Prévia do material em texto
SECTION II-A ASSEMBLY OF 30,000 - POUNDS CAPACITY STANDARD SUPER "I," HYDRAULIC UNIVERSAL TESTING MACHINE SINGLE CABINET DESIGN REFER: Assembly Figures 2A-1, 2A-2 and B. ASSEMBLY enclosed outline and general arrangement prints. 1. The single unit Super "L" testing ma- chine is usually shipped assembled. In some A. PRELIMINARY INSTALLATION cases, machines are shipped with the cross- head and columns removed. 1. Locate packing list and carefully un- crate and remove skids check parts and units 2. Assembly of Columns and Top Cross- against packing list to make sure shipment is head. complete. a. Locate identification numbers on col- umns and matching numbers on 2. Machine should be uncrated at or near weighing table before lowering them its permanent location. It is recommended that the machine be located in an area where down into their respective positions vibrations are at a minimum and that the in the weighing table, and then tight- ly secure. atmosphere is free from acidic or contaminat- ing fumes which could possibly accelerate cor- b. Position and align the top crosshead rosion to machined surfaces or electrical con- to ends of columns (large opening in tacts. center of crosshead facing up and grip crank shaft toward the front of 3. The machine should be positioned, al- the machine.) lowing sufficient space (minimum of 4 feet) at the sides and rear for working space in Assemble nuts supplied to upper ends calibrating or servicing. of columns and tighten to secure top crosshead permanently in position. 4. The machine should be accurately level- ed using the weighing table as the leveling surface. It is recommended that the machine be bolted to the floor or foundation. 5. Clean off machined surfaces that have been coated with rust preventative; use trich- loroethylene, gasoline, or any suitable non- corroding solvent. Wipe machined surfaces with a clean, oil soaked rag to minimize rust- ing. 6