Which of the following statements about risk management is FALSE? a. Risk management should be based on risk identification and specific actions i...

Which of the following statements about risk management is FALSE?

a. Risk management should be based on risk identification and specific actions in response to them.
b. Root cause analysis is the most appropriate tool for risk assessment, but not for investigating adverse events.
c. Quality and risk deal with different topics, so the tools of one practice do not apply to the other.
d. Monitoring and consultation are steps in the risk management cycle that encompass risk identification, analysis, assessment, and treatment.
e. Risk management comprises a set of techniques and scientific aspects dissociated from human and cultural factors.
a) a
b) b
c) c
d) d
e) e

Essa pergunta também está no material:

segurança do paciente e qualidade em serviço de saúde
1 pág.

💡 1 Resposta

User badge image

Ed Verified user icon

A alternativa falsa é a letra C: "Qualidade e risco lidam com tópicos diferentes, portanto, as ferramentas de uma prática não se aplicam à outra". Na verdade, a gestão da qualidade e a gestão de riscos estão intimamente relacionadas e muitas vezes se sobrepõem. As ferramentas de uma prática podem ser úteis na outra.

0
Dislike0

Faça como milhares de estudantes: teste grátis o Passei Direto

Esse e outros conteúdos desbloqueados

16 milhões de materiais de várias disciplinas

Impressão de materiais

Agora você pode testar o

Passei Direto grátis

Você também pode ser Premium ajudando estudantes

✏️ Responder

SetasNegritoItálicoSublinhadoTachadoCitaçãoCódigoLista numeradaLista com marcadoresSubscritoSobrescritoDiminuir recuoAumentar recuoCor da fonteCor de fundoAlinhamentoLimparInserir linkImagemFórmula

Para escrever sua resposta aqui, entre ou crie uma conta

User badge image

Outros materiais