Prévia do material em texto
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, VOL. 69, NO. 6, DECEMBER 2022 2897 Developing a Hybrid Approach for Lean Six Sigma Project Management: A Case Application in the Reamer Manufacturing Industry Srijit Krishnan , K. Mathiyazhagan , and V Raja Sreedharan Abstract—Lean six sigma (LSS) is a well-structured process improvement methodology aimed at removing wastes and defects to increase the operational efficiency of a process. In this article, the authors were tasked to identify the root causes of the reworks and rejections occurring in the polycrystalline diamond (PCD) reamer line of a tool manufacturing industry and provide solutions and implement methods to overcome the rejections. Therefore, the author constructed a hybrid approach comprising the select, define, measure, map, analyse, improve, control, sustain (SDMMAICS) model to enhance the define, measure, analyse, improve, control (DMAIC) approach. Further, decision-making trial and evaluation laboratory (DEMATEL) was incorporated in the improve phase of the LSS model to ensure effective decision making. The model is backed by a KAIZEN framework to ensure the sustenance of the improvements implemented. This hybrid LSS framework was successfully applied and resulted in an increased sigma level from 3.3 to 4.3, improving the cycle time of PCD reamer production by 12%. The hybrid SDMMAICS-DEMATEL approach used is easy to follow and can be adopted in any LSS project. Moreover, the relevance of the model in a part manufacturing setup has been effectively tested and will serve as a reference for researchers in process improvement studies. Index Terms—Decision-making trial and evaluation laboratory (DEMATEL), KAIZEN, lean, PDCA, poka-yoke, process capability, quality improvement, reamer, SDMMAICS, six sigma, sustainability. I. INTRODUCTION THE Indian manufacturing sector has emerged as one of the most developed sectors in India. With the push from the “Make in India” initiative by the Indian Government, it is expected that India would be placed in the world map as a hub for manufacturing. This sector is widening its domain across economic sectors by producing a diverse range of products to meet domestic and global markets. This sector alone would cre- ate 100 million jobs by 2022, create value in the domestic supply Manuscript received 31 May 2020; revised 20 July 2020; accepted 28 July 2020. Date of publication 23 September 2020; date of current version 1 Novem- ber 2022. Review of this manuscript was arranged by Department Editor E. Kongar. (Corresponding author: K. Mathiyazhagan.) Srijit Krishnan and K. Mathiyazhagan are with the Department of Me- chanical Engineering, Amity School of Engineering & Technology, Amity University, Noida 201313, India (e-mail: srijitkrishnan@outlook.com; kmathiyazhagan@amity.edu). V Raja Sreedharan is with the Department of Supply chain Management, Ra- bat Business School, Université Internationale de Rabat, Rabat 11100, Morocco (e-mail: raja.sreedharan@uir.ac.ma). Color versions of one or more figures in this article are available at https://doi.org/10.1109/TEM.2020.3013695. Digital Object Identifier 10.1109/TEM.2020.3013695 chain and contribute significantly to the gross domestic product [18]. Most manufacturers in India fall under the micro, small, and medium enterprises category (MSMEs). PIB Delhi [32] reported that 31% of (MSMEs) in India is engaged in manufacturing activities. The machine tool industry of India has a good position in the world market. There are more than 1000 machine tool industrial units in the production of machines tools, attachments, subsystems, and parts. India stands 12th in the production of machine tools and 8th in its consumption. There is a need for adding capacities in this sector given the current gap between supply and demand [12]. The Indian tool manufacturing sector has several opportunities for expansion driven by demand from key consumers such as automobiles, aerospace, etc. Therefore, developing capabilities and increased investments in this sector would cater to increasing demands, and yield long-time benefits. These efforts may be implemented through quality improvement and quality management (QM) programs. For Indian manufac- turers to position themselves for sustenance in the competitive environment, tool manufacturers need to focus on their efforts toward improving the quality of their processes, products, and services. To deal with declining profit margins, these companies are increasingly required to improve productivity, inventory management, waste reduction, and value creation of their supply chains [34]. With various schemes and policies support by the Indian Government, several of these companies have begun focusing on building their global competitive advantage through quality improvement initiatives. Nevertheless, these efforts are in their infancy stage in both academic research and practical application. The push to be globally competitive requires QM strategies with visible returns and keeping with customer satis- faction [54]. This article significantly contributes by providing a model-based on Lean six sigma (LSS) for quality improvement project in an Indian tool manufacturing company. Every industry is striving to dominate and take a leading posi- tion in its target market. For this, firms aim for higher sales highly impacted by the quality of the product and its cost. The LSS management philosophy is based on the theory that to achieve lower costs and improve customer loyalty, reduction in defects is an effective approach. Developing product quality is essential to gain a competitive advantage for profitability and customer satisfaction [6], [55]. Though traditionally, importance relies on measuring output and instituting controls, LSS aims to eliminate them in the first place. LSS is widely used and accepted to both researchers and practitioners [57]. Hence, quality improvement 0018-9391 © 2020 IEEE. Personal use is permitted, but republication/redistribution requires IEEE permission. See https://www.ieee.org/publications/rights/index.html for more information. Authorized licensed use limited to: UNIVERSIDADE DE SAO PAULO. Downloaded on March 08,2025 at 14:03:42 UTC from IEEE Xplore. Restrictions apply. https://orcid.org/0000-0003-4323-3405 https://orcid.org/0000-0002-2340-7394 https://orcid.org/0000-0003-3601-8002 mailto:srijitkrishnan@outlook.com mailto:kmathiyazhagan@amity.edu mailto:raja.sreedharan@uir.ac.ma https://doi.org/10.1109/TEM.2020.3013695 2898 IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, VOL. 69, NO. 6, DECEMBER 2022 is most sought after by companies ranging from small scale to large corporations. As far as an application framework is concerned, define, measure, analyse, improve, control (DMAIC) is the most widely used. However, there are cases where the DMAIC frame- work was critiqued to be ineffective in some organizations [2]. DMAIC lacked proper alignment to organizational goals, lead- ing to incorrect project selection, unsuccessful deployment, and inability to sustain the results obtained from project execution. Literature provides various frameworks developed to address these shortcomings. Majority of these frameworks are theo- retical and lack validation through case application. However, Sreedharan and Sunder [45] developed and validated the SD- MMAICS framework to address the shortcomings of DMAIC. This novel framework introduces three new phases in addition to the conventional DMAIC that include the “select,” “map,” and “sustain” phases. Further, Pareto analysis was used to choose the critical to quality (CTQ) dimensions using their frequency values and used for further analysis. However, the other CTQ dimensions were not considered due to lesser frequency values. Similarly, many kinds of literature ignore the observations from multiple dimensions, which could be used for improvement initiatives. Also, from previous studies, it was found that there is a significant relationship between LSS projectspp. 1–6. [40] F. A. Schouten and C. S. Tapiero, “OR models for maintenance manage- ment and quality control,” Eur. J. Oper. Res., vol. 82, no. 5, pp. 211–213, 1995. [41] S. Abualsaud, Abeer, A. A. Alhosani, A. Y. Mohamad, F. N Al Eid, and I. Alsyouf, “Using six sigma DMAIC methodology to develop a facility layout for a new production line,” in Proc. 8th Int. Conf. Model. Simul. Appl. Optim., 2019, pp. 1–5. [42] M. Shamsuzzaman, M. Alzeraif, I. Alsyouf, and M. B. C. Khoo, “Using lean six sigma to improve mobile order fulfilment process in a telecom service sector,” Prod. Planning Control, vol. 29, no. 4, pp. 301–314, 2018. [43] R. D. Snee, “Impact of six sigma on quality engineering,” Qual. Eng., vol. 12, no. 3, pp. 31–34, 2000. Authorized licensed use limited to: UNIVERSIDADE DE SAO PAULO. Downloaded on March 08,2025 at 14:03:42 UTC from IEEE Xplore. Restrictions apply. https://doi.org/10.1108/ijlss-03-2016-0014 https://doi.org/10.1007/978-3-319-17410-5 https://doi.org/10.3389/fnut.2018.00065 https://doi.org/10.1007/s10479-019-03341-9 https://www.ibef.org/industry/manufacturing-sector-india.aspx https://pib.gov.in/Pressreleaseshare.aspx?PRID ignorespaces = ignorespaces 1579757 2914 IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, VOL. 69, NO. 6, DECEMBER 2022 [44] V. Sreedharan, R., V., G., S. Nair, A. Chakraborty, and J. Antony, “Assess- ment of critical failure factors (CFFs) of lean six sigma in real life scenario: Evidence from manufacturing and service industries,” Benchmarking: An Int. J., vol. 25, no. 8, pp. 3320–3336, 2018. [45] V. Raja Sreedharan and M. Vijaya Sunder, “A novel approach to lean six sigma project management: a conceptual framework and empirical application,” Prod. Planning Control, vol. 29, no. 11, pp. 895–907, 2018. [46] V. R. Sreedharan and R. Raju, “A systematic literature review of Lean Six Sigma in different industries,” Int. J. Lean Six Sigma, vol. 7, no. 4, pp. 430–466, 2016. [47] V. Sreedharan, R. Rajasekar., S. Kannan, P. Arunprasad, and R. Trehan, “Defect reduction in an electrical parts manufacturer: A case study,” TQM J., vol. 30, no. 6, pp. 650–678, 2018. [48] K. Srinivasan, S. Muthu, S. R. Devadasan, and C. Sugumaran, “Enhance- ment of sigma level in the manufacturing of furnace nozzle through DMAIC approach of Six Sigma: A case study,” Prod. Planning Control, vol. 27, no. 10, pp. 810–822, 2016. [49] D M. Stewart and R. G. John, “The human side of mistake-proofing,” Prod. Oper. Manag., vol. 10, no. 4, pp. 440–59, 2009. [50] C. T. Su and C. J. Chou, “A systematic methodology for the creation of Six Sigma projects: A case study of semiconductor foundry,” Expert Syst. Appl., vol. 34, no. 4, pp. 2693–2703, 2008. [51] V. Sunder M., “Rejects reduction in a retail bank using Lean Six Sigma,” Prod. Planning Control, vol. 27, no. 14, pp. 1131–1142, 2016. [52] V. Sunder M., S. Mahalingam, and S. N. Krishna M., “Improving patients’ satisfaction in a mobile hospital using Lean Six Sigma —A design-thinking intervention,” Prod. Planning Control, vol. 31, no. 6, pp. 512–526, 2019. [53] L. C. Tang, T. N. Goh, S. W. Lam, and C. W. Zhang, “Fortification of six sigma: Expanding the DMAIC toolset,” Qual. Rel. Eng. Int., vol. 23, no. 1, pp. 3–18, 2007. [54] A. Vashishth, A. Chakraborty, and J. Antony, “Lean six sigma in financial services industry: A systematic review and agenda for future research,” Total Qual. Manag. Bus. Excellence, vol. 30, no. 3–4, pp. 447–65, 2019. [55] K. E. K. Vimal, K. Jayakrishna, T. Ameen, S. S. Afridhi, and V. Vasudevan, “An investigation on the impact of industrial symbiosis implementation on organizational performance using analytical hierarchical approach. Benchmarking: An Int. J., vol. 27, no. 2, pp. 886–911, 2019. [56] S. Vinodh, S. G. Gautham, and R. Anesh Ramiya, “Implementing lean sigma framework in an Indian automotive valves manufacturing organi- sation: A case study,” Prod. Planning Control, vol. 22, no. 7, pp. 708–22, 2011. [57] S. Vinodh, S. Vasanth Kumar, and K. E. K Vimal, “Implementing lean sigma in an Indian rotary switches manufacturing organisation,” Prod. Planning Control, vol. 25, no. 4, pp. 288–302, 2014. [58] F.-K Wang, C. -. H. Hsu, and G. -. H. Tzeng, “Applying a hybrid MCDM model for six sigma project selection,” Math. Problems Eng., vol. 2014, pp. 1–13, 2014. [59] G. Yadav, D. Seth, and T N. Desai, “Application of hybrid framework to facilitate lean six sigma implementation: A manufacturing company case experience,” Prod. Planning Control, vol. 29, no. 3, pp. 185–201, 2018. [60] V. Yadav, R. Jain, L. Murari, A. P. Mittal, and C. L. Andrew, “The propagation of lean thinking in SMEs,” Prod. Planning Control, vol. 30, no. 10–12, pp. 854–65, 2019. [61] T. Yang, and C. -. H. Hsieh, “Six-sigma project selection using national quality award criteria and delphi fuzzy multiple criteria decision-making method,” Expert Syst. Appl., vol. 36, no. 4, pp. 7594–7603. 2009. [62] F. Zhou, Xu Wang, and A. Samvedi, “Quality improvement pilot program selection based on dynamic hybrid MCDM approach,” Ind. Manag. Data Syst., vol. 118, no. 1, pp. 144–63, 2018. [63] P. Jirasukprasert, J. A. Garza-Reyes, V. Kumar, and M. K. Lim, “A Six Sigma and DMAIC application for the reduction of defects in a rubber gloves manufacturing process,” Int. J. Lean Six Sigma, vol. 5, no. 1, pp. 2–21, 2014. Srijit Krishnan received the bachelor’s degree in mechanical engineering from Amrita School of En- gineering Coimbatore, Coimbatore, India, in 2017, and the master’s degree in industrial and production engineering with distinction from the Department of Mechanical Engineering, Amity University, Noida, India, in 2020. He has been partaking in process improvement projects and is a Certified Black Belt in Lean Six Sigma. He is currently engaged as a Patent Analyst in a reputed firm in Delhi under the Intellectual Property Rights Division – Engineering. His research interests include lean six sigma, TQM, process simulation & analysis, operations research and machine learning. K. Mathiyazhagan received the Ph.D. degree in industrial engineering from National Institute of Technology, Tiruchirappalli, India, in 2014, and the postdoctoral degree in sustainable supply chain from the University of Southern Denmark, Odense, Denmark, in 2017. He is an active Researchers and Academicians in the field of Sustainability and Multicriteria Decision Making. Currently, he is an Associate Professor with the Department of Mechanical Engineering, Amity University, Noida, India. He has authored or coau- thored in top tier journals, including the International Journal of Production Economics, International Journal of Production Research, Production Planning and Control, and Journal of Cleaner Production. Prof. Mathiyazhagan is the recipient of the Excellence Citation Award by Emerald Publisher Ltd. Also, he is currently an Associate Editor of Environment, Development and Sustainability - Springer- Impact Factor 2.1 and edited many special issues in International journals. V Raja Sreedharan received the graduate degree in industrial engineering and the Ph.D. degree in lean six sigma from the College of Engineering Guindy, Anna University, Chennai, India, in 2013 and 2017, respectively. He is currently an Assistant Professor with the Supply Chain Management, BEAR Lab (Business, Economie et Actuariat), Rabat Business School, Uni- versité Internationale de Rabat, Morocco. He has published many works in top tier journals. He also consults in the field of Process Optimization with industries in private sectors. His current research interests are in the field of managing the VUCA in business operations, and process improvement for services industries. Authorized licensed use limited to: UNIVERSIDADE DE SAO PAULO. Downloaded on March 08,2025 at 14:03:42 UTC from IEEE Xplore. Restrictions apply. Gamma 2.2) /CalRGBProfile (sRGB IEC61966-2.1) /CalCMYKProfile (U.S. Web Coated \050SWOP\051 v2) /sRGBProfile (sRGB IEC61966-2.1) /CannotEmbedFontPolicy /Warning /CompatibilityLevel 1.4 /CompressObjects /Off /CompressPages true /ConvertImagesToIndexed true /PassThroughJPEGImages true /CreateJobTicket false /DefaultRenderingIntent /Default /DetectBlends true /DetectCurves 0.0000 /ColorConversionStrategy /sRGB /DoThumbnails true /EmbedAllFonts true /EmbedOpenType false /ParseICCProfilesInComments true /EmbedJobOptions true /DSCReportingLevel 0 /EmitDSCWarnings false /EndPage -1 /ImageMemory 1048576 /LockDistillerParams true /MaxSubsetPct 100 /Optimize true /OPM 0 /ParseDSCComments false /ParseDSCCommentsForDocInfo true /PreserveCopyPage true /PreserveDICMYKValues true /PreserveEPSInfo false /PreserveFlatness true /PreserveHalftoneInfo true /PreserveOPIComments false /PreserveOverprintSettings true /StartPage 1 /SubsetFonts true /TransferFunctionInfo /Remove /UCRandBGInfo /Preserve /UsePrologue false /ColorSettingsFile () /AlwaysEmbed [ true /Algerian /Arial-Black /Arial-BlackItalic /Arial-BoldItalicMT /Arial-BoldMT /Arial-ItalicMT /ArialMT /ArialNarrow /ArialNarrow-Bold /ArialNarrow-BoldItalic /ArialNarrow-Italic /ArialUnicodeMS /BaskOldFace /Batang /Bauhaus93 /BellMT /BellMTBold /BellMTItalic /BerlinSansFB-Bold /BerlinSansFBDemi-Bold /BerlinSansFB-Reg /BernardMT-Condensed /BodoniMTPosterCompressed /BookAntiqua /BookAntiqua-Bold /BookAntiqua-BoldItalic /BookAntiqua-Italic /BookmanOldStyle /BookmanOldStyle-Bold /BookmanOldStyle-BoldItalic /BookmanOldStyle-Italic /BookshelfSymbolSeven /BritannicBold /Broadway /BrushScriptMT /CalifornianFB-Bold /CalifornianFB-Italic /CalifornianFB-Reg /Centaur /Century /CenturyGothic /CenturyGothic-Bold /CenturyGothic-BoldItalic /CenturyGothic-Italic /CenturySchoolbook /CenturySchoolbook-Bold /CenturySchoolbook-BoldItalic /CenturySchoolbook-Italic /Chiller-Regular /ColonnaMT /ComicSansMS /ComicSansMS-Bold /CooperBlack /CourierNewPS-BoldItalicMT /CourierNewPS-BoldMT /CourierNewPS-ItalicMT /CourierNewPSMT /EstrangeloEdessa /FootlightMTLight /FreestyleScript-Regular /Garamond /Garamond-Bold /Garamond-Italic /Georgia /Georgia-Bold /Georgia-BoldItalic /Georgia-Italic /Haettenschweiler /HarlowSolid /Harrington /HighTowerText-Italic /HighTowerText-Reg /Impact /InformalRoman-Regular /Jokerman-Regular /JuiceITC-Regular /KristenITC-Regular /KuenstlerScript-Black /KuenstlerScript-Medium /KuenstlerScript-TwoBold /KunstlerScript /LatinWide /LetterGothicMT /LetterGothicMT-Bold /LetterGothicMT-BoldOblique /LetterGothicMT-Oblique /LucidaBright /LucidaBright-Demi /LucidaBright-DemiItalic /LucidaBright-Italic /LucidaCalligraphy-Italic /LucidaConsole /LucidaFax /LucidaFax-Demi /LucidaFax-DemiItalic /LucidaFax-Italic /LucidaHandwriting-Italic /LucidaSansUnicode /Magneto-Bold /MaturaMTScriptCapitals /MediciScriptLTStd /MicrosoftSansSerif /Mistral /Modern-Regular /MonotypeCorsiva /MS-Mincho /MSReferenceSansSerif /MSReferenceSpecialty /NiagaraEngraved-Reg /NiagaraSolid-Reg /NuptialScript /OldEnglishTextMT /Onyx /PalatinoLinotype-Bold /PalatinoLinotype-BoldItalic /PalatinoLinotype-Italic /PalatinoLinotype-Roman /Parchment-Regular /Playbill /PMingLiU /PoorRichard-Regular /Ravie /ShowcardGothic-Reg /SimSun /SnapITC-Regular /Stencil /SymbolMT /Tahoma /Tahoma-Bold /TempusSansITC /TimesNewRomanMT-ExtraBold /TimesNewRomanMTStd /TimesNewRomanMTStd-Bold /TimesNewRomanMTStd-BoldCond /TimesNewRomanMTStd-BoldIt /TimesNewRomanMTStd-Cond /TimesNewRomanMTStd-CondIt /TimesNewRomanMTStd-Italic /TimesNewRomanPS-BoldItalicMT /TimesNewRomanPS-BoldMT /TimesNewRomanPS-ItalicMT /TimesNewRomanPSMT /Times-Roman /Trebuchet-BoldItalic /TrebuchetMS /TrebuchetMS-Bold /TrebuchetMS-Italic /Verdana /Verdana-Bold /Verdana-BoldItalic /Verdana-Italic /VinerHandITC /Vivaldii /VladimirScript /Webdings /Wingdings2 /Wingdings3 /Wingdings-Regular /ZapfChanceryStd-Demi /ZWAdobeF ] /NeverEmbed [ true ] /AntiAliasColorImages false /CropColorImages true /ColorImageMinResolution 150 /ColorImageMinResolutionPolicy /OK /DownsampleColorImages false /ColorImageDownsampleType /Bicubic /ColorImageResolution 900 /ColorImageDepth -1 /ColorImageMinDownsampleDepth 1 /ColorImageDownsampleThreshold 1.00111 /EncodeColorImages true /ColorImageFilter /DCTEncode /AutoFilterColorImages true /ColorImageAutoFilterStrategy /JPEG /ColorACSImageDict > /ColorImageDict > /JPEG2000ColorACSImageDict > /JPEG2000ColorImageDict > /AntiAliasGrayImages false /CropGrayImages true /GrayImageMinResolution 150 /GrayImageMinResolutionPolicy /OK /DownsampleGrayImages false /GrayImageDownsampleType /Bicubic /GrayImageResolution 1200 /GrayImageDepth -1 /GrayImageMinDownsampleDepth 2 /GrayImageDownsampleThreshold 1.00083 /EncodeGrayImages true /GrayImageFilter /DCTEncode /AutoFilterGrayImages true /GrayImageAutoFilterStrategy /JPEG /GrayACSImageDict > /GrayImageDict > /JPEG2000GrayACSImageDict > /JPEG2000GrayImageDict > /AntiAliasMonoImages false /CropMonoImages true /MonoImageMinResolution 1200 /MonoImageMinResolutionPolicy /OK /DownsampleMonoImages false /MonoImageDownsampleType /Bicubic /MonoImageResolution 1600 /MonoImageDepth -1 /MonoImageDownsampleThreshold 1.00063 /EncodeMonoImages true /MonoImageFilter /CCITTFaxEncode /MonoImageDict > /AllowPSXObjects false /CheckCompliance [ /None ] /PDFX1aCheck false /PDFX3Check false /PDFXCompliantPDFOnly false /PDFXNoTrimBoxError true /PDFXTrimBoxToMediaBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXSetBleedBoxToMediaBox true /PDFXBleedBoxToTrimBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXOutputIntentProfile (None) /PDFXOutputConditionIdentifier () /PDFXOutputCondition () /PDFXRegistryName () /PDFXTrapped /False /CreateJDFFile false /Description /CHT /DAN/DEU /ESP /FRA /ITA (Utilizzare queste impostazioni per creare documenti Adobe PDF adatti per visualizzare e stampare documenti aziendali in modo affidabile. I documenti PDF creati possono essere aperti con Acrobat e Adobe Reader 5.0 e versioni successive.) /JPN /KOR /NLD (Gebruik deze instellingen om Adobe PDF-documenten te maken waarmee zakelijke documenten betrouwbaar kunnen worden weergegeven en afgedrukt. De gemaakte PDF-documenten kunnen worden geopend met Acrobat en Adobe Reader 5.0 en hoger.) /NOR /PTB /SUO /SVE /ENU (Use these settings to create PDFs that match the "Suggested" settings for PDF Specification 4.0) >> >> setdistillerparams> setpagedeviceand business per- formance. However, the relationship differs for every project and has a nonlinear pattern, which influences the decision taken in the LSS projects. Moreover, no LSS project has reported on the nonlinearity in the LSS project evaluation. Further, the available information is not adequate to prioritize the key dimension for the initiatives and no measure was considered to address the nonlinearity in the LSS project evaluation. Therefore, the authors have proposed, a hybrid approach, which integrates the SDM- MAICS with the DEMATAL for identifying the key initiatives in the improve phase and thereby enhancing the LSS project management. Further, the hybrid approach, identify the key dimension for a given project which can reduce the nonlinearity in the process evaluation. In this article, we apply and enhance select, define, measure, map, analyse, improve, control, sustain (SDMMAICS) by in- troducing DEMATEL. DEMATEL is a strong tool, capturing group knowledge and precisely establishing a cause-effect re- lationship in a problem measurement. The previous study by Gupta et al. [15] used the DMAIC and DEMATEL model in their study, where DEMATEL was used as a project selection tool. However, in the present study, SDMMAICS is integrated with the DEMATEL to prioritize the key dimension of LSS projects. Further, the DEMATEL is used to address the nonlinearity in the decision-making process in various phases of the SDMMAICS. Furthermore, this article also brings in a KAIZEN approach into the framework toolbox to enhance the feature of the LSS project. KAIZEN focuses on the continuous improvement feature of LSS projects. Once project goals are obtained, it is good practice to not only sustain but continuously seek improvements in performance and quality standards. The hybrid approach applicability is illustrated through its deployment in a medium-scale tool manufacturing firm facing reworks and rejections in their polycrystalline diamond (PCD) reamer manufacturing production line. Major costs associated with reworks and rejections were realized by the management. This affected customer delivery adherence to about 70% only. So, to improve the productivity of the firm, the management LSS project is reported in this article. The rest of this article is organized as follows. Section II provides a literature review, followed by Section III that presents the methodology followed under this case study. Section IV illustrates the use case of the aforementioned SDMMAICS– DEMATEL model. The results are discussed in Section V, followed by Section VI, which concludes this article. II. RELATED WORKS A. LSS in Part Manufacturing LSS is ultimately aimed at achieving success in achieving the satisfaction of customer requirement and not to meet the internal requirements. Additionally, the business’ sustenance heavily relies on its internal and external process efficiency [8]. LSS is a philosophy focused on achieving operational excellence [23]. To generate maximum monetary benefits and competitive advantage, a considerable number of global organizations have used LSS [50]. Literature provides several definitions for LSS [10], [21]. It is a problem-solving methodology, to identify and validate the root cause of process problems. Since intuitionistic based solutions do not help identify root causes, this scientific methodology is used [34]. LSS has proven to be a powerful philosophy [31], [39]. Lean philosophy is used to create the most value for the customer, while the least amount of resources is consumed for designing, building, and sustenance of the product [17], [60]. LSS is an integration of tools and techniques of waste elimination (lean) and the SS tools and techniques for variation reduction. Companies combine lean tools into the SS framework to achieve a higher degree of competitiveness [56]. LSS has widespread application in the manufacturing sector. Its applicability in improving process performance is evident from literature [25], [48]. The LSS roadmap has advocated design thinking and has been frequently used to bring about breakthrough improvements in the manufacturing sector. Many works of literature provide cases of LSS applicability in manu- facturers to achieve higher process capabilities, reduced costs, and improved organizational performance [1]. B. LSS Hybrid Model LSS does not target a single quality characteristic, it rather is an approach for continuous improvement. All dimension of busi- ness processes that are critical to the customer are focused upon and LSS identifies and eliminates the root causes of defects under these dimensions [43]. Organizations aim to achieve bottom-line improvements to realize increased customer satisfaction and an expanded reach of the market [53]. As pointed out in the previous section, the application of multiple criteria decision making (MCDM) into the LSS model has a limited presence in literature. MCDM tools have extensive applicability in both academic research and industry [11]. LSS is widely recognized as a statistical approach with QM tools incorporated in it. However, problems such as Authorized licensed use limited to: UNIVERSIDADE DE SAO PAULO. Downloaded on March 08,2025 at 14:03:42 UTC from IEEE Xplore. Restrictions apply. KRISHNAN et al.: DEVELOPING A HYBRID APPROACH FOR LEAN SIX SIGMA PROJECT MANAGEMENT 2899 TABLE I REVIEW SUMMARY multidimensional defect prioritization, production planning and services, training unskilled and semiskilled operators, waste management, resource allocation, and investment decisions cannot be handled using LSS alone. However, they can be effectively tackled using MCDM techniques [53], [47]. The goal of MCDM is to support decision makers by ensuring the most effective decision/course of action that the company should take to manage operations involving multiple criteria, incorporating well into the LSS framework [46]. Also, continuous improvement requires utilization of both qualitative and quantitative information and play a significant role in an efficient and effective business process [9]. Therefore, MCDM must be integrated into the LSS structure by practitioners to enhance LSS applications and for the sustenance of the value of LSS for improvements in business processes [47]. Literature provides many instances where researchers integrated LSS with MCDM tools like DEMATEL, analytical hierarchy process, analytical network process (ANP), and goal programming [19], [36], [15]. However, due to limited availability of literature establishing the use of MCDM in LSS phases, practitioners’ acceptability of these tools is low and hence limits the capability of LSS in strategic decision making. In this article, we use the MCDM technique for a decision-making quality issue in the implementation phase of the SDMMAICS implementation in the reamer manufacturing process. We provide a listing of few studies in literature where MCDM has been integrated with quality improvement programs (see Table I). C. Addressing Limitations of DMAIC Using SDMMAICS Although there is plenty of evidence that DMAIC leads or- ganizations to significant performance improvement, there is, however, room for improvement. McLean et al. [24] claimed that the DMAIC framework does not consider the sustainability of the results of its implementation. LSS focuses on continuous improvement and emphasizes on achieving long-term sustain- ability of process improvement, which is not addressed in the DMAIC methodology [42]. Pinedo-Cuenca et al. [33] pointed out that projects suffer due to project teams rushing to finish projects and as a result not ensuring sustainability. Most frameworks lack practitioners or consultants, hence, a rigorous framework is needed to validate project benefits [37]. Continuous improvement projects fail due to failure in linking the business goals to the project methodology, so, a customized SS framework should address this issue. Furthermore, one of the main reasons for project failure is incorrect selection.This becomes more apparent when these projects do not align with the business’ goals ([35], [57]). Sreedharan and Sunder [45] expanded on the limitations of DMAIC and conceptualized a new framework, SDMMAICS. The SDMMAICS is claimed to fill in the gaps addressed by DMAIC implementation. Sreedharan and Sunder [45] devel- oped this framework based on data from manufacturing in- dustries. This novel model supports the effective deployment of LSS projects effectively. It is also flexible enough to ac- commodate business goals and provide sustainable measures to the improvements. The select phase of the novel framework ensures an effective project selection by capturing the driving and restraining forces of a project. The map phase enriches LSS by further synergizing lean and SS. The sustain phase ensures the control phase maintains and does not deviate from the project objectives even after several months. The sustain phase pushes the control phase to ensure process stability postproject by reviewing the possibilities to improve process performance are monitored. DMAIC is considered the most common and effective of the various available frameworks, though, it has been used extensively. SDMMAICS, however, fills the gaps Authorized licensed use limited to: UNIVERSIDADE DE SAO PAULO. Downloaded on March 08,2025 at 14:03:42 UTC from IEEE Xplore. Restrictions apply. 2900 IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, VOL. 69, NO. 6, DECEMBER 2022 in the DMAIC framework, making it more effective in LSS projects. In this article, the SDMMAICS framework is further enhanced by incorporating an MCDM tool. Literature does not provide a setting where several dimensions to improvements but insufficient information to prioritize the major dimensions [15], [47]. Tang et al. [53] reported that most SS tools and methods are drawn from statistics or part of QM theoretical developments [16]. Gupta et al. [15] suggested that MCDM tools such as DEMATEL intensifies the effectiveness and broadens the appli- cation of LSS projects. Gupta et al. [15] utilized DEMATEL as an enhancement feature of the DMAIC framework. With this take, the DEMATEL tool has been applied in the improve phase of the new framework, hence expanding the toolkit of LSS with MCDM-based methods. This hybrid framework empowers employees, management of stakeholders, and also the narrow project only approach of deploying LSS in a process [45]. D. Approaching Reamer Production Issues Reamers are fluted multiedge cutting tools having applica- tions in a widespread of industrial sectors to enlarge, accurately sizing, and smoothening existing holes on workpieces. The qual- ity of the bore is affected mainly, not exclusively, by the reamer properties and dimensions [28]. Reamers have a high demand in the manufacturing sector. The quality of the end product is, therefore, crucial to ensure customer satisfaction and sustenance of the company in the global market. The case company has not implemented automation, and this exposes the production line to various dimensional quality issues as a result of traditional manufacturing methods. The company has been experiencing major reworks and rejections of reamers due to inaccuracies in dimensions as per customer requirement. This being a quality issue, this called for a strategic quality improvement program. To resolve the big problem, that is the big “Y,” the root causes were required to be identified and resolutions were implemented for improvements based on data and various quality criteria in reamer production. The case company had previously deployed LSS under DMAIC, however, its use was not effective. First, there have been previous instances in the case company when projects conducted had not achieved its objective, resulting in wastage of time and money. This was a frequent threat to the firm as they had not attempted a project selection evaluation previously. Second, it was identified that there was less practice of lean in the manufacturing line. Employees only focused on achieving the target for the day rather than strategically operate using a methodical practice such as lean. Finally, with increasing demand for reamers, it was necessary to ensure sustenance of the production process to ensure that future demands are met with international quality and satisfied customers. Considering the limited literature and LSS cases reporting on the hybrid LSS frameworks, this article illustrates a case report on the hybrid SDMMAICS–DEMATEL model for an LSS project in a medium-scale manufacturing plant. With the addition of DEMATEL, we also bridge the gap for practitioners to address the nonlinearity in decision making. Further, the authors specifically utilize DEMATEL rather than other MCDM tools because it accounts for nonlinearity or biases in evaluating the expert’s opinion and its applicability in different scenarios. The sustenance of the LSS project deployment was ensured by a customized KAIZEN model that the team developed. The proposed SDMMAICS–DEMATEL can address the LSS project needs in a better manner. Further, the majority of the models con- stitutes statistically derived tools; methods and developments in LSS. This leaves room for expansion of the available LSS toolkit. However, limited studies have integrated MCDM and managerial methods with LSS frameworks and findings from such studies are in the early stage for generalization. So, in the present work, DEMATEL in the improve phase, and also, illustrates the incorporation of a KAIZEN model developed in this article to ensure sustenance of the model aforementioned. III. METHODS The case study approach was used to illustrate how the LSS project improves in-house rejection at a tool manufacturing company by reducing the reamer tool production defects. The associated implications and lessons learnt are also presented. A case study approach is followed because it gives flexibility in design and application. Further, both qualitative and quantitative analysis can report effectively the organizational complexities than pure quantitative methods [52]. Further, case study ap- proach explores the complex and critical value chain activities in the organization. This methodology is thereby relevant for LSS implementation studies. A case study is advantageous because it provides a first-hand and an in-depth understanding of a par- ticular situation. It relies on direct observation and data capture in a natural setting rather than relying on derived data [45]. In this article, a real-time problem of customer dissatisfaction resulting from high production cycle time of reamer production at a tool manufacturing company is examined and resolved using the SDMMAICS–DEMATEL approach, however, the generality of a single case study that can be claimed to be limited. However, documenting the experiences from the case is a valuable addition to the available knowledge for researchers and future practition- ers. It is evident from the literature that case study research is well-accepted by scholars. DMAIC has been used effectively by both practitioners and scholars for LSS implementation in orga- nizations for continuous improvement, however, it is found to be unsuccessful in a few cases. SDMMAICS is a more powerful approach to DMAIC with addition to the “select,” “map,” and “sustain” phases. These eight phases strategically guide project managers in LSS deployment from the initial step of project selection, step by step LSS execution, and the sustenance of project outcomes. Though SDMMAICS systematically follows a sequence of phases, amendments can be made to it to suit the context of the organization. It is, therefore, not a rigid generalized guideline to LSS project deployment. In most LSS applications, multiple quality dimensions pro- mote improvement effort. For instance, Gijo and Scaria [14] applied LSS to improve the first past yield for the honing process in an automotive parts manufacturing unit. Whereas, in the case when more than one critical quality dimensionsare identified, Pareto analysis is used to prioritize them. It is worth noting that Authorized licensed use limited to: UNIVERSIDADE DE SAO PAULO. Downloaded on March 08,2025 at 14:03:42 UTC from IEEE Xplore. Restrictions apply. KRISHNAN et al.: DEVELOPING A HYBRID APPROACH FOR LEAN SIX SIGMA PROJECT MANAGEMENT 2901 Pareto requires large datasets for prioritization related issues and obtaining such large data could not just be costly, but also time consuming [63]. Existing literature does not provide sce- narios when several dimensions are analyzed wherein efforts for improvement can be targeted but with insufficient information to prioritize the key dimensions. Therefore, in this study, an analytical approach illustrates the application of DEMATEL, an MCDM tool, to prioritize CTQ factors of the electron discharge machine (EDM) process in the improve phase of SDMMAICS, thereby expanding the LSS toolkit. DEMATEL is used here because it helps to evaluate nonlinear relationships and also accounts for biases in decision making. LSS tools such as force-field analysis, project charter, suppli- ers, inputs, process, outputs, and customers (SIPOC), Ishikawa diagram, process capability, gage R&R, Pareto analysis, Takt time analysis, and control charts are used in the case study following SDMMAICS. As aforementioned, DEMATEL is em- bedded in the framework, making this article unique in the perspective of literature and live application. Since the step by step SDMMAICS methodology has been already captured in detail by Sreedharan and Sunder [45], we present an overview as follows. 1) Select phase: Emphasize the correct selection of the LSS project aligned with the business priorities. 2) Define phase: Understand and formulate the problem. 3) Measure: Understand thoroughly the current state of the process, and reliable data are collected to underlay the root causes of problems 4) Map: Strengthen the lean aspect of LSS. In this phase, process-oriented tools may be utilized to identify causes through visual methods. 5) Analyze: Identify the root causes of issues in the process. 6) Improve: Selects these process characteristics (X’s) that need to be improved to mitigate or eradicate Y. The im- provements are suggested and implemented. DEMATEL tool is embedded in this phase to prioritize the quality features that require improvement in the EDM process. The details of the steps undergone for DEMATEL are provided in the Appendix. 7) Control: Ensure that the implemented process conditions are continuously monitored using control charts and doc- umented. 8) Sustain: An extension of the project for monitoring beyond the control phase to ensure that the benefits from the LSS project sustain on a long-term basis. A. Data Collection Depending on the phase, data capture methods varied from brainstorming sessions, direct measurements from operations, and historic data from the line manager. We present the capture methods accordingly under each phase of case illustration. The project spanned three months, during which time, visits were made only when direct interactions or brainstorming sessions were required. This included visits during the select, define and improve phases. Otherwise, quantitative data were captured by the line manager and shared with the team. Data were collated in Microsoft Excel and basic analysis was done on it. Minitab, a statistical software tool was used for complex data analysis. This software was used due to its ease of use. Results generated from the software are in a standard format for data presentation. The word “standard” meaning the output is presentable and easily understood. IV. USING THE SDMMAICS–DEMATEL MODEL: A CASE ILLUSTRATION A. Case Background This article aimed at improving the quality of the PCD reamer production line by reducing reworks in a tool manufacturing plant located in the northern region of India. The plant is a division of a major group, set up in the early 1990s and is involved in the production of reamers, drill bits and various other tools for industrial application. The company has grown exponentially employing about 1000 people with operating rev- enue of up to Indian Rupee (INR) 500 crores. The organization has plants spread across the Indian subcontinent with clients ranging from small-scale local industries to major clients across the world. The reamer line provides major income to the specific manufacturing unit in which the study was conducted. However, the plant has been experiencing high lead times in PCD reamer production resulting in adherence to on-time delivery of finished products only about 70% of the time. To maintain commercial confidentiality, limited details of the firm are disclosed. The management team was anxious to improve customer satisfaction levels to establish higher quality standard in their organization. As there was a lack of a system to measure the current state of the production process, an LSS team was created to evaluate the current scenario in the production line. It must be noted that this is a manufacturing firm that followed DMAIC methodology. However, it was expressed by management that past instances of failure in LSS deployment. These varied from improper project selection due to the rush of completing it, lack of knowledge of the spread of toolkit and lack of sustenance of project out- comes over a long period. The project was therefore initiated to follow SDMMAICS to mitigate reworks and rejections within the reamer line. The project plan was designed and initiated by the LSS team. The team consisted of an LSS black belt, two university professors, the floor supervisor, and the line manager. As per the direction of the management, a nonstructured inter- view with the process stakeholders was done to understand how satisfaction levels of the clients can be improved. Most of the stakeholders expressed concern in the cycle time of production due to excess reworks during processing. The management felt the root cause needed to be understood, the team was tasked with finding an effective fix by taking this issue as an opportunity for the project. A force-field analysis was developed by scoring each of the change factors identified by a meeting session of the team with the line manager was scored (see Table II). The scores for each force were provided. Each force was scored from 1 (weak) to 5 (strong) based on the degree of influence each force had on the plan to implement LSS. The scores are then added up for either side (for and against). Since the total “for” conducting the project exceeded “against” by six points, it was decided to move forward to the next phase. Authorized licensed use limited to: UNIVERSIDADE DE SAO PAULO. Downloaded on March 08,2025 at 14:03:42 UTC from IEEE Xplore. Restrictions apply. 2902 IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, VOL. 69, NO. 6, DECEMBER 2022 TABLE II FORCE-FIELD ANALYSIS TABLE III PROJECT CHARTER B. Define To evaluate the various project charter elements, the LSS team conducted conversational interviews (structured, one-on-one) with the production head and the reamer line manager. Sub- sequent to this interaction, the LSS team defined the business case, problem statement and the goal of conducting the project. The purpose and scope of the project is captured well in the project charter (see Table III). It also defines the expectations of quality from the project. The project charter was submitted to the management and sanctioned by the plant production head. A process mapping in the form of SIPOC was then generated after a study of the entire production process (see Table IV). The SIPOC gives a helicopter view of the project. With this tool, the team was able to identify all relevant elements of the process improvement effort before work began. C. Measure The LSS team held brainstorming sessions with personnel associated with the reamer production line that includes the production supervisor and the operators to identify the effects the bigger “Y,”that is, dimensional variation (see Fig. 1). The DPMO for the reamer line has been calculated and sub- sequently, the process capability determined considering the 1.5 sigma shift (MJ [27]) is summarized in Table V. The long-term sigma refers to the actual sigma level the process undergoes. Short-term sigma signifies the best level the process can undergo in a finite period under ideal conditions. The LSS team consulted the production staff associated with the reamer line to identify the machinery that results in most of the rejections/reworks, the total machinery-wise reworks for the past one year were collated and a Pareto chart generated (see Fig. 4). Pareto analysis helps to focus attention on just a few of the vital factors of the process instead of all the factors. Based on Fig. 2, it is observed that CG, VOL, and PG20 account for 80% of the total rejections/reworks. It must be noted that though CG, PG20, and TCG are separate workstations, their function is essentially the same that is, grinding. This analysis was used to discuss the progress of the study with the production team at the plant. The discussion led to narrowing down of the potential “X”s to be associated with grinding and EDM. These “X”s identified as the potential causes of dimensional variability, is presented in Table VI. 1) Repeatability and Reproducibility (R&R): To conduct a gage R&R, six reamer parts were measured to determine the Authorized licensed use limited to: UNIVERSIDADE DE SAO PAULO. Downloaded on March 08,2025 at 14:03:42 UTC from IEEE Xplore. Restrictions apply. KRISHNAN et al.: DEVELOPING A HYBRID APPROACH FOR LEAN SIX SIGMA PROJECT MANAGEMENT 2903 TABLE IV SIPOC Fig. 1. Ishikawa diagram for reworks/rejection of reamer in the production line. TABLE V EXISTING PROCESS CAPABILITY CALCULATION tolerance after operations on a CG were done. The upper limit of tolerance on diameter was at 0.003 mm. Measurement of diameter was done by three operators for two trials each with six TABLE VI POTENTIAL “X”S Authorized licensed use limited to: UNIVERSIDADE DE SAO PAULO. Downloaded on March 08,2025 at 14:03:42 UTC from IEEE Xplore. Restrictions apply. 2904 IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, VOL. 69, NO. 6, DECEMBER 2022 Fig. 2. Pareto chart of reworks associated with workstations. Fig. 3. Takt time adherence of a batch order. reamers to check adherence to diameter tolerance. The measured values were noted and run in Minitab software. The ANOVA gage R&R test results showed 91.03% against the Gage R&R contribution of 9.97%; four distinct categories; and 29.96% of tolerance out of the total variance. Based on general rules iterated by Barbato et al. [3] for acceptance of measurement system analysis (MSA), the three rules for Gage R&R passed and hence concluded that the measurement system is acceptable for data collection. D. Map The processes undergone by a batch order for the month was analyzed, the takt time was calculated and the process exceeding the takt time have been identified. Illustrated in Fig. 3 is the representation of adherence of the various processes undergone to the takt time in the reamer line to produce the final product. With reference to Fig. 3, processes 2, 3, 4, 7, 8, and 9 are various grinding processes in the reamer line. Processes 5 and 6 are EDM and brazing processes, respectively. This indicates that these processes are taking much longer than the takt time. Reworks are used to make up for defects and are the major reason for nonadherence of the aforementioned processes to the takt time. Processes 1 and 10 are manufacturing sheet generation and final process of shank grinding, respectively. They can adhere to the takt time and hence not a focus area. The insights from this phase are further confirmation of the findings in the measure phase. Authorized licensed use limited to: UNIVERSIDADE DE SAO PAULO. Downloaded on March 08,2025 at 14:03:42 UTC from IEEE Xplore. Restrictions apply. KRISHNAN et al.: DEVELOPING A HYBRID APPROACH FOR LEAN SIX SIGMA PROJECT MANAGEMENT 2905 Fig. 4. Pareto chart of potential “X”s. TABLE VII ROOT CAUSE VALIDATION METHOD AND IDENTIFICATION E. Analyze As mentioned in the earlier section, it is concluded that the grinding and EDM processes need to be analyzed. Defects including “size less,” “aesthetic,” “fouling,” “size plus,” “runout not ok” are a result of grinding in the production line in either of the grinding workstations. “Chipping” of the PCD tool and “coolant hole not ok” are EDM induced defects. “Operation missing” is a defect caused by operator negligence. Sometimes the sequence of processing may not be followed exactly as pro- vided in Table IV. This may lead to the operator unintentionally neglecting to perform a machining operation on the workpiece. The quality department identifies the missing operation and notifies the line in-charge. The LSS team studied the grinding and EDM processes over one month and the number of rejections due to the “X”s identified and prioritized (see Fig. 4). The Pareto analysis shows that the “size less” contributes most, closely followed by “aesthetic,” “fouling,” “operation missing,” “size plus,” “chipping,” and “runout not ok” account for 80% of the total defects. Some of these “X”s were validated by GEMBA method whereby the process was observed, and a decision was taken if it was a root cause or not (Refer Table VII). The remaining causes were analyzed through process capability analysis to test if the process can perform within the specifications. The reamer production process was observed by the team at random frequency during one month and observations for 25 reamers were noted. Since the reamers being ordered were in batches of small numbers of varying specifications, it was decided to collect the runout and the oversize from the target diameter. Normality of runout and oversize data was tested and p-values 0.520 and 0.061 were obtained. A p-value > 0.05 indicates normality of data. Hence both sets of data collected were normal. A process capability analysis was performed using the collected data, and capability plots for size plus [see Fig. 5(a)], and runout [see Fig. 5(b)] generated. Both plots indicate the capability “within” the sample and the overall (that is, population) capability does not conform to the specification. It can, therefore, be concluded that size plus and runout are root causes. Based on the analysis done, the root causes have been identified and summarized in Table VII. F. Improve Discussions were made and the root causes were further divided into subclauses. A solution to each of these subcauses was proposed. Grinding related issues were identified to be caused mostly due to the use of inefficient grinding wheels. The replacement of cubic boron nitride (CBN) grinding wheels was proposed. Furthermore, installing a rotational dog was proposed Authorized licensed use limited to: UNIVERSIDADE DE SAO PAULO. Downloaded on March 08,2025 at 14:03:42 UTC from IEEE Xplore. Restrictions apply. 2906 IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, VOL. 69, NO. 6, DECEMBER 2022 Fig. 5. (a) Capability plot—Size plus. (b) Capability plot—Runout. TABLE VIII CLASSIFICATION OF DEFECTS INTO CAUSE AND EFFECT GROUPS to ensure alignment issues of wok piece holding for the grinding process. It was found that chips formed during grinding were affecting the process, hence, it was suggested to install a dispose vane. Further, to identify the major influencing factor in the EDM process, DEMATEL was used to priorities the key dimension based on the expert’s inputs. It must be noted that previously, it was not possible to establish direct relationship between the influencing quality dimensions. However, this nonlinearity in relationship of the critical quality factors with regard to the EDM process was established using DEMATEL. In the DEMATEL analysis, it was required to create a pairwise matrix. The initial matrix was created based on response from two EDM operators, aline supervisor and the production manager. The responders were asked to rate the level of influence in a five-point Likert scale with “0” being “no influence” to “5” being “very high influence.” Following the DEMATEL steps enumerated in the Appendix section, the responses were averaged to obtain the average direct relation matrix (matrix A), which was then nor- malized to matrix X. A total relation matrix (T) is then obtained, from which the summation of horizontal values of the matrix represented by “D” and the vertical summation represented by “R.” From this, we arrive at Table VIII, illustrating a calculation for each individual CTQ factor affecting EDM. D–R values classify factors into either a cause or an effect. For values of D–R greater than zero, we classify them as cause factors, and for those values below zero are effect factors. D+R values indicate the level of prominence of the factors. These values are further used to create the cause–effect and prominence graphs (see Figs. 8 and 9). As we are focused on identifying the causes for reworks/defects in this process, we identified from DEMATEL application that V3, V4, V5, and V7 are cause factors. However, V7 had the highest cause rating of 1.11. Furthermore, D+R values indicate highest prominence on V7. For this reason, it was concluded by the LSS team that Impurities from brazing (V7) was the factor most critical to the EDM process undergone in the plant. This claim was, therefore, verified through the DEMATEL approach (Refer the Appendix). It was identified that the brazing operation was exposed to impurities and a solution to this would be to install an inert atmospheric glove box to perform the joining operation. Another major problem was the issue of operation missing. This problem is induced by the improper system to ensure no operation goes undone. To address this, it was suggested to use color coded vacuum bags to ensure a systematic flow of workpiece in the line. The remedies proposed are summarized in Table IX. The details regarding improvement remedies are detailed in Section V. Postimplementation, we calculated the sigma level and based on data for one month. A short-term sigma level of 4.3 and long-term sigma level of 2.8 was achieved, elaborated further in Section V.A.2. G. Control Making sure that improvements are standardized and moni- tored is necessary to stabilize the improvements. In this phase, the SDMMAICS aimed to stabilize operations after improve- ments where implemented. Postimprovements in the reamer line, short-term sigma level of 4.3 were achieved from 3.3 calculated preimplementation. Furthermore, the cycle time of production was reduced to 17.6 d from the baseline 20 d. Once stabilized, the project team documented all activities on the project pre- and postimprovement. Employees were trained on the standard operating procedures to ensure improved process performance is maintained. It was recommended to process stakeholders that regular sampling is done to ensure process performance is monitored. The plant maintains statistical pro- cess charts to ensure that processes are controlled and within the limits set out by the required quality. This ensures that any special causes occurring in the future may be identified and removed immediately. To check for process control, a p-chart for fraction defectives was generated (see Fig. 6), indicating conformance of reamer production within the control limits. H. Sustain A major challenge of LSS is not implementing the improve- ment changes but making sure that the improvement sustains Authorized licensed use limited to: UNIVERSIDADE DE SAO PAULO. Downloaded on March 08,2025 at 14:03:42 UTC from IEEE Xplore. Restrictions apply. KRISHNAN et al.: DEVELOPING A HYBRID APPROACH FOR LEAN SIX SIGMA PROJECT MANAGEMENT 2907 TABLE IX SUMMARY OF SOLUTIONS PROPOSED Fig. 6. P-chart of defectives. [14]. It has been shown in the literature that maintaining im- proved results can be challenging due to people changing jobs [13]. Since the manufacturing plant was ISO 9001:2015 cer- tified, they follow standardized documenting procedures and LSS was documented. This serves as a basic training document for future employees of the firm. It was proposed that existing employees be provided with regular training sessions to upscale the available skills in the firm. It was suggested that at least green belt level LSS training be provided to employees all the while using the SDMMAICS as a framework with inclusion of various tools from OR and QM techniques to enhance project capabilities. This ensures that the learning from previous phases could be applied, transferred, and shared across the organization to yield long-term benefits. The team further suggested the creation of an internal team involving process stakeholders post their LSS training. The internal team would be tasked to process innovation in the plant. As a result, providing KAIZEN ele- ments of improved morale, personal discipline, and teamwork, KAIZEN based model was proposed and illustrated in Fig. 7. V. RESULTS AND DISCUSSION A. Process-Wise Remedies 1) Grinding Cost-Effective Improvement: It was proposed to use time–frequency analysis by inspecting the quality of the surface by monitoring the surface topography in one revolution Authorized licensed use limited to: UNIVERSIDADE DE SAO PAULO. Downloaded on March 08,2025 at 14:03:42 UTC from IEEE Xplore. Restrictions apply. 2908 IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, VOL. 69, NO. 6, DECEMBER 2022 Fig. 7. Sustain—a KAIZEN approach. of the workpiece (see [7]). Superior grinding performances may be achieved with CBN grinding wheel, super abrasive wheels, which achieves long-term stable performance and long dressing interval compared to the Aluminum oxide wheels currently being used in the plant [22]. As an added benefit, CBN has a positive impact on the aesthetics of the workpiece. Energy effective improvement: Majority of the grinding en- ergy goes into overcoming the friction between the workpiece and grinding wheel [29]. A water-soluble coolant may be used instead of an oil-based one to provide effective cooling at the grinding zone of the reamer workpiece, which is ordinarily under high temperature and pressure. Furthermore, using the CBN wheel as mentioned earlier will provide performance grinding by reducing energy associated with chip formation without inducing excess strain or deformation. Retrofit solution/modification: Fouling occurs when the ground material moves into areas, where various adjustable mechanisms are located or bearing areas, hence forcing the operator to stop the grinding machine, disassemble, and clean. A solution to this problem is to provide a suitable dispose vane closely confronting the housing designed to direct material in an outward direction under the direction of the outward flow of air toward the discharge outlet. Furthermore, the coolant used during operations may consist of impurities. This can be mitigated with the use of coolant filtration systems, one that is capable of automatically cleaning out the contaminants from the filter itself, meaningless effort from the operator’s side to clean the filter. The grinding process carried out in the production line is done between centers. Though, it is the most widely used work holding method, it has its limitations, one of them being workpiece deflection, resulting in diametrical inaccuracy. The proposed remedial action to address the issue of cylindricity and low workpiece clamping stiffness was to retrofit a rotation dog that connects to the headstock. During the grinding process, this fixture would ensure that the centers remain in solid contact with the center of the workpiece. 2) W-EDM: The PCD chipping off was a major concern. Crack in the PCD would mean rejection of the workpiece and a monetary loss for that workpiece. Various quality factors may be associated with the EDM process; however, it was neces- sary to prioritize them, considering the feasibilityof possible breakthrough remedial action. The DEMATEL tool was used for factor prioritization involved in the EDM process. Eight quality factors were identified by process operators and quality inspectors. The eight factors being—impurities in dielectric fluid (V1), defective electrode (V2), wire tension (V3), wire bending (V4), wire vibration (V5), rate of material removal (V6), impurities from brazing (V7), PCD surface roughness (V8). The steps iterated in Section III.A were followed and resulting graphs generated [see Figs. 8 and 9]. V7 indicates maximum cause with a D–R value of 1.110. Furthermore, V7 indicates the highest prominence of 2.64. It was therefore concluded by the team to address PCD chipping issue by remedying the issue of V7—impurities from the brazing operation. Authorized licensed use limited to: UNIVERSIDADE DE SAO PAULO. Downloaded on March 08,2025 at 14:03:42 UTC from IEEE Xplore. Restrictions apply. KRISHNAN et al.: DEVELOPING A HYBRID APPROACH FOR LEAN SIX SIGMA PROJECT MANAGEMENT 2909 Fig. 8. Cause–effect classification of defects based on D–R values. Fig. 9. Prominence graph for defects with D+R values. 3) Brazing: The brazing operation is conducted manually in an open environment and is susceptible to human error. This leaves the process exposed to minute dust particles that could lead to defects/reworks in the later stages of the reamer produc- tion. This can lead to the potential build-up of internal stresses within the PCD resulting in its fracturing during processing in the W-EDM. An equipment solution to this was to use an inert atmosphere glove box system to avoid any chances of impurities affecting the final quality of output from the brazing operation. 4) Operation Missing: Missing an operation is due to negli- gence from the operators’ side. To remedy this issue, an approach for quality improvement may be adopted to achieve improve- ments. Poka-yoke, meaning “mistake-proofing” in Japanese, has gained wide acceptance among many industry practitioners because of its effectiveness (STEWART and GROUT 2009). The philosophy of Poka-Yoke may be used in the reamer line to ensure that the final product is of high quality. Each of the steps needs to ensure first-time-right quality before being moved to perform the next function. A fixed-value type poka-yoke is implemented, whereby the color codes are fixed to a specific op- eration indicating its completion. A warning technique may also be introduced, whereby a black sticker of different shape may be stuck after the sticker indicating completion of the previous operation, to indicate that the current operation is incomplete and requires further processing. B. Postproject Sigma Level The solutions were proposed to the management, and post discussions were approved and implemented within the target date. Postimplementation, 36 defects were recorded during one month. Following similar calculations as in Table V, a DPMO of 2521 was achieved, short-term and long-term sigma values of 4.3 and 2.8, respectively. The manufacturing plant was able to improve its overall production line sigma level from 3.3 (preimplementation) to 4.3 (postimplementation) with 99.739% yielding by reducing the number of rejections/reworks of reamers. The LSS framework was effectively implemented to improve the performance of the reamer production line. It was earlier mentioned that it takes an average of 20 d to manufacture a single carbide-based reamer. Postimplementation, the cycle-time reduced to an average of 17.6 d, indicating a 12% reduction. Also, the goal of reducing reworks and ultimately cycle time was achieved within the target time. C. Application of the SDMMAICS–DEMATEL Previous quality projects in the case organization indicated that the scenarios, where the multicriteria analysis was required, it posed as a threat for project stalling. This halt in project ac- tivities is related to the wastage of time and increased expenses. Based on prior knowledge and experience alone, practitioners used Pareto analysis, where multiple criteria were observed to be possible root causes. Under such a scenario, practitioners have gone back and forth with brainstorming sessions, assessing each criterion rather than selecting the most prominent cause factor. Similarly, in the case organization indicated that such efforts previously resulted in poor cost-benefit. Before, the multi-CTQ issues were addressed without a standard approach for better solutions, which ultimately turned out to be a costly affair. However, in the case illustration, the LSS team provide a clear analysis for multidimensions with the DEMATEL technique embedded in the improve phase to identify a key cause. The LSS team was then able to focus their attention on improving the issues related to the brazing operation, which was exposed to impurities. Moreover, the DEMATEL can choose the better alternatives and is not influenced by the ineffective due to low- frequency outputs and overcomes the biases and nonlinearity in the relationship among the evaluated factors in terms of cause and effect for better improvement initiatives. The SDMMAICS model proved to be a significant improve- ment to DMAIC previously followed in the case organization. Previous efforts in continuous improvement under DMAIC showed misalignment of the project to the organizational goals. Projects failed before they started, meaning, projects were not aligned with the shop floor workers leading to poor results. Previous attempts at DMAIC did not insist on better manufac- turing practices, due to restraining among the stakeholders for the project initiation. Moreover, it was noted that LSS projects previously deployed did not yield lasting results in organizations and the LSS practitioners were focused on completing the project and moving over to the next before ensuring outcomes are sus- tained. The SDMMAICS framework perfectly addressed these issues in our case study. It was foremost ensured project aligned with the business goals in the sustain phase. The execution of the LSS model included personnel from operations level to management, thereby making the project a combined effort with knowledge transfer during and postproject through the transfer of project documents. Furthermore, previous studies in the orga- nization have indicated that lack of training programs is a major limitation. We, therefore, proposed a well-structured KAIZEN model to make sure the LSS teams’ efforts were documented and training manuals created and handed over to the management. Authorized licensed use limited to: UNIVERSIDADE DE SAO PAULO. Downloaded on March 08,2025 at 14:03:42 UTC from IEEE Xplore. Restrictions apply. 2910 IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, VOL. 69, NO. 6, DECEMBER 2022 For this case study, there was the involvement of a Black Belt, Postgraduate student, professors, and the product line experts from the manufacturing unit itself. This facilitated the industry– academia collaboration that is otherwise lacking in the emerging economies. We recommend further projects in industries be conducted in collaboration with academia to overpass the gap be- tween the education and industrial sector. The case methodology was followed under the SDMMAICS framework with DEMA- TEL embedded into the framework. The SDMMAICS model was selected due to the ineffectiveness of DMAIC projects executed previously by the case organization. The SDMMAICS fits perfectly to address the DMAIC shortcomings faced previ- ously. Furthermore, with the inclusion of DEMATEL, the LSS team was able to analyze multiple CTQ dimensions, where low-frequency outputs are observed. Its application enhanced management of the project, resulting in the identification of a key root cause based on which a crucial improvement effort was made in the reamer line. In this article, we propose a KAIZEN approach, further adding to the LSS toolbox along with DE- MATEL. The KAIZEN element was introduced into the sustain phase as it is good practiceto ensure long-term sustenance of project outcome. The SDMMAICS–DEMATEL was applied in the reamer line of the case organization. Excess reworks within the production line resulted in a long cycle time of about 20 d, resulting in only 70% adherence to on-time delivery of final products. Therefore, the management approved deploying the LSS continuous improvement initiative to improve the quality of reamer production and ultimately improve customer satisfac- tion. VI. CONCLUSION A. Research Implication This article contributes to the LSS-based literature by de- veloping a hybrid approach of SDMMAICS–DEMETAL for a business process to prioritize the key dimension in the processes and address the nonlinearity in the process activities. Further, the project sustenance was buttressed using the KAIZEN approach in the sustain phase. Adding to the literature and acts as a reference for LSS practitioners who wish to forego the traditional application of DMAIC by adding the “select,” “map,” and “sus- tain” phases. This framework focused on both process and data- oriented approaches unlike DMAIC, which made senior leaders sustain interest levels throughout the LSS project. The case illus- tration resulted in a reduction in defects and ultimately reduction of cycle time. The improvement in efficiency translated to better quality output in the improve phase by identifying the cause and effect in the EDM process and evaluating the nonlinearity rela- tionship among the process dimension of the brazing activities in the improve phase. Further, the values of D–R obtained from the DEMETAL, we classify the process dimension as cause factors, and for those values below zero are effect factors. From, the D+R values, we can understand the prominence of each factor and its contribution to the process evaluation. B. Practical Implications The use of SDMMAICS–DEMETAL in this article is a sys- tematic hybrid approach for LSS project deployment in both the manufacturing and service sectors. Moreover, the hybrid approach has changed the way organizations handle problems related to processes carried out within the firm. In the manufac- turing sector, LSS leads to tangible improvements in products being made and reduces costs associated with manufacturing. The overall quality of manufacturing lines can be improved through the application of LSS tools and techniques. The study presented is an example of how applying LSS using the SDM- MAICS methodology incorporated with an MCDM technique can change the process and mindset of management and front- end operators. The inclusion of DEMATEL was an effort to analyze a case where multiple CTQs were involved and the non- linearity in their relationship was to be determined. Practitioners may incorporate DEMATEL to reduce time in deciding the appropriate approach to multicriteria situations. This technique is scientifically approved to solve such problems. The successful implementation of LSS was achieved along with an improved mindset by reducing reworks within the reamer production line. This led to improved quality of reamers manufactured and higher satisfaction at the customers’ end. The study first reviewed the literature of lean and six sigma philosophies. The SDMMAICS– DEMATEL framework was deployed in the reamer line of a tool manufacturer in India. The application of LSS resulted in several proposals for implementation within the production line. Further, breaking the project only perspective, in the LSS project focus on specific output for the project success. However, adequate attention should be given to the side effect of the project too. In this article, defect reduction was the main focus of the LSS project, however, to improve the issues related to the EDM was clearly evaluated using the DEMETAL approach, to understand the cause and effect among the factors. Hence, the LSS project was carefully evaluated and parallelly the issue related to the EDM processes were analyzed to choose the key dimension in the EDM process. This scenario proves the LSS team had a broad view and understanding of all the perspectives of the LSS project and breaking the narrow focus for project metrics alone in the case evaluation. The postim- plementation sigma level was calculated, and it was found to have improved from 3.3 to 4.3. The cycle time for PCD reamer production was improved by 12% allowing for faster delivery of the finished product to the client. A KAIZEN approach was further introduced to ensure project results sustain and improve over time. During the conduct of this project, ideas across different levels of the organization were encouraged for analysis. Further, the SDDMAICS–DEMETAL for LSS projects allowed to solve business problems at the strategic and operational level to promote continuous improvement. Further, the LSS team was formed to promote employee engagement, which is crucial for continuous improvement. Furthermore, the participation of the line manager, engineers and operators, and experts from academia promoting idea creation promoting people perspec- tive. For, instance, employee inputs were instrumental in the force-field analysis for the project selection. Followed by the expert’s input for process evaluation in the improve phase empowering the employees and making them realize the use of the hybrid approach. Further, the study exhibit, the total participation of stakeholders, continuous improvement, and the participant leadership are the three important enablers for the Authorized licensed use limited to: UNIVERSIDADE DE SAO PAULO. Downloaded on March 08,2025 at 14:03:42 UTC from IEEE Xplore. Restrictions apply. KRISHNAN et al.: DEVELOPING A HYBRID APPROACH FOR LEAN SIX SIGMA PROJECT MANAGEMENT 2911 successful LSS project [52]. So, we can say that organization leaders are vital in deploying LSS [56], right from strategy building to realizing benefits. The changes that can be expe- rienced internally because of LSS are the transfer of knowledge from the project to the company know-how and organizational culture. Also, the users of this methodology can benchmark their results with other quality initiatives in other organizations, to enhance competitive advantage and result in better customer satisfaction. C. Limitations and Future Scope This article was limited due to the unavailability of data to measure the financial gains achieved through the SDMMAICS– DEMATEL model and the short-time frame for study offered LSS study under this framework only in the reamer line. This article could go further into doing a cost analysis, however, due to the discretion of the company in providing data related to cost, a cost analysis was not done. This meant that it was not possible to identify the monetary benefits of this project. Furthermore, the process parameters were evaluated in the mea- sure phase. However, there is a need to reduce the noise factor in the process and choose the optimum setting for the reamer production. Therefore, the future researchers can use design of experiments to develop the optimal setting for the machining process. Moreover, the nonlinearity in the EDM process was identified in the improve phase and was addressed by the LSS team. Still, the nonlinearity is a challenging entity that needs to be evaluated further with the S-curve theory and also, the researchers can address the pattern (Inverted U shape or S shape) of the nonlinearity among the process dimensions, which can in- crease the project deliverables significantly. As the future scope of the study, two-dimensional outcomes need attention—First, to test and validate the hybrid model in the service sector; And second, exploring unique methods from various disciples to expand LSS application for process excellence. Furthermore, the proposed methodology could be expanded in the fuzzy and grey environment. APPENDIX Steps in DEMATEL Authorized licensed use limited to: UNIVERSIDADE DE SAO PAULO. Downloaded on March 08,2025 at 14:03:42 UTC from IEEE Xplore. Restrictions apply.2912 IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, VOL. 69, NO. 6, DECEMBER 2022 DEMATEL Data Authorized licensed use limited to: UNIVERSIDADE DE SAO PAULO. Downloaded on March 08,2025 at 14:03:42 UTC from IEEE Xplore. Restrictions apply. KRISHNAN et al.: DEVELOPING A HYBRID APPROACH FOR LEAN SIX SIGMA PROJECT MANAGEMENT 2913 ACKNOWLEDGMENT The authors would like to thank Prof. T. Daim (Editor), three excellent reviewers for their inputs and suggestions in refining the work to achieve publishing standards. Also, the authors would like to thank Prof. E. Kongar (Departmental Editor) for her unconditional support in the review activities during the COVID crisis. Disclosure statement: The authors declare that they have no conflict of interest. REFERENCES [1] R. D. Adikorley, L. Rothenberg, and A. Guillory, “Lean six sigma appli- cations in the textile industry: A case study,” Int. J. Lean Six Sigma, vol. 8, no. 2, 2017. [Online]. Available: https://doi.org/10.1108/ijlss-03-2016- 0014 [2] A. Saja, J. Antony, S. A. H. Lim, and Ton van derWiele, “Critical failure factors of lean six sigma: A systematic literature review,” Int. J. Qual. Rel. Manag., vol. 31, no. 9, pp. 1012–1030, 2014. [3] G. Barbato, G. Vicario, and R. Levi, “Measurement system analysis,” in Statistical Practice in Business and Industry, Coleman S, Greenfield T, Stewardson D, Montgomery, and D. C. Montgomery Eds. New York, NY, USA: Wiley, 2008. [4] S. Bhasin, Lean Management Beyond Manufacturing. Lean Manage- ment Beyond Manufacturing, 2015. [Online]. Available: https://doi.org/ 10.1007/978-3-319-17410-5 [5] G. Büyüközkan and D. Öztürkcan, “An integrated analytic approach for six sigma project selection,” Expert Syst. Appl., vol. 37, no. 8, pp. 5835–5847, 2010. [6] M. Chen and J. Lyu, “A lean six-sigma approach to touch panel quality improvement,” Prod. Plann. Control, vol. 20, no. 5, pp. 445–54, 2009. [7] T. Choi and Y C. Shin, “On-line chatter detection using wavelet-based parameter estimation,” J. Manuf. Sci. Eng., vol. 125, no. 1, pp. 21–28, 2003. [8] G. M. Duman, M. Taskaynatan, E. Kongar, and K. A. Rosentrater, “In- tegrating environmental and social sustainability into performance eval- uation: A balanced scorecard-based grey-DANP approach for the food industry,” Front. Nutrition, 2018, [Online]. Available: https://doi.org/10. 3389/fnut.2018.00065 [9] G. M. Duman, A. El-Sayed, E. Kongar, and S M. Gupta, “An intelligent multiattribute group decision-making approach with preference elicitation for performance evaluation,” IEEE Trans. Eng. Manag., vol. 67, no. 3, pp. 885–901, Aug. 2020. [10] D. Firka, “Six sigma: An evolutionary analysis through case studies,” TQM J., vol. 22, no. 4, pp. 423–434, 2010. [11] T. Gal, T. J. Stewart, and T. Hanne, eds., Multicriteria decision making. in International Series in Operations Research & Management Science. Boston, MA, USA: Springer US, vol. 21, 1999. [12] Gardner Business Intelligence, “Media usage in manufacturing,” Gardner Business Media Survey, 2017. [13] E. V. Gijo and T S. Rao, “Six sigma implementation – hurdles and more hurdles,” Total Qual. Manag. Bus. Excellence, vol. 16, no. 6, pp. 721–725, 2005. [14] E. V. Gijo and J. Scaria, “Reducing rejection and rework by application of six sigma methodology in manufacturing process,” Int. J. Six Sigma Competitive Adv., vol. 6, no. 1/2, pp. 77–90, 2010. [15] A. Gupta, P. Sharma, A. Jain, H. Xue, S. C. Malik, and P. C. Jha, “An integrated DEMATEL six sigma hybrid framework for manufacturing pro- cess improvement,” Ann. Oper. Res., to be published. [Online]. Available: https://doi.org/10.1007/s10479-019-03341-9 [16] F. S. Hillier and G. J. Lieberman, Introduction to Operations Research, 7th ed. New York, NY, USA: McGraw- Hill, 2001. [17] G. L. Hodge, K. G. Ross, J. A. Joines, and K. Thoney, “Adapting lean manufacturing principles to the textile industry,” Prod. Plann. Control, vol. 22, no. 3, pp. 237–47, 2011. [18] IBEF, “Indian manufacturing sector in India industry report,” 2020. [Online]. Available: https://www.ibef.org/industry/manufacturing-sector- india.aspx [19] C. Kahraman and G. Büyüközkan, “A combined fuzzy AHP and fuzzy goal programming approach for effective six-sigma project selection,” J. Multiple-Valued Logic Soft Comput., vol. 14, no. 6, pp. p599–615, 2009. [20] U. D Kumar, D. Nowicki, J. E. Ramírez-Márquez, and D. Verma, “On the optimal selection of process alternatives in a six sigma implementation,” Int. J. Prod. Econ., vol. 111, no. 2, pp. 456–67, 2008. [21] A. Lee-Mortimer, “Leading UK manufacturer probes the potential of six sigma,” Assembly Automat., vol. 27, no. 4, pp. 302–308, 2007. [22] W. Li, M. Winter, S. Kara, and C. Herrmann, “Eco-efficiency of manufac- turing processes: A grinding case,” CIRP Ann., vol. 61, no. 1, pp. 59–62, 2012.. [23] K. Mamatha, H. V. Vasuki, B. Jagadish Mogaveera, and C. K. Nagendra Guptha, “Application of six sigma methodology to reduce rework at earth- moving equipment,” Int. J. Eng. Sci. Technol., vol. 6, no. 7, pp. 417–22, 2014. [24] R. S. McLean, J. Antony, and J. J. Dahlgaard, “Failure of continuous improvement initiatives in manufacturing environments: A systematic review of the evidence,” Total Qual. Manag. Bus. Excellence, vol. 28, no. 3–4, pp. 219–37, 2017. [25] M. L. Meena, R. Jain, P. Kumar, S. Gupta, and G. S. Dangayach, “Process improvement in an Indian automotive part manufacturing company: A case study,” Int. J. Productiv. Qual. Manag., vol. 23, no. 4, pp. 524–551, 2018. [26] D. Meza and Ki-Y Jeong, “Measuring efficiency of lean six sigma project implementation using data envelopment analysis at NASA,” J. Ind. Eng. Manag., vol. 6, no. 2, pp. 401–422, 2013. [27] M. J. Harry, The Vision of Six Sigma: Tools and Methods for Breakthrough. Bucharest, Romania: Sigma Publ. Co, 1994. [28] P. Müller, G. Genta, G. Barbato, L. De Chiffre, and R. Levi, “Reaming pro- cess improvement and control: An application of statistical engineering,” CIRP J. Manuf. Sci. Technol., vol. 5, no. 3, pp. 196–201, 2012. [29] J. F. G. Oliveira, E. J. Silva, C. Guo, and F. Hashimoto, “Industrial challenges in grinding,” CIRP Ann., vol. 58, no. 2, pp. 663–80, 2009. [30] M. A. Ortíz, H. A. Felizzola, and S. N. Isaza, “A Contrast between DEMATEL-ANP and ANP methods for six sigma project selection: A case study in healthcare industry,” BMC Med. Informat. Decis. Making, vol. 15, no. S3, 2015, Art. no. S3. [31] M. P.J. Pepper and T. A. Spedding, “The evolution of lean six sigma,” Int. J. Qual. Rel. Manag., vol. 27, no. 2, pp. 138–155, 2010. [32] P. I. B. Delhi, “MSME sector contributes significantly to indian economy,” Press Information Bureau, 2019, [Online]. Available: https://pib.gov.in/ Pressreleaseshare.aspx?PRID = 1579757 [33] R. Pinedo-Cuenca, P. G. Olalla, and D. Setijono, “Linking six sigma’s crit- ical success/hindering factors and organizational change (development),” Int. J. Lean Six Sigma, vol. 3, no. 4, pp. 284–98, 2012. [34] A. Prashar, “Process improvement in farm equipment sector (FES): A case on Six Sigma adoption,” Int. J. Lean Six Sigma. vol. 5, no. 1, pp. 62–88, 2014. [35] V. Raja Sreedharan, R. Raju, and S. Srivatsa Srinivas, “A review of the quality evolution in various organisations,” Total Qual. Manag. Bus. Excellence, vol. 28, no. 3/4, pp. 351–65, 2017. [36] R. Rathi, D. Khanduja, and S. K. Sharma, “Synergy of fuzzy AHP and Six Sigma for capacity waste management in Indian automotive industry,” Decis. Sci. Lett., vol. 4, no. 3, pp. 441–452, 2015. [37] S. J. Raval and R. Kant, “Study on Lean Six Sigma frameworks: A critical literature review,” Int. J. Lean Six Sigma, vol. 8, no. 3, pp. 275–334, 2017. [38] B. Rodgers and J. Antony, “Lean and six sigma practices in the public sector: A review,” Int. J. Qual. Rel. Manag., vol. 36, no. 3, pp. 437–55, 2019. [39] R. B. Ruben, P. Menon, and R. Sreedharan, “Development of a social life cycle assessment framework for manufacturing organizations, in Proc. Int. Conf. Prod. Oper. Manage. Soc., Dec. 2018,