Therefore, what is the viable alternative for the productive line balancing of Bibi Candy (BC)?
a) The proposal for line balancing with stage div...
Therefore, what is the viable alternative for the productive line balancing of Bibi Candy (BC)?
a) The proposal for line balancing with stage division (vertical layout). b) The proposal for line balancing with stage division (horizontal layout). c) The complete precedence diagram (vertical layout). d) The simplified precedence diagram (horizontal layout).
A alternativa viável para o balanceamento da linha produtiva da Bibi Candy (BC) é a proposta de balanceamento de linha com divisão de estágios (layout vertical), opção A.