In a shelter for flammable product waste, the builder made the impermeable floor, built a liquid retention box, placed signage and normal lighting....
In a shelter for flammable product waste, the builder made the impermeable floor, built a liquid retention box, placed signage and normal lighting. What mistake was made?
a) The impermeable floor was not made of asphalt. b) The shelter is correct. c) It was necessary to create the identified path. d) Explosion-proof lighting was not installed. e) Personal Protective Equipment (PPE) was not provided for employees.
O erro cometido foi a falta de instalação de iluminação à prova de explosão, conforme exigido pela norma regulamentadora NR-20. A alternativa correta é a letra D.