Logo Passei Direto
Material
Study with thousands of resources!

Text Material Preview

1 / 3
Pass DELL EMC D-PSC-MN-23 Exam with Real Questions
DELL EMC D-PSC-MN-23 Exam
Dell PowerScale Maintenance 2023 Exam
https://www.passquestion.com/D-PSC-MN-23.html
35% OFF on All, Including D-PSC-MN-23 Questions and Answers
Pass DELL EMC D-PSC-MN-23 Exam with PassQuestion
D-PSC-MN-23 questions and answers in the first attempt.
https://www.passquestion.com/
https://www.passquestion.com/
2 / 3
1.In the context of PowerScale, what is the primary function of the PAPI tool?
A. To provide physical console access
B. To enable programmatic cluster management
C. To facilitate network configuration
D. To assist in hardware diagnostics
Answer: B
2.In a Dell PowerScale Gen 6 cluster, which nodes work as a pair?
A. Nodes in slots 1 and 2
B. Nodes in slots 2 and 4
C. Nodes in slots 1 and 3
D. Nodes in slots 2 and 3
Answer: A
3.How does the Serial Console differ from the WebUI in managing PowerScale clusters?
A. It provides a text-based interface.
B. It requires physical access to the node.
C. It offers a more detailed system view.
D. Both A and B
Answer: D
4.What is a recommended practice when maintaining CRUs in a PowerScale node?
A. Regularly rotating CRUs between nodes to ensure even wear
B. Keeping a log of all CRU maintenance activities
C. Testing CRUs in a separate environment before installation
D. Using only proprietary tools for CRU installation and removal
Answer: B
5.What is the first step in planning the installation of a PowerScale cluster?
A. Determining the optimal operating system version
B. Calculating the total power consumption
C. Designing the network topology
D. Assessing the physical environment for suitability
Answer: D
6.How do you ensure data continuity during a PowerScale node hardware upgrade?
A. Implement rolling upgrades across the cluster
B. Synchronize all nodes before starting the upgrade
C. Use data mirroring to an external backup cluster
D. Isolate the node being upgraded from the network
Answer: A
7.What considerations should be made when applying upgrades or patches to a PowerScale cluster?
A. Ensuring compatibility with existing applications
3 / 3
B. Backing up configuration and data
C. Verifying the integrity of the upgrade package
D. All of the above
Answer: D
8.Which service procedure can be performed on a Dell PowerScale Gen 6 node without first having to
power it down?
A. Reseat network cable
B. Replace CRU component
C. Reseat Gen 6 node
D. Replace FRU component
Answer: B
9.What preparatory action is necessary to facilitate effective troubleshooting during and after PowerScale
rack installation?
A. Creating a detailed network diagram
B. Setting up a temporary command center near the rack
C. Ensuring all tools and spare components are available on-site
D. Photographing each phase of the installation for reference
Answer: D
10.A federal customer wants to fully restrict the ability to access and modify data on a new Dell
PowerScale cluster.
How should the cluster be deployed?
A. Compliance mode; not connected to SRS gateway
B. Compliance mode; connected to SRS gateway
C. Enterprise mode; not connected to SRS gateway
D. Enterprise mode; connected to SRS gateway
Answer: A
11.A platform engineer is installing a fully populated Dell PowerScale Gen 6 chassis in a customer rack.
However, the equipment lift is broken.
What is the appropriate course of action to take before attempting to lift the chassis?
A. Remove the power supplies and hard drives, then rack the chassis.
B. Remove the power supplies and drive sleds while waiting for the lift to be repaired.
C. Stop work until the lift is repaired and fully functional.
D. Remove and label the drive sleds and compute modules, then rack the chassis with assistance.
Answer: D
	Pass DELL EMC D-PSC-MN-23 Exam with Real Questions
	DELL EMC D-PSC-MN-23 Exam
	Dell PowerScale Maintenance 2023 Exam
	https://www.passquestion.com/D-PSC-MN-23.html 
	Pass DELL EMC D-PSC-MN-23 Exam with PassQuestion D
	https