possible downsizing and reduced 5508 operating costs. 5509 5510 6.2 EQUIPMENT INSTALLATION AND STARTUP 5511 5512 6.2.1 Introduction 5513 5514 The following provides information for the installation and startup of 5515 various HVAC equipment. Care must be taken during the installation and 5516 startup in order to preclude operational and maintenance problems. It 5517 is not intended to be all-inclusive, and the user should consult with 5518 the equipment manufacturer for specifics and procedures that are more 5519 detailed. 5520 5521 6.2.2 Air Handling Units (AHU) 5522 5523 Air Handling Units (AHU) contain a number of components, which work in 5524 concert to provide conditioned air to the space. There are a number of 5525 installation and startup items specific to the air handler itself that 5526 are presented in this section. Internal equipment (fans, coils, 5527 dampers, filters, etc.) will be presented within their own sections. 5528 5529 Larger air volume air handling units are typically disassembled and 5530 each section is separately wrapped for shipment. When the unit or 5531 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 148 sections are to be moved, they shall be lifted vertically, on a level 5532 plane by their lifting lug bracket arms, to prevent distortion and 5533 stress on the components. It is strongly recommended that an 5534 experienced rigger supervise the lifting and installation of the 5535 equipment. 5536 5537 The air-handling units shall be stored in a dry and protected area, to 5538 ensure that the components (fan- shaft, bearings, and wheel, coils, 5539 humidifiers, and filters) are shielded against dust and corrosion. If 5540 the unit is to be stored for more than one month prior to startup, 5541 equipment with bearings shall have their shafts manually rotated every 5542 two weeks to not cause premature bearing failure and redistribution of 5543 the lubricant. 5544 5545 The AHU shall be positioned to allow for sufficient free space for 5546 servicing of its utility connections (steam, chilled and hot water and 5547 electric,) and internal components (e.g. coils, motors, filters). It is 5548 to be mounted on a rigid, level foundation for proper alignment of the 5549 fan and drive equipment, freedom from excessive vibration and for the 5550 removal of condensate. It shall be positioned with sufficient height to 5551 allow for proper condensate drainage using a P-trap and for ease of the 5552 trap‘s removal and cleanout. 5553 5554 When reassembling sections of the AHU, gaskets and RTV sealant should 5555 be used to eliminate air leakage. Minimal sealant should be applied to 5556 produce a clean, smooth and level bead surface. 5557 5558 All permanent utilities including electric, chilled and hot water, and 5559 steam are to be tied into the AHU equipment. 5560 5561 Procedures should be taken during the installation and start up of the 5562 unit, to preclude dirt and debris accumulating within and around the 5563 unit. The interior of air handler shall be wiped down to remove any 5564 residual oil and grease. 5565 5566 Prior to startup, a checklist should be completed to foster smooth 5567 operation. 5568 5569 Fasteners, bolts, wheel hub set screws and bearing locking collars 5570 shall be checked for tightness before equipment start up. 5571 5572 Shipping tie down bolts and shims must also be removed before air 5573 handler start up. 5574 5575 Dampers on air handler should operate freely and blades closed tightly. 5576 Adjust linkage to close any open blades. 5577 5578 When supplied with a variable frequency drive, start the unit at low 5579rpm and increase its speed slowly up to its maximum capacity. Listen 5580 for unusual noise and inspect for increased vibration and overheating 5581 of bearings. 5582 5583 Tests to be included: 5584 5585 Perform a pressurized leak test to ensure joints/connections are 5586 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 149 properly aligned and air handler cabinet is not leaking in excess of 5587 the specified value. 5588 5589 Condensate drain pans shall be filled with water to confirm that proper 5590 drainage occurs while the unit is operating. 5591 5592 6.2.3 Fans 5593 5594 Proper fan installation and startup are critical for producing 5595 sufficient airflow in a safe manner since a tremendous amount of 5596 kinetic energy is produced and without this, catastrophic results can 5597 result. 5598 5599 Laser alignment must be performed on the fan and motor shafts shall be 5600 completed when the fan has been installed at the site because shipping 5601 and installation can alter the factory alignment. 5602 5603 Drive belts shall be adjusted to their proper tension prior to start 5604 up. Following a short period of operation, the belts will need to be 5605 re-tensioned. 5606 5607 Bearings must be checked for proper lubrication. If automatic 5608 lubrication units have been installed, they should be activated only at 5609 the time of startup. 5610 5611 Fan wheel should be turned over by hand to see that it runs free and 5612 does not strike fan housing. Check location of wheel in relation to 5613 fan inlets and be sure fan housing is not distorted. Electrically jog 5614 the fan to check for proper rotation. 5615 5616 Vibration testing shall be performed following installation and start 5617 up to promote longevity and reliable operation of the equipment. 5618 5619 6.2.4 Exhaust / Extraction Systems 5620 5621 These systems are intended to remove unwanted air from within the 5622 building. When installing exhaust / extraction systems, the following 5623 items should be followed: 5624 5625 It is recommended to have the exhaust fans placed on the exterior of 5626 the building so as to produce a negative pressure on all ductwork 5627 within the building to eliminate the possibly of contaminated air not 5628 being totally exhausted from the building. Ductwork shall have the 5629 installation quality of achieving zero leakage. 5630 5631 The mounting of stacks should be carefully evaluated. Their location 5632 can cause undue air contaminants to reenter the building through air 5633 intakes along with producing noise that could be an annoyance to 5634 surrounding businesses and residential communities. 5635 5636 Ductwork or stacks should be independently supported since the 5637 additional weight may stress the fan housing and result in vibration, 5638 which can transmit to building structure. Guide wires (supports) will 5639 need to be evaluated for inclusion onto stacks to ensure adequate 5640 support. 5641 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 150 5642 When condensation may occur, the duct system should be watertight and 5643 provisions should be made for proper sloping and drainage. 5644 5645 Install fire dampers and explosion vents in accordance with the 5646 National Fire Protection Association Codes and other applicable codes 5647 and standards. 5648 5649 Locate fans and filtration equipment such that maintenance access is 5650 serviceable. 5651 5652 6.2.5 Heating & Cooling Coils 5653 5654 Coils should be inspected for concealed or visible damage prior to 5655 acceptance of delivery. The coil fins should be combed after 5656 installation to foster good air distribution and heat exchange. 5657 5658 Piping to the coil must be independently supported to avoid deforming 5659 the coil nozzle, headers or tubes, and stressing the brazed joints. It 5660 is recommended that piping have shut off valves and union fittings to 5661 facilitate coil removal, should repairs be necessary. 5662 5663 Insulation with protective jackets should be included on all piping to 5664 eliminate burning, condensation and reduce heat loss/gain. 5665 5666 For better control of the fluid flow through the coil, the control 5667 valve should be put on the return piping. 5668 5669 Supply and return line shut-off valves should be provided to facilitate 5670 service and maintenance. 5671 5672 Coils must be vented of air on initial start-up and should include a 5673 manual or an automatic air vent. 5674 5675 For cooling coils, the term ―moisture carry-over‖ describes the action 5676 of condensate being blown off the coil‘s surface with cooled air. 5677 Following startup when dehumidification occurs, observe if moisture 5678 carry over does not occur. If it does occur, check the coil face 5679 velocity to make sure it doesn‘t exceed the design parameters. If 5680 carryover occurs, then the following resolutions are available: 5681 5682 Reduce the coil face velocity (may not be possible if rooms need more 5683 airflow) 5684 5685 Install a perforated screening so as to more evenly distribute the air 5686 across the coil thus producing a more even face velocity 5687 5688 Install a mist eliminator after the coil 5689 5690 6.2.6 Humidifiers 5691 5692 The steam distribution manifold should be placed where the air 5693 temperature is capable of absorbing steam being discharged without 5694 causing condensation at or after the unit. This will normally be 5695 downstream of the heating coil and upstream of the cooling coil to act 5696 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 151 as a mist eliminator when located within an AHU. 5697 5698 When located within ductwork, approximately 1foot (30cm) upstream and 6 5699 ft (1.8 M) downstream of the humidifier, the ductwork should be 5700 constructed of stainless steel to eliminate the possibility of rusting 5701 if the ductwork becomes wet. Access panels should be located up and 5702 downstream of the humidifier for servicing. 5703 5704 A drain pan and condensate piping should be included to catch and carry 5705 away water, which typically can occur from humidification spitting 5706 during startup. Do not place the steam distribution manifold where 5707 visible discharge mist will impinge directly on a metal surface. 5708 5709 Do not place the steam distribution manifold too near to the face of 5710 filters, otherwise the possibility of saturating the filters will 5711 greatly shorten their life. 5712 5713 Humidifier steam supply should be taken off the top of the steam main 5714 rather than off the bottom to ensure, the driest steam is provided to 5715 the distribution manifold. 5716 5717 To assure that absorption of the steam will take place into the air 5718 stream, air duct design needs to permit uniform airflow over the cross 5719 section of the steam distribution manifold. 5720 5721 A high limit humidity sensor shall be installed within a relatively 5722 short distance of the humidifier after absorption of the steam has 5723 occurred to shut the humidifier control valve if the air stream 5724 relative humidity typically exceeds 85% to preclude the accumulation of 5725 moisture onto surfaces. 5726 5727 A device to prove airflow is recommended to prevent steam valve from 5728 opening unless air is moving in duct. 5729 5730 6.2.7 Dehumidifiers 5731 5732 This section focuses only on desiccant dehumidification systems since 5733 they are the most common means of removing moisture for the 5734 pharmaceutical industry. 5735 5736 Desiccant units shall have provisions for clear and unobstructed 5737 space/clearance to allow removal and replacementof the desiccant 5738 wheels, fans filters, etc. 5739 5740 The air from the reactive portion of the wheel should be ducted (sloped 5741 to the outside) to the exterior of the building due to its high 5742 moisture and heat content. Do not locate the intake and outlet for the 5743 process and reactivation air streams too close together to avoid short 5744 cycling, which will lesson the overall dehumidification capacity. 5745 5746 5747 5748 Wheels using lithium chloride should be kept hot and rotating, even 5749 when dehumidification is not required, to avoid damage to the desiccant 5750 due to over-absorption. 5751 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 152 5752 6.2.8 Air Filtration 5753 5754 Filters should be installed prior to construction to keep the AHU, 5755 components and ductwork clean from contaminants when the system is 5756 energized to preliminarily conditioned spaces. Once construction of the 5757 building and spaces has been completed, these filters shall be removed 5758 and replaced with clean filters. 5759 5760 Filters should be installed with appropriate clamping mechanisms to 5761 assure that all air travels through the filters and does not bypass 5762 around them or their supporting grid. 5763 5764 Each filter section should have a Magnehelic® (local display only) or 5765 Photohelic® (local and BMS contacts) gauge, or equivalent, mounted with 5766 3-way valves for ease of calibration and without the need for shutdown. 5767 The gauge piping allows for differential pressure readings for each or 5768 combination of filters. 5769 5770 HEPA/ULPA filters are sensitive components and should be handled with 5771 special care and consideration needs to be taken in the selection of 5772 the carrier used for transport of filter shipment. The filters shall be 5773 stored in such a manner as to prevent damage or intrusion of foreign 5774 matter. The recommended controlled storage environmental for the 5775 filters should be within 40–100 ºF (4–38 ºC) and 25–75% RH. Storage 5776 should be indoors, under roof and be thoroughly protected from 5777 moisture. 5778 5779 Carefully check each pallet of filters before accepting shipment from 5780 the carrier. Pallets of filters that have been damaged or broken down 5781 should not be accepted without a thorough inspection and appropriate 5782 comments noted on the shipping documentation. 5783 5784 Competent personnel and proven techniques and procedures should be 5785 established for the installation of the filters. Prior to installation 5786 of HEPA/ULPA filters, inspect duct and filter housing for cleanliness 5787 and any obstructions that might impair filter operation. Unpack the 5788 filter and thoroughly inspect for damage. Exercise extreme caution to 5789 avoid damaging the filter media. If the media is damaged and has any 5790 visible holes, do not install filter. 5791 5792 6.2.9 Ductwork 5793 5794 Ductwork is typically located in difficult to access locations. 5795 Sufficient access to service components such as volume control devices 5796 and reheat coils should be provided. Protection of the ductwork during 5797 construction and access to and around it must be adequately provided; 5798 otherwise, damage to the ductwork will result in loss of airflow 5799 transmission and increased air pressure and velocity. In addition, 5800 insulated ductwork that has been compromised will result in 5801 condensation and rusting and loss or gain in heat. 5802 5803 The use of flexible ducting should be limited to minimum lengths, 5804 properly supported and securely fastened at each end. Avoid sharp 5805 bends and turns, which will reduce the cross-sectional area of the 5806 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 153 flexible duct, that can result in reduced air volume delivery. 5807 5808 Ductwork shall be thoroughly wiped and cleaned of oil, dirt, and metal 5809 shavings after fabrication at the sheet metal shop and prior to field 5810 installation. Use a solution of 70% IPA and lint free wipes to remove 5811 any oils or grease, which has accumulated during the fabrication and 5812 installation of the ductwork. 5813 5814 After ductwork is cleaned, openings should be covered with plastic 5815 sheeting and tape to preserve their state. 5816 5817 It is recommended to avoid use of self drilling sheet metal (Tek) 5818 screws as they generate small metal chips as a result of drilling into 5819 the ductwork, depositing these contaminants inside the cleaned 5820 ductwork. Self piercing (zip) screws are preferred when there is 5821 concern for loose contamination fragments inside the ductwork. 5822 5823 Other trades who later install pressure test ports, smoke detectors, 5824 temperature sensors and duct traverse testing ports can contaminate 5825 interior of ductwork with metal chips as a result of their field 5826 penetrations into duct. Ductwork penetrations of the duct wall should 5827 be performed in a manner to maintain ductwork interior cleanliness. 5828 Where metal shavings or debris are produced, clean interior of duct, 5829 providing access as required and sealing the access opening. Failure 5830 to follow these practices can result in sharp metal fragments being 5831 blown into the delicate HEPA filter media causing nuisance filter 5832 integrity failures. 5833 5834 Prior to insulating and pressure testing new ductwork, the Owner or 5835 Owner‘s representative should perform a field inspection to ensure 5836 installation is in compliance with design specifications. A simple 5837 check list can be developed. 5838 5839 It is recommended to apply tight air leakage tolerances and perform 5840 pressure testing of ductwork systems serving a cGMP system to avoid: 5841 5842 Increase use of outside air to overcome supply losses 5843 5844 Increase in energy costs to operate system 5845 5846 Operating equipment at their maximum capacity resulting in no reserve 5847 capacity 5848 5849 Unwanted air into surrounding spaces from positive pressurized ductwork 5850 and into negatively pressurized ductwork 5851 5852 It is recommended to use the ―Total Percentage Method‖ - A percentage 5853 of total air delivery of duct section under test at a specific static 5854 pressure for performing duct leakage. The following are recommended 5855 leakage percentage for various operations: 5856 5857 Increase use of outside air to overcome supply losses 5858 5859 Zero percent leakage for positive pressure exhaust duct on hazardous 5860 operations 5861 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 154 5862 No more than One (1) percent for cGMP areas 5863 5864 No more than Two (2) percent for laboratory systems 5865 5866 No more than Three (3) percent for support and administrative areas 5867 5868 Classified and Rooms requiring pressure differential Test 100% Supply and Return Laboratories Test 100% Supply and Return/Exhaust BSC and Hoods Test 100% Support and Admin areas Test 50% Supply & return 5869 Table 6-3 Ductwork Testing Requirements 5870 5871 The duct leakage testing must be performed with traceable calibrated 5872 test instruments and documented with signed approvals from the owner or 5873 owner‘s representative. 5874 5875 Leakage from non-duct components (fire dampers, smoke dampers, air flow 5876 monitors, duct heating coils, manual volume damper quadrants and access 5877 doors) is an integral part of the overall system leakage, and these 5878 components shall be involved in the duct leakage tests. 5879 5880 It is recommended the Owner or Owner‘s representative be present to 5881 witness and sign off on duct cleanliness and ductleakage testing. 5882 5883 Once construction is completed, the system should be blown down for a 5884 period of 1 hour to purge the ductwork of any loose and light debris 5885 that may have accumulated. Blow down will not flush the system of 5886 metal fragments as a result of poor ductwork cleanliness quality 5887 control. 5888 5889 6.2.10 Dampers & Louvers 5890 5891 Actuators must be accessible for service and maintenance. Inspect 5892 drive linkages so they are secure and will operate without binding over 5893 their full range of travel. 5894 5895 To reduce bypass around damper perimeter, assemblies should be sealed 5896 to the framing of the opening. 5897 5898 6.2.11 Diffusers and Registers 5899 5900 Diffusers and registers should be installed in such a way to prevent 5901 poor distribution of air, minimize drafts, and short-circuiting of 5902 supply air. 5903 5904 6.2.12 Ultraviolet (UV) Lights 5905 5906 UV lighting wavelength degrades many plastics (including synthetic air 5907 filters media and frames, plastic coated wires, gaskets, grommets, and 5908 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 155 duct insulation). Avoid direct UV exposure where possible and keep the 5909 material at least 3 feet (~1 m) from the light source. 5910 5911 UV power supply circuit should be interrupted upon the loss of airflow 5912 over the lighting elements. 5913 5914 The UV power supply should be de-energized when the lamp access door is 5915 opened or when the door of the air handler is opened. This is to 5916 protect personnel from UV exposure. UV installations should minimize 5917 escape of the light through direct or indirect transmission. In 5918 addition, warning signs should be placed in the area to advise 5919 personnel. 5920 5921 When installing lamp fixtures, consideration should be given to the 5922 heat dissipation of the ballast and the additional heat load produced 5923 in the conditioned air stream. If the ballast is installed externally 5924 to the duct then heating is usually not an issue. 5925 5926 Do not touch emitter glass without gloves. Oil from fingerprints will 5927 permanently etch glass of emitter and weaken structure. If necessary 5928 clean emitter using isopropyl alcohol and lint free wipe. 5929 5930 6.2.13 Building 5931 5932 Construction activities typically occur at a tightly coordinated and 5933 accelerated pace to meet schedule commitments. The Owner needs to 5934 review the site on a regular schedule to verify design intent, 5935 construction quality and integration of systems occur as planned. 5936 Ongoing site visits should be conducted during all phases of the 5937 building construction and the installation of equipment and services. 5938 One of the main reasons for auditing is to identify deficiencies that 5939 if not corrected will result in unacceptable conditions, which can 5940 affect the performance of the HVAC system. The following identify just 5941 some of the construction issues. 5942 5943 Air migration through the building caused by poorly and unsealed 5944 penetrations and finishes can lead to unacceptable control of space 5945 differential pressures, fumes and dirt which will compromise room 5946 classification. The following items should be checked, noted and 5947 resolved during walk throughs. 5948 5949 piping 5950 ductwork 5951 electrical conduit and receptacles 5952 doors 5953 diffusers and registers 5954 architectural wall and ceiling joints 5955 lighting fixtures 5956 5957 The gap between the finished floor and the bottom of door should be 5958 uniform at approximately 3/16 inch (4 mm) when closed. Door floor 5959 sweeps are not recommended for swinging doors due to their accumulation 5960 of dirt, scratching of floor, and maintenance. 5961 5962 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 156 Hard-ceiling construction is preferred for pressure-controlled spaces. 5963 In addition, air migration above the ceiling should be minimized 5964 between controlled and uncontrolled space. 5965 5966 Where possible, service distribution and pipe work should be located 5967 outside the cleanroom, in an adjacent utility space to promote better 5968 airflow patterns and produce fewer pockets for dirt to accumulate. In 5969 addition, this action will increase maintainability of the equipment. 5970 5971 During construction, cleaning procedures should be enforced to minimize 5972 the accumulation of construction debris and dirt. If this is not 5973 controlled, extensive time and repetitive cleanup steps will be 5974 required, which will affect the commissioning and qualification of the 5975 building and HVAC systems. 5976 5977 Procedures should be in place for all personnel to wear appropriate 5978 gowning (i.e. – booties, smocks) so as to keep out dirt from areas 5979 which have been designated and substantially complete and cleaned, in 5980 addition to providing tacky floor mats and shoes cleaners. At this time 5981 equipment, walls, floors should have been wiped down, floors swept and 5982 vacuumed. 5983 5984 6.3 EQUIPMENT OPERATION AND MAINTENANCE 5985 5986 6.3.1 Introduction 5987 5988 The maintenance of systems is vital to achieving proper operation, 5989 appearance, longevity and safety. Inadequate maintenance will 5990 eventually lead to unexpected and extended shutdowns. It will also lead 5991 to underperformance for maintaining the various environmental 5992 (temperature, humidity, air quality, air flow and pressurization) 5993 aspects required for good cGMP facilities. 5994 5995 Predictive Maintenance describes a range of technologies used to detect 5996 developing machinery degradations at an early stage, before they can 5997 become a problem. This allows maintenance personal to order parts, 5998 schedule manpower, and plan multiple repairs during a scheduled 5999 shutdown. The goal of PdM is to proactively correct machinery 6000 degradation before significant deterioration occurs to a critical 6001 component or equipment item. 6002 6003 Traditional Preventative Maintenance (PM) practices cannot identify 6004 mechanical equipment failures that are preceded by detectable changes 6005 in operating temperature, vibration signatures, and bearing wear 6006 indictors. Equipment is susceptible to unplanned catastrophic failure 6007 that interrupts production operations, causes risk to product, and 6008 results in reactive repairs that are more expensive than planned 6009 repairs. 6010 6011 Physical appearance of equipment and the surroundings can convey a 6012 perception of the quality of the maintenance performed upon the 6013 equipment. Spent materials, extra parts and trash could give a 6014 regulatory inspector the impression of sloppy maintenance practices. 6015 Maintaining clean heating, ventilation and air-conditioning (HVAC) 6016 systems is an important part of sustaining acceptable indoor air 6017 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 157 quality (IAQ). Contaminants in HVAC systems can take many forms. Common 6018 contaminants include dust particles (viable and non-viable), active 6019 bacterial or fungal growth, debris from HVAC components (rust, belt 6020 shedding, grease), insulation, mold spores, and other items. For these 6021 reasons good housekeeping practices need to be followed. 6022 6023 Periodic walk downs of mechanical areas to evaluate state of 6024 housekeeping to ensure compliance is maintained at an acceptable level 6025 of quality. 6026 6027 6.3.2 Air Handling Units (AHU) 6028 6029 The unit, which is really a box filled with components to condition and 6030 transfer air should beperiodically inspected to identify air leakage, 6031 rusting, condensate drainage, dirt accumulation and for the proper 6032 operation of doors, dampers & actuators, lighting and switches. 6033 6034 Periodic cleaning of the unit‘s interior will be needed especially for 6035 units serving classified spaces and in particular aseptic operation. A 6036 cleanliness inspection should consider all components within the unit 6037 such as filters, heating and cooling coils, condensate pans, condensate 6038 drain lines, humidification systems, acoustic insulation, fans, fan 6039 compartments, dampers, door gaskets and general unit integrity. Though 6040 prefilters are installed, they are not intended to remove all air 6041 particulates. Dirt accumulation can lead to microbial growth. Typically 6042 the units are washed down with a solution that will kill 6043 microorganisms, while at the same time eliminating grease and oil, 6044 which may have been dispersed from bearing and other lubricated joints. 6045 6046 It is recommended to remove visible rust and repaint surfaces to return 6047 their appearance to new. 6048 6049 Pools of standing water in the condensate drain pans can lead to 6050 microbial growth and rusting. Check for proper drainage during hot and 6051 humid periods when condensate generation is high. 6052 6053 Lighting fixtures where the fluorescent tubes or ballasts have failed 6054 will result in poor lighting levels, which can negatively impact 6055 maintenance on the AHU components and for personnel safety. 6056 6057 Electrical switches and receptacles can lead to electrical hazards, 6058 poor or no operation of the components they are serving and increased 6059 maintenance. 6060 6061 Door maintenance is very important to the air tightness of the unit. 6062 From the constant use of the doors, the gaskets, frame, hinges and 6063 latching handles tend to loosen and get worn out. This can lead to 6064 lower air delivery by the unit, sweating and infiltration of dirt. 6065 6066 All the other components, which are needed to fulfill the role of the 6067 air-handling unit, are discussed below. 6068 6069 6.3.3 Fans 6070 6071 They generate airflow, whether for supply, return, or exhaust. 6072 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 158 Maintaining the desired airflow is critical to providing the 6073 conditioned supply air through the ductwork system and into the space. 6074 They also exhaust/extract air from spaces, fume hoods and bio-safety 6075 cabinets to expel unwanted air outside of the building. Additionally, 6076 return fans provide semi-conditioned air back to air handling units 6077 6078 Fans have several components, which if not properly maintained will 6079 lead to diminished airflow capacity and eventual failure. They include 6080 the fan housing, wheel, bearings, belts, guards and motor. 6081 6082 The wheel, which generates the airflow, needs to be checked 6083 periodically for accumulation of dirt, mechanical fatigue and 6084 imbalance. These will eventually result in increased vibration and 6085 noise and possible catastrophic failure and a life threatening 6086 condition. If present and not removed, the desired airflow volume may 6087 not be achieved. In addition, dirt accumulation on the fan impeller 6088 will become unbalanced, causing vibration and overloading of the shaft 6089 and motor bearings resulting in catastrophic failure (i.e. broken 6090 blades and housings). 6091 6092 Bearing failure is common due to over or under lubrication and the use 6093 of lubricants, which are not intended for the environment they 6094 encounter. Personnel need to have proper training and services provided 6095 from bearing manufacturers and lubrication vendors are recommended. 6096 Vibration and temperature monitoring can assist in trending analysis to 6097 identify impending bearing failure. 6098 6099 Belt drives need proper care especially as it relates to maintenance. 6100 There are extensive procedures for removing, installing and starting-up 6101 of equipment with belt drives. One item in particular, belt tension, is 6102 one of the most common root causes for premature failure. The following 6103 provides several important steps to follow: 6104 6105 Check belt tension, using a tension gauge or Sonic Tension Meter. 6106 Adjust the belt drive‘s center distance until the correct tension is 6107 measured. 6108 6109 Rotate the belt drive by hand for a few revolutions. Re-check the belt 6110 tension and adjust as necessary. 6111 6112 Start the drive, looking and listening for any unusual noise or 6113 vibration. If the motor or bearings are hot, the belt tension may be 6114 too high. 6115 6116 V-belt Run-In Procedure - A run-in procedure is recommended for all V-6117 belt drives so that the optimum belt life can be achieved. A run-in 6118 consists of starting the drive and letting it run under full load for 6119 up to 24 hours. After the belts have run-in, stop the belt drive and 6120 check the belt tension. Running the belts under full load for an 6121 extended period of time will seat the V-belts into the sheave grooves. 6122 V-belt tension will drop after the initial run-in and seating process. 6123 This is normal. Adjust the belt tension as necessary. Since tension in 6124 V-belts will drop after the initial run-in and seating process, failure 6125 to check and re-tension the belt will result in low belt tension, belt 6126 slippage and reduction of airflow. This slippage will result in 6127 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 159 premature belt failure. 6128 6129 Motors should be capable of operating for more than 10 years without 6130 major problems. Properly maintained. Since motors are expensive to 6131 purchase and their operating costs are high (e.g. 25hp motor x 8760 6132 hrs/yr. x $0.075/kwh = $12,250/yr.) maintenance is vital to keep these 6133 costs at a minimum and the following few steps should be followed: 6134 6135 External cleaning should be done periodically to remove any contaminant 6136 that would affect heat dissipation from the motor. Wipe, brush, vacuum 6137 or blow accumulated dirt from the frame and air passages of the motor. 6138 Dirty motors run hot when thick dirt insulates the frame and clogged 6139 passages reduce cooling airflow. Heat reduces insulation life and 6140 eventually causes motor failure. 6141 6142 Check for signs of corrosion. Serious corrosion may indicate internal 6143 deterioration and/or a need for external repainting. 6144 6145 Lubricate the bearings only when scheduled or if they are noisy or 6146 running hot. Do NOT over-lubricate. Excessive grease and oil creates 6147 dirt and can damage bearings. 6148 6149 Feel the motor frame and bearings for excessive heat or vibration. 6150 Listen for abnormal noise. All indicate a possible system failure. 6151 Promptly identify and eliminate the source of the heat, noise or 6152 vibration. 6153 6154 Belt and motor drive guards should be securely fastened so as not to 6155 cause vibration and noise and possible damage to equipment and person. 6156 6157 6.3.4 Fume Exhaust / Extraction Systems 6158 6159 Exhaust systems serving pharmaceutical operations need to have a high 6160 level of reliability due to the impact on the process should they fail. 6161 Maintenance must be performed more diligently to ensure equipment up 6162 time. 6163 6164 Inspect the system to ensure it is free of debris and dirt. If present 6165 and not removed, the desired airflow volume may not be achieved. 6166 6167 Control dampers shall operate freely 6168 6169 Check the flexible duct connections to make sure they are not leaking 6170 air dueto deterioration or wear. 6171 6172 Fans are the primary component to the operation of fume exhaust / 6173 extraction systems, refer to the Fan section for details. 6174 6175 6.3.5 Heating & Cooling Coils 6176 6177 Coils, whether for heating, cooling or dehumidifying all have one thing 6178 in common as it relates to their maintenance. They must be clean both 6179 internally and externally and the fins for heat transfer must be intact 6180 and undamaged. Since cooling coils typically have a dual function of 6181 reducing both the sensible (cooling) and latent (de-humidify) heat of 6182 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 160 the air, they are more sensitive to reduction in heat transfer than 6183 that of heating coils. Cooling coils have a greater affinity for the 6184 accumulation of dirt since they are typically wet. Typically coils, 6185 especially cooling coils are externally cleaned once a year since this 6186 is the side of the coil, which encounters the most accumulation of 6187 dirt. Internal cleaning is typically reserved when differential 6188 pressures (inlet vs. outlet) increase beyond what the manufacturer 6189 would recommend as acceptable for the particular operation. By 6190 maintaining good water treatment, the tubes of the coils should remain 6191 clean and the heat transfer capability should remain high for a number 6192 of years. When face and bypass heat coils are used, the mechanisms 6193 which control the divergence of air should be inspected annually to 6194 make sure they properly operate smoothly over their entire range of 6195 motion. 6196 6197 All coils use control valves to modulate the amount of heat transfer 6198 fluid, which ultimately controls the discharge air temperature. These 6199 valves wear out over time due to the constant modulation to control the 6200 supply quantity of fluid to provide the required discharge 6201 temperatures. These valves should be included in a regularly scheduled 6202 maintenance program. 6203 6204 6.3.6 Humidifiers 6205 6206 Humidifiers are necessary to increase air moisture contact in low 6207 humidity climates. Steam humidification using plant steam is the most 6208 common means of achieving proper levels to spaces. Though there are 6209 approximately 9 components that make up the humidifier system the 6210 following are those items that really need to be inspected and 6211 maintained. 6212 6213 Inspect the strainer screen at least twice per year. If fouled, steam 6214 capacity for humidification will be reduced. 6215 6216 Inspect the control valve annually to ensure that: (1) the valve closes 6217 off steam tight, (2) the stem packing is not leaking steam, and (3) the 6218 diaphragm in the actuator is not leaking air. 6219 6220 Inspect the sealing and O-rings, if they leak steam, otherwise they 6221 will disperse steam into the surrounding area with the possibility of 6222 personnel injury. 6223 6224 Inspect the dispersion nozzles for proper dispersion of steam into the 6225 airstream. If steam is not dispersing properly, capacity can be 6226 reduced. 6227 6228 Inspect the silencer at least annually for cleanliness. 6229 6230 6.3.7 Dehumidifiers 6231 6232 Dehumidification of the air supplied to spaces requiring lower humidity 6233 levels is achieved by either chilled water or by desiccants. The 6234 maintenance of chilled water coils is discussed in the ―Heating and 6235 Cooling Coils‖ section. The maintenance of desiccant units includes a 6236 number of components and includes filters, wheel drive assembly, the 6237 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 161 wheel support bearing, fan, fan belts and controls. Maintenance of fans 6238 and belts are discussed in the ―Fans‖ section. 6239 6240 Like any other mechanical equipment, desiccant components must be 6241 maintained according to a recommended schedule. 6242 6243 Since a desiccant system has incoming air on the supply side and a 6244 second air stream for reactivation, both sets of inlet filters need 6245 replacement. If filters are not changed, airflow will be reduced. 6246 Clogged filters on the supply or process air will cause thermal 6247 discomfort due to reduced airflows. Clogged filters on the reactivation 6248 side cause two problems. First, there is not enough air to remove the 6249 moisture from the desiccant wheel, so system performance is reduced. 6250 Then as filters load still further, there is not enough air to absorb 6251 the heat from the burners, so the unit shuts down because the 6252 temperature in reactivation is too high as the air enters the wheel. 6253 About 90% of reported problems related to desiccant systems can be 6254 traced to clogged filters. 6255 6256 The drive belt around the desiccant wheel must be tight enough to turn 6257 the wheel, but not so tight as to put an excessive load on the drive 6258 motor shaft bearings. Desiccant units are equipped with automatic 6259 tensioning devices, but belt tension should be checked at least twice a 6260 year, or when the filters are changed, to be certain the belt is 6261 neither too slack nor too tight. 6262 6263 In addition to bearings on the fan section of the unit the desiccant 6264 wheel also has bearings. They should be inspected at the same time that 6265 the fan bearings occur and should be greased based on the operation and 6266 the manufacturers recommendation. Typically greasing is only needed 6267 once a year due to their slow rotational speed. 6268 6269 Controls must have regular recalibration to make sure the system 6270 maintains a steady state of operation. 6271 6272 6.3.8 Air Filtration 6273 6274 As filters load with particles, resistance to airflow increases (i.e. 6275 differential pressure (DP)) to a point where if they are not replaced 6276 with new ones, airflow could be reduced and the filters might collapse. 6277 On the other hand, as filters load with material, their efficiency 6278 increases somewhat. Ideally, filters should be replaced based on a 6279 predetermined differential pressure and the cost of the filters. This 6280 optimizes on the total cost of ownership (TCO) for the replacement and 6281 energy costs of the filters. Higher energy costs typically require 6282 lower differential pressure set points for change outs. Filters should 6283 be properly installed, so as not to cause air bypassing which can lead 6284 to downstream dirt in the air stream, negating the main purpose of the 6285 filters. Filter manufacturers can provide the optimal scenario for 6286 achieve lowest total cost of ownership based on the operating 6287 conditions at the site. 6288 6289 6.3.8.1 ASHRAE type filters should be replaced within two years of 6290 service, even if pressure differential criteria limits have not yet 6291 been reached. This eliminates potential microbial growth and filter 6292 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 162 degradation. Filters should be inspected at a minimum of two times per 6293 year for integrity. 6294 6295 ASHRAE type filters (non-HEPA) are not to be repaired nor require leak 6296 testing. 6297 6298 6.3.8.2 HEPA filters are critical to various pharmaceutical operations. 6299 They are intended to almost totally remove all particles from air 6300 passing through them. They may be field tested for integrity against 6301 leaks. Leaks greater than or equal to 0.01% of the upstream aerosol 6302 concentration require that the filters be replaced or patched. Testing 6303 is normally performed once a year for most GMP operations, but aseptic 6304 manufacturing requires testing every six months for some areas (See the 6305 appropriate Baseline Guide).. 6306 6307Detection of HEPA filter leaks occurs in several ways. The filter 6308 media may be easily damaged by rough handling or touching with 6309 instruments or hands. Leaks may also occur along the boundary where the 6310 media is attached to the frame by a sealant. The adhesive material can 6311 sometime crack or separate its bonding from the frame. This usually 6312 occurs due to poor quality control manufacturing processes and using 6313 adhesives that are incompatible with materials in the air stream and 6314 application. Another other major leak source is at silicon gel seals 6315 where the filter housing meets the knife-edge of the filter grid 6316 system. Over time, the gel can deteriorate due to exposure to aerosols 6317 used in the testing of filters. (See 6.1.8). 6318 6319 When leaks are detected, the filter may be replaced or repaired. IEST 6320 has specific procedures that should be followed . Of utmost concern is 6321 the size and area of the patch over the leak. HEPA filters should be 6322 replaced when the patchable HEPA filter area is more than an 3% of the 6323 net face area of the filter as furnished from the factory, or when a 6324 single patch has a lesser linear dimension exceeding 1.5 inches 6325 (3.8 cm) (IEST-RP-CC034.2). Patching material should be RTV silicon 6326 sealant caulk, which meets the FDA 21CFR 177.2600 and USDA for food 6327 grade applications. (It is not recommended to attempt to use caulk to 6328 repair a leak between silicone gel and the filter frame knife-edge.) 6329 6330 Care must be provided when storing, handling installing and testing 6331 HEPA filters. They should be stored in an environmental controlled 6332 location within 40–100 ºF (4–38 ºC) and 25–75% relative humidity. 6333 Filters shall be stored in such a manner as to prevent damage or 6334 intrusion of foreign matter. 6335 6336 In handling operations, care should be taken to follow manufacturer‘s 6337 recommendations and prevent damage from: 6338 6339 Dropping of cartons 6340 Vibration 6341 Excessive movement 6342 Rough handling 6343 Improper storage or stack height 6344 6345 Prior to installation it is recommended that information on individual 6346 filters and filter housings be recorded (model number, serial number, 6347 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 163 performance, factory test data, etc.). This can resolve future 6348 questions as to filter efficiency, replacement filters or issues 6349 arising from a product recall. 6350 6351 6.3.9 Ductwork 6352 6353 Periodic inspections of HVAC ductwork can identify potential problems 6354 (dirt, debris, leaks and corrosion) which can be corrected before 6355 unexpected shut downs and extensive repairs are needed. Ductwork can 6356 loss its seal over time and can be a source of excessive leakage or 6357 entrainment that can affect room pressurization. Ductwork that has 6358 been crushed will lead to insufficient airflow, increased noise and 6359 poor control. Ductwork that has lost its insulation should be quickly 6360 replaced so as to not cause sweating, with the potential of 6361 condensation getting into work areas, rusting and mold growth. 6362 6363 6.3.10 Dampers & Louvers 6364 6365 These need to be checked for dirt accumulation and free movement 6366 without binding of the linkages over the full range of operation (full 6367 open to close). Linkages should not be loose. Dampers for low leakage 6368 applications, which typically have gaskets, will need to be replaced if 6369 they have become hardened or do not provide a good seal. If these units 6370 are allowed to accumulate dirt or don‘t operate properly will result in 6371 insufficient air distribution. 6372 6373 6.3.11 Diffusers And Registers 6374 6375 These need to be checked for dirt accumulation and free movement 6376 without binding of the linkages over the full range of operation (full 6377 open to close). Linkages should not be loose. If these units are 6378 allowed to accumulate dirt or don‘t operate properly will result in 6379 insufficient air distribution. 6380 6381 6.3.12 Ultraviolet (UV) Lights 6382 6383 The only significant maintenance required for ultra-violet lighting 6384 used as a germicide is the replacement of the UV lamp or bulb. The 6385 bulbs typically last about 8,000 hours. Their life will be shortened 6386 when dirt has accumulated on them. Dirt acts as a barrier for the lamp 6387 to emit sufficient intensity to effectively destroy microbes. UV 6388 lighting using ballasts will have a long life of typically more than 5 6389 years. 6390 6391 6.3.13 Building 6392 6393 As buildings age, the architectural (ceiling, walls, doors, ceiling 6394 fixtures), mechanical and electrical (piping, ductwork, conduit, 6395 receptacles) components, which penetrate the conditioned perimeter, 6396 tend to lose their airtight seals. This can lead to nuisance problems 6397 of identifying the sources. This can result in not achieving room 6398 pressurization and undesirable air flows into or out of spaces. When 6399 this occurs, room pressurization cascades are affected and can drift, 6400 requiring adjustments to maintain compliance. 6401 6402 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 164 6.3.14 Air Balancing 6403 6404 Testing, Adjusting and Balancing (TAB) for HVAC systems should be 6405 performed within a specific frequency to ensure sufficient current 6406 documentation is available for regulatory agencies to demonstrate 6407 system compliance as well as verify general operation of other less 6408 critical systems are operating as energy efficient as possible. When 6409 changes to the space or HVAC equipment occurs, TAB shall occur at that 6410 time. At a minimum recalibration of instruments, air changes per hour 6411 (ACPH) and differential pressure (DP) shall occur at least annually for 6412 GMP spaces and full rebalancing should be evaluated to be performed at 6413 least every 5 years and 7 years for non-GMP spaces. A total rebalancing 6414 can uncover unsuspected increases in energy consumption and potential 6415 equipment failures. 6416 6417 Room Type Frequency Aseptic Operation (Grades 5-7) - Re-calibration of Instruments, ACPH & differential pressure; test HEPA filters 6 month GMP Classified Operation (Grade 8) - Re-calibration of Instruments, ACPH & differential pressure, test HEPA filters 1 year All GMP Spaces, Pilot Plants, Animal Facilities, Laboratory Space, R&D Space - full rebalancing 5 years Non-GMP Spaces including electrical & mechanical rooms, auditoriums, utility spaces, central plant ventilation, kitchens and offices - full rebalancing 7 years 6418 Table 6-4 Suggested maintenance frequency 6419 6420 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 165 7 VERIFICATION AND TESTING 6421 6422 7.1 INTRODUCTION 6423 6424 A new alternative methodology will be proposed for preparing regulated 6425 facilities for their intended use in the ISPE Baseline Guide for 6426 Installation and Verification, in draft form as of this writing This 6427 guide covers a parallel scope to the Commissioning & Qualification 6428 Baseline guide and introduces new terms, concepts, and process 6429 improvements. It is designed to increase the value of critical 6430 activities and remove wasteful activities that do not contribute to 6431 ensuring product quality or patient safety. This Baseline Guide follows 6432 the principles of ASTM Standard E2500-2007. 6433 6434 Although the premise of this HVAC guide is to provide the "how" of 6435 implementing those HVAC requirements and concepts found in the baseline 6436 guides, this chapter is groundbreaking in that this proposed 6437methodology has not yet been put into practice by the industry at 6438 large. The challenge in providing guidance on how to implement the 6439 recommendations of the proposed Baseline guide is that there are 6440 limited practical applications or experience to draw from. But since 6441 the timing of this guide should coincide with the release of the new 6442 Baseline guide, the authoring team felt it would benefit the industry 6443 to try to define the "how", using HVAC systems to as examples to 6444 deliver clear and consistent guidance. As with any first attempt, 6445 there is always room for improvement, but the interpretations provided 6446 in this guide may be used as a template for other systems and 6447 equipment. 6448 6449 Key concepts and terminology proposed for the Installation and 6450 Verification Guide are used extensively in this guide. The Baseline 6451 Guide will provide more depth regarding these concepts and terms. 6452 6453 7.2 PHILOSOPHY 6454 6455 The commissioning and qualification philosophy used to date 6456 incorporates Good Engineering Practices (GEP) and Impact Assessment. 6457 Systems and components that were designated as Direct Impact were 6458 subject to qualification, in addition to commissioning. The difficulty 6459 encountered in this process is that some companies found it difficult 6460 to leverage commissioning activities and documentation into 6461 qualification, so they re-commissioned a system to gather qualification 6462 documents. Some of the compliance-related activities included general 6463 engineering-focused activities that added little or no compliance value 6464 (such as qualifying fan speeds or prefilters). 6465 6466 The new methodology is based on: 6467 6468 Thorough understanding of the product and process and the role of 6469 science 6470 Use of risk assessments (instead of impact assessments) to determine 6471 the scope and extent of required verification in the overall Risk 6472 Management Process, which is related to patient safety 6473 Notion of Design Space 6474 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 166 Focusing on practices that lead to achieving fitness for purpose. 6475 6476 7.3 PRINCIPLES 6477 6478 Key principles that provide the basis for developing engineering 6479 requirements are: 6480 6481 The assessment and designation of criticality should be primarily 6482 based on impact on the safety and efficacy of the drug product to 6483 the patient 6484 6485 Critical Quality Attributes (CQAs) should drive the focus of the 6486 risk assessment along with Critical Process Parameters (CPPs) 6487 6488 Risk assessment shall be performed in the "design space", the 6489 intersection of CQAs and CPPs, and is subject to regulatory 6490 assessment and approval. 6491 6492 The Installation and Verification process shall have value added 6493 activities and shall remove those activities that are wasteful and 6494 non-value adding. 6495 6496 Verification practices performed solely for regulatory compliance 6497 should be avoided. 2 6498 6499 7.3.1 Good Engineering Practice 6500 6501 Good Engineering Practice (GEP) is the practice under which all 6502 engineering activities and documentation are created. It applies to all 6503 facilities, not just pharmaceutical facilities. GEP encompasses the 6504 following: 6505 6506 Design and installation that takes full account of cGMP, safety, 6507 health, environmental, ergonomic, operational, maintenance, 6508 recognized industry guidance, and statutory requirements. 6509 6510 Professional and competent project management, engineering design, 6511 procurement, construction, installation and commissioning 6512 demonstrating functionality per design specifications. 6513 6514 Appropriate documentation, including design concepts, design 6515 schematic drawings, as-installed drawings, test records, maintenance 6516 and operations manuals, statutory inspection certificates, etc. 6517 6518 Well planned commissioning activities and documentation following sound 6519 Engineering Principles and Good Engineering Practices make a 6520 significant contribution in preparing for and achieving first time 6521 success to meet installation and verification requirements. 6522 6523 2 If a practice adds to the assurance that the equipment or system will work as intended then that practice should be performed whether or not the system is part of GMP manufacturing operations. If it does not, then that practice should not be performed unless specifically required for compliance. ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 167 7.3.2 GMP 6524 6525 Sustainability and Commissioning/Verification 6526 6527 TEXT NEEDED 6528 6529 7.4 REGULATORY EXPECTATIONS 6530 6531 TEXT NEEDED 6532 6533 US – This approach is recognized by the FDA as ONE method of verifying 6534 fitness of the HVAC system for production. Activities in this approach 6535 follow the principles in ASTM E2500. 6536 6537 EU – unknown at this time whether EU regulators will accept less 6538 voluminous Qualification packages. 6539 6540 Other - ? 6541 6542 Regulatory expectations are covered by the appropriate ISPE Facility 6543 Baseline Guide. As these expectations sometimes change, this guide 6544 defers to the Baseline Guides. 6545 6546 7.5 KEY CONCEPTS OF VERIFICATION 6547 6548 The verification process for HVAC Systems is a subset of the 6549 verification process for the manufacturing system. These key concepts 6550 have been driven by the FDA Initiative Pharmaceutical cGMP‘s for the 6551 21s Century – A Risk Based Approach, and by ICH Q9 Quality Risk 6552 Management. The overall direction is a shift toward the safety of the 6553 patient using a risk and science-based approach to the specification, 6554 design and verification of the manufacturing system. This Section 6555 addresses the application of the key concepts described in ASTM E2500-6556 07 to the installation and verification of HVAC Systems. 6557 6558 The goal of this approach is to improve patient safety while 6559 controlling costs and reducing non-value adding effort. 6560 6561 It should be noted that these Key Concepts focus on patient safety and 6562 product quality (GMP). The verification of the specification and 6563 design as it impact worker safety, health, environmental and other non-6564 GMP concerns should also be considered. 6565 6566 7.5.1 Risk-based and Science-based Approach 6567 6568 The level of risk to product quality should be based on scientific 6569 knowledge that leads to protection of the patient. The level of effort 6570 expended in the quality risk management process should reflect the 6571 level of risk. Product and process information related to product 6572 quality and patient safety should be the basis of the science- and 6573 risk-based decision to insure that manufacturing systems are designed 6574 and verified to be fit for their intended use. 6575 6576 Considerations include Critical Quality Attributes (CQAs), Critical 6577 Process Parameters (CPPs), process control strategy and prior 6578 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 168 production experience. 6579 6580 For HVAC Systems, the risks of system failures and interruptions need 6581 to be addressed during the specification and design part of the 6582 process. 6583 6584 7.5.2 Critical Aspects of Manufacturing Systems 6585 6586 Critical Aspects of Manufacturing Systems are typically functions, 6587 features, abilities, and performance characteristics necessary for the 6588 manufacturing process and systems to ensureconsistent product quality 6589 and patient safety.‖ HVAC systems may affect the manufacturing system 6590 and the critical aspects. Verification activities should focus on the 6591 critical aspects of the Manufacturing system and HVAC subsystem‘s 6592 effect. 6593 6594 7.5.3 Quality by Design 6595 6596 Quality by design concepts should be applied to the manufacturing 6597 system through the life cycle. Quality should not be a verification 6598 only phase activity. 6599 6600 7.5.4 Good Engineering Practice 6601 6602 Good Engineering Practice a set of established engineering methods and 6603 standards that are applied throughout the life cycle to deliver 6604 appropriate and effective solutions. For HVAC systems GMP 6605 requirements, code requirements including sustainability requirements 6606 and energy efficiency, safety, health environmental, ergonomic 6607 operational, and maintenance must be address. Preceding chapters 6608 discuss how to implement Good Engineering Practice for HVAC systems. 6609 6610 7.5.5 Subject Matter Experts 6611 6612 Subject Matter Experts have specific expertise and responsibility in a 6613 particular area or field . For HVAC Systems this could include the 6614 HVAC Engineer, quality unit, automation, or operations. 6615 6616 7.5.6 Use of Vendor Documentation 6617 6618 Vendor documentation may be used in the verification process if it is 6619 produced by a vendor with an acceptable quality system. A risk and 6620 science based approach can be used to determine if the vendor‘s 6621 practices are aligned with the risks possible with the selected 6622 equipment or system. 6623 6624 7.5.7 Continuous Improvement 6625 6626 Continuous improvement can happen as information is gained from 6627 operations. Improvements can be based on periodic reviews and 6628 evaluation, operational data and root-cause analysis of failures. For 6629 HVAC systems energy optimization is typically reviewed. Such 6630 improvement should be encouraged, although current Change Management 6631 programs often discourage change for any reason. 6632 6633 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 169 7.6 DESIGN, SPECIFICATION, VERIFICATION, AND ACCEPTANCE 6634 PROCESS 6635 6636 This section addresses the verification process for HVAC systems as 6637 they relate to the overall specification, design and verification 6638 process for the manufacturing system as well as HVAC subsystem. For a 6639 more detail description of the design process see Chapters 2 to 6 of 6640 this guide 6641 6642 7.6.1 Requirements Definition 6643 6644 Product Knowledge, Process Knowledge, Regulatory Requirements and 6645 Company Quality requirements all must be considered when determining 6646 the requirements for the manufacturing systems and HVAC system. The 6647 requirements definition is driven by patient safety. See chapter 3 for 6648 more detail. 6649 6650 7.6.2 Specification and Design 6651 6652 For HVAC Systems, the design process follows the process defined in 6653 Chapter 3 of this GPG. 6654 6655 7.6.3 Verification 6656 6657 Verification is a term that can be used interchangeably with 6658 commissioning. The HVAC industry references ASHRAE Guidelines 0 and 6659 1 as one of the primary references for HVAC commissioning. A 6660 Commissioning Plan or Verification Plan for Facility and Utility 6661 Systems will include the HVAC system and controls. 6662 6663 The HVAC engineer's role in verification will be different from in the 6664 impact assessment process. Under the ISPE Commissioning & 6665 Qualification Baseline Guide, systems were determined to be either 6666 direct impact or indirect impact. The HVAC engineer was part of a team 6667 that supported, developed, and executed commissioning and qualification 6668 protocols, as appropriate, for direct and indirect systems and the 6669 critical devices in the direct impact systems. Most notably, 6670 qualification documentation consisted of IQ, OQ, and PQ protocols. 6671 HVAC engineers attempted to bridge the gap between commissioning and 6672 qualification for direct impact systems by leveraging documents and 6673 procedures to streamline the process and reduce redundant testing and 6674 non-value added activities. 6675 6676 However, C&Q Baseline Guide procedures and policies may limit the 6677 amount of flexibility a firm can take to improve its qualification 6678 processes. A significant change in principles and philosophy may be 6679 required which, for many firms, must be balanced against the cost of 6680 making such a change. 6681 6682 Today, the Verification process takes the approach of a 6683 multidisciplinary team focused on product and patient safety. Team 6684 members include process, product, and subject matter experts who ask 6685 not if this is a direct or indirect impact system, but rather what are 6686 the elements of this system that are critical to product quality and 6687 patient safety, and how can we manage those risks appropriately to 6688 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 170 maintain or improve our overall product quality? 6689 6690 The interdisciplinary expert team forms the foundation for developing a 6691 risk management plan. Team members decide on methodologies to 6692 determine acceptable levels of risk and appropriate tools to evaluate 6693 risk (e.g. FMEA) after identifying the User Requirements. User 6694 Requirements should identify the Critical Process Parameters (CPP), 6695 Critical Quality Attributes (CQA) and other critical aspects related to 6696 product quality and patient safety. 6697 6698 Once the critical aspects (CPP, CQA, etc.) have been identified by the 6699 interdisciplinary team and documented, the quality unit then approves 6700 this document as the basis for the Verification Plan that will be 6701 developed. Furthermore, engineers need to know what type of tests the 6702 quality unit will expect to be performed after the verification process 6703 is complete in order to prepare systems to pass these tests. 6704 6705 Verification, similar to ―commissioning and qualification (for direct 6706 impact systems)‖, is one process that covers the activities, testing, 6707 and documentation required to evaluate systems, equipment, and 6708 environments and confirm they are fit for their intended use. It is 6709 based on good engineering practices coupled with the risk management 6710 plan developed in the risk assessment phase. The types of checks and 6711 tests to be performed are developed by the Subject Matter Expert (SME). 6712 For example, the HVAC SME would design a verification plan that would 6713 verify the acceptance criteria that meets the critical aspects (CQA, 6714 CPP …) within the framework of the risk management plan. 6715 6716 For an overview of the verification process, refer to figure 7.1: 6717 6718 7.6.4 Commissioning & Qualification process – SEE APPENDIX 6719 6720 7.6.5 Acceptance and Release 6721 6722 The acceptance and release phase confirms that the manufacturing system 6723 and support HVAC system are fit for their intended use. This is the 6724 last check before initial operation. 6725 6726 7.7 SUPPORTING PROCESSES 6727 6728 The activities described here can be part of the Specification, Design 6729 and Verification (SDV) Process. They occur throughout the SDV process. 6730 6731 7.7.1 Quality Risk Management (QRM) 6732 6733 Quality Risk Management is the high level concept that is applied to 6734 all systems including HVAC. QRM will define the risk assessment 6735 process for the manufacturer. The Risk Assessment for the HVAC system 6736 should be addressed in the overall RiskAssessment activity.. 6737 6738 7.7.2 Design Review 6739 6740 Design reviews are planned systematic reviews of specifications, 6741 design, design development and continuous improvement changes performed 6742 throughout the life cycle of the manufacturing system. For HVAC 6743 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 171 systems in the design phase, reviews typically occur at the basis of 6744 design (BOD), schematic design, design development and construction 6745 document phases. HVAC equipment specifications are often not available 6746 until the construction document phase and their review is critical to 6747 system quality. 6748 6749 7.7.3 Change Management 6750 6751 Change Management should be implemented on changes that affect critical 6752 aspects of the manufacturing system, both before and after acceptance. 6753 After acceptance, changes that affect GMP critical parameters need to 6754 be approved by the Quality unit prior to implementation. With 6755 continuous improvement as a goal of the FDA initiative, it is expected 6756 that systems that have been verified and accepted for intended use will 6757 be modified to achieve improved patient safety or reduce operating 6758 costs as opportunities arise during the manufacturing system‘s life 6759 cycle. 6760 6761 6762 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 172 8 DOCUMENTATION REQUIREMENTS 6763 6764 8.1 INTRODUCTION 6765 6766 Once an HVAC system has been qualified, one must ask ―what is the 6767 proper disposition of the HVAC system documentation?‖ Many will go to 6768 maintenance and operations, but others may be required for CMC filings 6769 and will become ―Critical Master Documents‖ - engineering documents 6770 maintained as GMP records. 6771 6772 This section discusses documents typically required for these purposes 6773 and gives some warnings regarding improper classification and use of 6774 documents. 6775 6776 8.2 ENGINEERING DOCUMENT LIFECYCLE 6777 6778 8.2.1 Planning Lifecycle 6779 6780 It is wise to define the lifecycle of all documents to be created on a 6781 project early in conceptual design, but no later than during BOD 6782 (Basis of Design) development. This advance planning eliminates 6783 ambiguity and prevents loss of data. 6784 6785 The planning document should define which documents are required only 6786 for construction, which will be part of an Engineering Turnover Package 6787 (ETOP) for maintenance / operations, which will be leveraged into 6788 verifications (or qualifications) and which will be maintained as 6789 record documents for Maintenance and GMP use. 6790 6791 Defining the contents of the ETOP early in a project also allows the 6792 easy capture of design calculations and risk assessments as they are 6793 generated. The best practice for capture of design and construction 6794 information into an ETOP is to utilize Document Management / 6795 Collaboration software which will apply the appropriate lifecycle to 6796 documents as they are generated and approved. 6797 6798 A good method for the planning and updating of document lifecycle is 6799 the ―Traceability Matrix‖ (a documentation of the plan and progress of 6800 documentation and concepts through the design, construction, 6801 verification and process validation sequence). The traceability matrix 6802 not only shows this progress, it also serves to maintain the chain of 6803 design intent, linking final documents all the way back to conceptual 6804 design documents. 6805 6806 8.2.2 Typical Steps in the Document Lifecycle 6807 6808 HVAC documents typically start their lifecycle as conceptual Airflow 6809 and Instrument Diagrams (AF&ID), room/zoning layouts, room condition 6810 tables (T, RH, area class, DP, etc), load calculations and design 6811 basis/assumption tables. These documents progress through the 6812 Engineering Process to Plan Drawings, Detail Drawings, Specifications, 6813 Calculations and Tables. 6814 6815 Plans, details and diagrams should be updated throughout (or after) the 6816 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 173 construction process to an ―As-built‖ state (corrected after 6817 construction to match the final configuration). The update to As-built 6818 is essential to maintenance, and especially important for systems that 6819 control critical environments. Specifications and calculations are 6820 usually augmented (or replaced) by manufacturer‘s submittals, details 6821 and calculations. 6822 6823 Some documents should be converted into ―Master Documents‖ (engineering 6824 documents with construction notes removed) to allow the capture of 6825 future construction changes as a record of the ―As-is‖ state of systems 6826 and equipment. Those Master Documents which define the critical 6827 attributes of the HVAC system should be maintained as ―Critical Master 6828 Documents‖ (Master‘s which are maintained in a constant state of 6829 inspection readiness). At the very least, the initial AF&ID, HVAC 6830 zoning layouts, and area classifications should be kept up to date. 6831 6832 8.3 DOCUMENTS FOR MAINTENANCE AND OPERATIONS (NON-GMP) 6833 6834 There may be a temptation to turn over all design and construction 6835 documents to maintenance at the end of a project. However, this is 6836 generally counter-productive. A well constructed (and less voluminous) 6837 ETOP can save hundreds of hours during troubleshooting or when entering 6838 data in a CMMS (Computerized Maintenance Management System). 6839 6840 Typical Documents for an HVAC ETOP: 6841 6842 URS / FRS / FDS (User Requirements Spec, Functional Requirements, 6843 Functional Design) 6844 Room Condition Tables 6845 Equipment Submittals 6846 Ductwork Shop Drawings 6847 Coordination Drawings 6848 As-built Ductwork, Piping and Equipment Plans 6849 As-built Airflow and Instrument Diagram 6850 Area Classification Diagrams 6851 Pressure or Airflow Direction ―Maps‖ 6852 AHU Zoning Diagrams 6853 Control Diagrams 6854 Commissioning Documents 6855 Filter Integrity Testing 6856 Air Balance 6857 Face Velocity Testing 6858 Alarm Testing 6859 Pressure Relationships 6860 6861 8.4 MASTER/RECORD DOCUMENTS 6862 6863 Documents that are typically kept updated to become HVAC Master 6864 Documents (for maintenance and facility engineering) are: 6865 6866 As-built Airflow and Instrument Diagram * 6867 As-built Ductwork, Piping and Equipment Plans 6868 ISPE GOOD PRACTICE GUIDE HVAC DRAFT FOR REVIEW JULY 2008 174 Area Classification Diagrams 6869 Pressure or Airflow Direction ―Maps‖ 6870 AHU Zoning Diagrams 6871 Control Diagrams 6872 6873 8.5 GMP HVAC DOCUMENTS 6874 6875 It is important to align with the risk assessment performed in the 6876 design process to determine the HVAC documents which will be leveraged 6877 into Verification or that will need to become Critical Master 6878 Documents. Since the risk assessment will vary by project the following 6879 lists of typical documents must be reviewed against project/product 6880 needs. 6881 6882 8.5.1 Verification Documents 6883 6884 Documents that are typically leveraged into Verification are: 6885 6886 As-built Airflow and Instrument Diagrams 6887 Room Environmental Conditions Tables 6888 Area Classification Diagrams 6889 Pressure or Airflow Direction ―Maps‖ 6890 AHU Zoning Diagrams 6891 Control Diagrams and/or FRS for Direct Impact Systems 6892 Critical Instrument Specifications 6893 Commissioning Documents: 6894 6895 Filter Integrity Testing 6896 Air Balance 6897 Face Velocity Testing 6898 Pressure