Which two steps are required for this migration and cutover? (Choose two.) A.Add NetApp WWN initiator ports to the existing zones. B.Add NetApp WW...

Which two steps are required for this migration and cutover? (Choose two.)

A.Add NetApp WWN initiator ports to the existing zones.
B.Add NetApp WWN target ports to the existing zones so that your hosts can access both storage arrays.
C.Create two zones that contain the NetApp target ports and the host initiators ports, one for each fabric.
D.Create two zones that contain NetApp initiator ports and the source storage target ports, one for each fabric.
a) A and B
b) A and C
c) B and D
d) C and D

Essa pergunta também está no material:

NS0-520 NetApp Certified Implementation Engineer - SAN, ONTAP Questions
16 pág.

💡 1 Resposta

User badge image

Ed Verified user icon

As a resposta correta é a alternativa "a) A and B". As duas etapas necessárias para essa migração e cutover são: adicionar as portas iniciadoras NetApp WWN às zonas existentes e adicionar as portas de destino NetApp WWN às zonas existentes para que seus hosts possam acessar ambas as matrizes de armazenamento.

0
Dislike0

✏️ Responder

SetasNegritoItálicoSublinhadoTachadoCitaçãoCódigoLista numeradaLista com marcadoresSubscritoSobrescritoDiminuir recuoAumentar recuoCor da fonteCor de fundoAlinhamentoLimparInserir linkImagemFórmula

Para escrever sua resposta aqui, entre ou crie uma conta

User badge image

Outros materiais