In a shelter for flammable product waste, the builder made the impermeable floor, built a liquid retention box, placed signage and normal lighting....

In a shelter for flammable product waste, the builder made the impermeable floor, built a liquid retention box, placed signage and normal lighting. What mistake was made?


a) The impermeable floor was not made of asphalt.
b) The shelter is correct.
c) It was necessary to create the identified path.
d) Explosion-proof lighting was not installed.
e) Personal Protective Equipment (PPE) was not provided for employees.

Essa pergunta também está no material:

Tratamento e disposição de residuos solidos9
3 pág.

Tratamento e Disposição de Resíduos Sólidos Universidade Estácio de SáUniversidade Estácio de Sá

💡 1 Resposta

User badge image

Ed Verified user icon

O erro cometido foi a falta de instalação de iluminação à prova de explosão, conforme exigido pela norma regulamentadora NR-20. A alternativa correta é a letra D.

0
Dislike0

✏️ Responder

SetasNegritoItálicoSublinhadoTachadoCitaçãoCódigoLista numeradaLista com marcadoresSubscritoSobrescritoDiminuir recuoAumentar recuoCor da fonteCor de fundoAlinhamentoLimparInserir linkImagemFórmula

Para escrever sua resposta aqui, entre ou crie uma conta

User badge image

Outros materiais