Buscar

How can the administrator add a four month retention to a backup schedule? A. modify an existing retention level in the master server host propert...

How can the administrator add a four month retention to a backup schedule?

A. modify an existing retention level in the master server host properties, under Retention Periods
B. ignore the selection list and type in the desired retention period directly
C. add a new retention period in the media server host properties, under Retention Periods
D. increase the Image cleanup interval in the master server host properties, under Clean-up
A
B
C
D

Essa pergunta também está no material:

Veritas NetBackup 10 x and NetBackup Appliance 5 x Administrator VCS-285 Dumps
9 pág.

💡 1 Resposta

User badge image

Ed Verified user icon

To add a four-month retention to a backup schedule, the administrator can modify an existing retention level in the master server host properties, under Retention Periods. This can be done by selecting the appropriate retention level and adjusting the duration to four months. Option A is the correct answer in this case.

0
Dislike0

Faça como milhares de estudantes: teste grátis o Passei Direto

Esse e outros conteúdos desbloqueados

16 milhões de materiais de várias disciplinas

Impressão de materiais

Agora você pode testar o

Passei Direto grátis

Você também pode ser Premium ajudando estudantes

✏️ Responder

SetasNegritoItálicoSublinhadoTachadoCitaçãoCódigoLista numeradaLista com marcadoresSubscritoSobrescritoDiminuir recuoAumentar recuoCor da fonteCor de fundoAlinhamentoLimparInserir linkImagemFórmula

Para escrever sua resposta aqui, entre ou crie uma conta

User badge image

Outros materiais

Outros materiais