Essa pergunta também está no material:
Respostas
The correct sequence of steps for installing carpentry in Durlock® walls is: b) Complete the wall structure, install the metal frames, cut and fix the plates, and reinforce the structure if necessary. This option ensures that the wall structure is completed first, followed by the installation of metal frames, cutting and fixing the plates, and reinforcing the structure if needed.