What is the rule regarding the liability of the contractor for the solidity and safety of the work in a contract for the construction of buildings ...

What is the rule regarding the liability of the contractor for the solidity and safety of the work in a contract for the construction of buildings or other considerable constructions?

The contractor is liable for the solidity and safety of the work for an irrevocable period of five years.
The contractor is not liable for the solidity and safety of the work.
The contractor is liable for the solidity and safety of the work for a period of two years.
The contractor is liable for the solidity and safety of the work for a period of three years.
The contractor is liable for the solidity and safety of the work for a period of four years.

Essa pergunta também está no material:

Direito Civil _ Pdf de conteúdo 41 Exame
161 pág.

Oab Universidade Estácio de SáUniversidade Estácio de Sá

💡 1 Resposta

User badge image

Ed Verified user icon

A regra referente à responsabilidade do contratante pela solidez e segurança da obra em um contrato de construção de edifícios ou outras construções consideráveis é que o contratante é responsável pela solidez e segurança da obra por um período de cinco anos irrevogáveis. Portanto, a alternativa correta é: "O contratante é responsável pela solidez e segurança da obra por um período de cinco anos irrevogáveis".

0
Dislike0

✏️ Responder

SetasNegritoItálicoSublinhadoTachadoCitaçãoCódigoLista numeradaLista com marcadoresSubscritoSobrescritoDiminuir recuoAumentar recuoCor da fonteCor de fundoAlinhamentoLimparInserir linkImagemFórmula

Para escrever sua resposta aqui, entre ou crie uma conta

User badge image

Outros materiais