Baixe o app para aproveitar ainda mais
Prévia do material em texto
Tekelec Confidential 1 I Tekelec. For What’s Next. This document is for informational purposes only, and Tekelec reserves the right to change any aspect of the products, features or functionality described in this document without notice. Please contact Tekelec for additional information and updates. Presented to TIM Brasile & Italia August 2012 Diameter Signaling Router - DSR Product Roadmap This document is for informational purposes only, and Tekelec reserves the right to change any aspect of the products, features or functionality described in this document without notice. Please contact Tekelec for additional information and updates. Tekelec Confidential 2 I Tekelec. For What’s Next. DSR: A Multi-Solution Diameter Agent Scalability and Connection Management Centralized Routing and Load Sharing Network Management Congestion Control TCP/SCTP IPv4/IPv6 Interworking Diameter Variant Mediation Network-wide PCRF Binding Roaming Steering MAP/Diameter Interworking HSS/MME/PCRF Topology Hiding Core & Routing 3G/LTE/IMS Policy Proxy 3G/LTE/IMS (Gx/Gxx/Rx/S9) Roaming Proxy LTE/IMS (S6/S9) Address Resolution Proxy LTE/IMS (S6/Cx/Dx/Sh/Dh) OFCS Session- based Routing OFCS Proxy 3G/LTE/IMS (Gz/Rf) OFCS Topology Hiding PCRF Topology Hiding IMS HSS Address Resolution LTE HSS Address Resolution HSS Topology Hiding OFCS Address Resolution Secure Interconnect Centralized Performance Management & Analytics: Diameter Intelligence Hub (DIH) Network Intelligence Cloud/OTT Proxy 3G/LTE/IMS (Rx, Sh, Ro) Cloud/OTT Topology Hiding OCS Proxy 3G/LTE/IMS (Gy/Ro) OCS Session- based Routing OCS Topology Hiding OCS Address Resolution Network-wide Session Correlation Secure Interconnect DSR EIR LTE (S13) LTE EIR Tekelec Confidential 3 I Tekelec. For What’s Next. Tekelec Confidential 3 I Tekelec. For What’s Next. DSR Product Roadmap Tekelec Confidential 4 I Tekelec. For What’s Next. DSR Roadmap Nomenclature COMMITTED Capability is currently under development within a specific product release TARGETED Capability is planned, however the specific product release for inclusion is not firm CONSIDERED Capability is currently being considered for inclusion in a product release FUTURE Capability is being contemplated for a future product release The purpose of this Product Roadmap is to make available to Tekelec's existing and prospective operators on a confidential basis certain information with respect to Tekelec's current product development plans, schedule and strategy. Please note that the Product Roadmap is provided for discussion purposes only and that the information concerning Tekelec's plans and schedules to develop, make available and release any of the products, features and functionality described herein is subject to change from time to time by Tekelec. This Product Roadmap is not intended either to commit or obligate Tekelec or any of its affiliates to pursue or undertake the development or release of any product, feature or functionality in accordance with any timetable, nor to constitute a license or any other right to use or acquire any product, feature or functionality described herein. Tekelec undertakes no obligation to update this Product Roadmap or any information contained herein. Tekelec Confidential 5 I Tekelec. For What’s Next. DSR Roadmap Content Core & Routing Roaming Proxy Address Resolution Proxy OFCS Proxy Cloud/OTT Proxy Network Intelligence Policy Proxy OCS Proxy Base DSR 3.0 DSR 6.0 DSR 4.0 DSR 5.0 Future June 2012 Aug. 2012 Q2 2013 Q4 2013 2014-15+ FOA Dates: : Denotes new feature content in the specific release & category DSR EIR Tekelec Confidential 6 I Tekelec. For What’s Next. DSR Roadmap Content Core & Routing •Congestion Control •Per-Connection Ingress MPS Control •Remote BUSY Congestion Control •Diameter Mediation •Range-Based Address Resolution (RBAR) •IP Front End (IPFE) (LA) Roaming Proxy •Mediation Based Topology Hiding Address Resolution Proxy •Full-Address Based Address Resolution (FABR) •NA Split Support for SDS/DSR OFCS Proxy •Off-Line Charging Proxy (LA) •Diameter Message Copy for CPA (LA) Policy Proxy •Policy DRA (Lab Only) •PCRF Segmentation Support Base •Routing & Connectivity Enhancements •SCTP Multi-homing •Capability Exchange Enhancements •Automatic Performance Data Export (APDE) •Bulk Import/Export of Configuration Data •DSR Support for Symantec NetBackup •Engineering Enhancements DSR 3.0 FOA June 2012 •Multiple Active DA-MPs •3-Tiered DSR Topology •Routing & PRT Enhancements •Alternate Routing Across Route Groups •Routing Option Sets •Multiple Pending Answer Timers •PRT Partitioning •32 DSR Local Nodes •Scheduled Bulk Export •Max Message Size •Engineering Enhancements DSR 4.0 LA FOA Aug. 2012 •Multiple Active DA-MPs •3-Tiered DSR Topology •Routing & PRT Enhancements •Alternate Routing Across Route Groups •Routing Option Sets •Multiple Pending Answer Timers •PRT Partitioning •32 DSR Local Nodes •Scheduled Bulk Export •Max Message Size •Engineering Enhancements DSR 4.0 GA Dec. 2012 •IP Front End (IPFE) •IPFE Support for SCTP Uni-Homing •User-Configurable Message Priority •Congestion Control •Remote Transport Congestion Control •Per-Connection Egress Message Throttling •IP Front End (IPFE) •IPFE Support for SCTP Uni-Homing •User-Configurable Message Priority •Congestion Control •Remote Transport Congestion Control •Per-Connection Egress Message Throttling •Peer Connectivity & Routing Enhancements •Policy DRA •PCRF Segmentation Support Network Intelligence •Diameter Intelligence Hub (DIH) •Off-Line Charging Proxy •Diameter Message Copy for CPA COMMITTED TARGETED TARGETED Tekelec Confidential 7 I Tekelec. For What’s Next. DSR Roadmap Content Core & Routing •IPFE Support for SCTP Multi-Homing •Message Copy •Congestion Control •Message Priority-Based Ingress Throttling •Message Priority-Based DSR Overload Control •Egress Message Throttling Enhancements (and Coordinated Connection PTR Limiting) •Latency-Based Load Distribution •Mediation Enhancements Roaming Proxy •MAP-Diameter •Topology Hiding (MME/HSS/Path) Address Resolution Proxy •Integrated Full & Prefix Lookups •SDS Subscriber Identity Grouping OFCS Proxy •Geo-Redundant Charging DRA (OFCS) •SPR Caching Base •APDE Enhancements •Security Enhancements •SBR Network Partitioning •DSCP Marking •User-Configurable KPI Alarm Thresholds •Centralized Configuration •SNMP Community String •Engineering Enhancements DSR 5.0 FOA Q2 2013 •IPv6 OAM Interfaces •TLS/DTLS Support •MMI/CLI (MM/Command Line Interface) •Decorated NAI •Engineering Enhancements DSR 6.0 FOA Q4 2013 •3rd Party Application Support •Redirect Client (DSR Support) •Radius-Diameter •LDAP-Diameter •Dynamic Peer Discovery Network Intelligence •DIH Enhancements •Redirect Server (RBAR/FABR Support) •Blacklist Support Policy Proxy •P-DRA Enhancements•MRA Replacement Support OCS Proxy •OCS Charging Proxy •Roaming Steering CONSIDERED CONSIDERED DSR EIR •LTE EIR Tekelec Confidential 8 I Tekelec. For What’s Next. DSR Nodal Capacities DSR Function Optional Capacity DSR 2.0 DSR 3.0 DSR 4.0 DSR 5.0 Max Relay MPS per DSR (MPS capacity will vary based on use case and features) 20,000 100,000 600,000 920,000 Database MPS N/A 80,000 525,000 805,000 Session Stateful MPS N/A N/A 450,000 690,000 Diameter Connections per DSR 64 2,000 12,000 12,000 Peer Routing Rules 200 1,000 10,000 10,000 Range-Based Routing Rules 1M 1M 1M IPFE Bandwidth (Gbps per IPFE pair) 1.5 3.2 3.2 Max IPFE client Connections 12,000 12,000 12,000 Concurrent Subscriber Binds (Charging SBR) 50M 50M 50M Address Resolution Subscriber Database Entries 75M 300M 500M Concurrent Subscriber Binds (Policy SBR) 100M 100M Tekelec Confidential 9 I Tekelec. For What’s Next. DSR Major Release Milestones Release Family Content (Feature) Lock Down (P0) Feature Requirements Lockdown (P1) Target FOA-Ready Date (P2) DSR 2.0 July 2010 October 2010 June 2011 DSR 3.0 July 2011 January 2012 June 2012 DSR 4.0 January 2012 June 2012 August 2012 DSR 5.0 July 2012 September 2012 May 2013 DSR 6.0 September 2012 December 2012 August 2013 Customer input will be evaluated for inclusion in the upcoming release until the P0 date. Requirements are finalized and release content is committed at the P1 date. P2 dates are committed after P1 is passed.
Compartilhar